首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
admin
2016-03-08
58
问题
Which Low Carbon Technology Is Now a Reality?
A)With fossil fuels expected to supply over 70% of the world’s energy needs by 2040, we face some urgent questions: where should efforts be focused in reducing greenhouse gas emissions? Which technologies hold the most promise? There are a range of low-carbon solutions and given the challenge, we will need them all. We hear a lot about the advances being made by refreshable sources of energy such as solar, wind and hydro-electricity and these are certainly valuable technologies in combating climate change. But how can we really make a major impact in reducing carbon emissions from large power plants and industrial facilities? Enter carbon capture and storage—or CCS—a technology that captures CO
2
from fossil fuel production and permanently stores it underground.
B)The aim is to prevent the release of large quantities of CO
2
into the atmosphere(from fossil fuel use in power generation and other industries). It is a potential means of relieving the contribution of fossil fuel emissions to global warming and ocean acidification(酸化). Although CO
2
has been injected into geological formations for several decades for various purposes, including enhanced oil recovery, the long term storage of CO
2
is a relatively new concept. The first commercial example was Weyburn in 2000. CCS can also be used to describe the scrubbing(涤气)of CO
2
from environmental air as a climate engineering technique.
C)In November 2014 the Global CCS Institute released its flagship(核心的)publication—the annual Global Status of CCS report. This comprehensive annual update is the prominent source of information on the development of CCS around the world. A lot of work went into updating information in the report, in cooperation with the CCS industry, as there had been quite significant changes to the CCS landscape in the preceding 12 months. This included the launch of a large-scale CCS project in the power sector and the beginning of construction of the world’s first large-scale CCS project in the iron and steel sector.
D)Large-scale CCS is now a reality in the power sector with the October 2014 launch of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project in Saskatchewan, Canada. Boundary Dam is the first commercial, CCS plant in the power sector, removing 90 per cent of the CO
2
produced by electricity generation from lignite(褐煤)coal at Production Unit No. 3 of the SaskPower facility. The captured CO
2
is primarily used for enhanced oil recovery(EOR)at the nearby Weyburn oil field, although amounts are also to be stored in deep geological formations at the Aquistore site. The success of the Boundary Dam project and the progression of additional projects through planning and construction, indicates that CCS technologies for application in the power sector are " market ready".
E)The next 18 - 24 months will see CCS be applied across a range of industries and storage types. A further two large-scale CCS power projects are in construction in the US—the Kemper County Energy Facility in Mississippi and the Petra Nova Carbon Capture Project in Texas. Both projects are expected to be operational in 2016. Also in the US, the Illinois Industrial CCS project planned for launch later this year will capture CO
2
from the Archer Daniels Midland corn-to-ethanol(乙醇)plant in Decatur, Illinois for storage in an onshore deep saline formation. The Abu Dhabi CCS project in the United Arab Emirates is under construction and from 2016 will provide the world’s first large-scale demonstration of CO
2
capture from iron and steel production.
F)In addition to the 22 large-scale CCS projects currently in operation or construction around the world, 14 projects are in advanced stages of planning, many of which are likely to be in a position to make a final investment decision over the coming year. Together this group of projects covers a range of applications for CCS and could extend to around ten in the number of large-scale CCS projects operating in the power sector by the end of the decade. Their progression to operation would add experience in the dedicated geological storage of CO
2
and see operational large-scale CCS activity extend to China for the first time.
G)2014 saw commercial application in the power sector become a reality and we can look forward to a further expansion across a diverse range of industries in the coming years. The Global CCS Institute continues to cover developments in CCS with up-to-date information, expert insights, workshops, media releases and online seminars. We struggle to make CCS industry information easily accessible and encourage you to engage with us via our website and regular publications.
H)For detailed information on large-scale CCS projects please visit our online Projects page, which you can browse or search for projects based on stage, region, industry or capture, transport and storage type. For the first time the Institute’s website contains project descriptions for around 40 lesser scale "remarkable" CCS projects, of which four Japanese "remarkable" CCS projects were the key focus of a chapter in the Global Status of CCS report. For ongoing expert information visit our Insights page, which is regularly updated with articles from experts in carbon capture and storage, public engagement, legal issues and policy developments.
I)To join in the discussion you can attend meetings and workshops around the world, and participate in online seminars where you will have the opportunity to listen to and ask questions of a range of experts. Visit our Events page to see upcoming meetings, conferences, workshops and seminars. Finally, for a range of up-to-date news and more detailed information, visit our news and publications sections. We look forward to covering this exciting period in the development of CCS and providing you with the latest information and important issues for the sector.
Information about CCS development all over the world can be obtained from the annual Global Status of CCS report.
选项
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/5Le7777K
0
大学英语四级
相关试题推荐
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
TheUnitedStates’predominanceinscienceandtechnologyisfading,areportreleasedthismonthbytheNationalScienceBoard
TheUnitedStates’predominanceinscienceandtechnologyisfading,areportreleasedthismonthbytheNationalScienceBoard
TheUnitedStates’predominanceinscienceandtechnologyisfading,areportreleasedthismonthbytheNationalScienceBoard
TheUnitedStates’predominanceinscienceandtechnologyisfading,areportreleasedthismonthbytheNationalScienceBoard
随机试题
下列哪些是抢救羊水栓塞的措施
某患者,男,40岁,患肠外阿米巴病,用甲硝唑治疗无效,可选用以下哪种药物
CR应用数字成像处理技术把从IP上阅读到的X线影像数据变换为能进行诊断的数字图像,这些数据能够在CRT上显示,也可以通过胶片进行记录;对X线曝光条件一定范围内不适宜导致的曝光过度或曝光不足,CR系统也能够通过调节,得到密度和对比度均理想的影像,实现这种功能
A.对致畸作用的感受性最强B.对经胎盘致癌的敏感性降低C.受有害因素影响可导致经胎盘致癌的敏感性增高D.受有害因素影响可导致遗传病E.受有害因素影响可导致不育或生育力下降人胚在器官形成期
A.医用缝合线B.刀片及剪刀C.橡胶管D.乳胶手套E.输尿管导管0.1%新洁尔灭浸泡1h适用于()。
根据《建设工程质量管理条例》,建设工程竣工验收应当具备的条件包括()。
根据《会计法》的规定,()应当保证会计机构、会计入员依法履行职责,不得授意、指使,强令会计机构、会计入员违法办理会计事项。
甲、乙、丙三位同学在基督教教堂门口,见一神父在教堂内讲《圣经》。甲说:“宗教有助于提高道德修养,我们进去学习一下。”乙说:“宗教是毒害人民的精神鸦片,我们进去用无神论批判它。”丙说:“神父在搞封建迷信活动,我们去公安局告他。”下列对三位同学的看法分析正确的
请认真阅读下列材料,并按要求作答。问题:指出上述材料的教学重点、难点。
一艘轮船发生漏水事故。当漏进水600桶时,两部抽水机开始排水,甲机每分钟能排水20桶,乙机每分钟能排水16桶,经50分钟刚好将水全部排完。那么,每分钟漏进的水有()桶。
最新回复
(
0
)