Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
49
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M10】
选项
答案
ACTUALLY
解析
be expected to do意为“被期望做某事”,修饰动词的副词应放在do的后面,且ACTUALLY与此处语义不符,故多余。
转载请注明原文地址:https://kaotiyun.com/show/8eoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
ThemergerwasexpectedtohelpthecombinedcompanytoThecompanydecidedtosellsomeofitspremisesinorderto
WhatdoPOPprojectsaimtodo?SamsungbelievesthatPOPwillworkforthembecause
WhatdoesKatherinedislikeaboutthecourse?Shebelievesthatmanagementislikelyto
OutsourcingreferstoInthepastoutsourcingwaslimitedtoareaslike
•Lookatthenotesbelow.•YouwillheartwocolleaguesdiscussingtheresponsibilitiesofHumanResourcesManagerJobDe
•Youwillhearfivespeakerstalkingaboutbusinesstrips.•Foreachrecording,choosethereasonthespeakergivesforthetr
YouaretheHumanResourcesManagerofaninsurancecompany.Youwanttoarrangea2-dayteam-buildingeventwithTeam-Plusfor
—Readthearticleaboutinterviewbelow.—Choosethebestsentencetofillineachofthegaps.—Foreachgap8-12,markonelet
随机试题
光纤吹缆机连接或拆管前,应保持其内的压力。()
关于市场风险下列说法正确的是()。
不符合肺癌特点的是
关于经颈静脉肝内门体分流术,下列哪一项不正确
下列方法属于事故风险源项的定性分析方法的有()。
某工地检测新进场的一批砌块的强度,这一批购进的砌块为MU30普通砖和MUl5灰砂砖各12万块,应划分()个检验批。
______somethingdrastichappensbeforemidnight,thepostalworkerswillmostlikelywalkoutontheirjobs.
我国《刑法》规定,国家考试中,组织作弊情节严重者可判处()有期徒刑并处罚金。
设X为总体,E(X)=μ,D(X)=σ2,X1,X2,…,Xn为来自总体的简单随机样本,S2=,则E(S2)=_________.
【B1】【B3】
最新回复
(
0
)