首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
admin
2019-06-25
50
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1, 172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
According to the passage, the workers can______in case of pipeline leaks.
选项
A、report it to the local government
B、ask people to leave the leak affected areas
C、call 911
D、close valves
答案
D
解析
细节题。定位到文章第三段第二句“Workers will also monitor it remotely,and will be able to close valves within three minutes if leaks are detected.”可知,工人们可以进行远程监控,如果发现有泄漏,他们可以在3分钟之内关上阀门。A、B、C三项均未在文中提及。故选D。
转载请注明原文地址:https://kaotiyun.com/show/Rq3O777K
0
成人本科学位英语
相关试题推荐
______inthepasthewasextremelyself-centered,nowhehasgenuineconcern,forothers.
Doyouknowinsurance(保险)?Buyinginsuranceisameansbywhichpeoplecanprotectthemselves【C1】______largelosses.Protection
Manyayoungpersontellsmehewantstobeawriter.Ialwaysencouragesuchpeople,butIalsoexplainthatthere’sabigdif
Thedestructionofthesehistoricbuildingswasalossformankindthatnoamountofmoneycould______.
Whetherwayswillbefoundtopreventpollutionornotisjust______worriesthepublic.
ToswimacrosstheEnglishChanneltakesatleastninehours.It’sahardworkanditmakesyoushortofbreath.Toflyoverthe
Hismotherinsistedthathe()thecoatwhengoingout.
Wefindthatbrightchildrenarerarelyheldbackbymixed-abilityteaching.Onthecontrary,boththeirknowledgeandexperienc
DeathValleyisoneofthemostfamousdesertsintheUnitedStates,coveringawideareawithitsalkalisand.Almost20percen
Forreasonsofsafetyandeaseofmaintenance,Washingtonanddozensofothercommunitiesarebuildingrubbersidewalksmade【C1】
随机试题
前置型游梁式抽油机下冲程时,曲柄旋转约()。
我国政府关于台湾问题的基本立场是()
符合“核酶”特征的是
在评标委员会成员中,不能包括( )。
甲公司于2012年1月1日,为建造某工程项目专门以面值发行公司债券4000万美元,年利率为6%,期限为3年。合同约定,每年1月1日支付利息,到期还本。工程于2012年1月1日开始实体建造,2013年12月31日完工,达到预定可使用状态,期间发生的资产支出如
外国合营者的下列出资方式中,符合中外合资经营企业法律制度规定的是()。
下列对中期会计报表的有关表述中,正确的有()。
中国各大菜系中,味型以咸鲜为主并善于用葱香调味的菜系是()。
把文学称为“人学”的作家是()。
Engineeringstudentsaresupposedtobeexamplesofpracticalityandrationality,butwhenitcomestomycollegeeducation,Ia
最新回复
(
0
)