首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Going on computer may be the toughest job a remodeling contractor ever does. In order to make a conversion within a year, a comp
Going on computer may be the toughest job a remodeling contractor ever does. In order to make a conversion within a year, a comp
admin
2010-05-25
38
问题
Going on computer may be the toughest job a remodeling contractor ever does. In order to make a conversion within a year, a company will need to make a major shakeup. This does not mean it will take a year to start using the computer for one function such as estimating, accounting, or word processing. The total conversion process will not be accomplished in a short period with little effort. A contractor in Indiana recently said he wished someone had warned him about how tough it was going to be. With an annual volume of more than $ 500,000 and a good staff in place he still had fear.
For effective use of the computer in a remodeling business, a complete change in methods of doing business usually is required. All management staff must get involved. Changes may include pre-selecting and standardizing products and systems. Developing specifications, changing the estimating system, and requiring more detailed information on time card. The list goes on and on. Without the support and active leadership of top management, this process, in all likelihood, will be fought by employees and will fail.
It is true that as computer can save money by stepping up the speed of estimating and making job costing, bookkeeping, and accounting more efficient. Word processing will certainly reduce time in typing contracts, writing letters, and so on. Still, most companies do not save money using the computer. Once they have mastered the basic computer operation, they become so enthralled with its ability to do other things they never considered when it was purchased.
The computer business is changing so fast that a company on computer will want to spend money on the latest hardware, newest software, and so on. That is the bad news. The good news is that the computer simply revolutionizes the company’s ability to manage and innovate. The change in management methods, the ability to use numbers, and other new capabilities provide greater control over the company and allow it to grow and make more money.
In" they become so enthralled ..." (Para 3)," enthralled" here means ______.
选项
A、shocked
B、fascinated
C、puzzled
D、uncertain
答案
B
解析
词汇题。enthralled在句中的意思为:着迷的,与fascinated的意思最接近。
转载请注明原文地址:https://kaotiyun.com/show/SV2K777K
0
专业英语四级
相关试题推荐
Itwasdifficultto______adatewhichwasconvenientforeveryone.
Duringrecentyearswehaveheardmuchabout"race":howthisracedoescertainthingsandthatracebelievescertainthingsand
Duringrecentyearswehaveheardmuchabout"race":howthisracedoescertainthingsandthatracebelievescertainthingsand
Aestheticthoughtofadistinctivelymodernbentemergedduringthe18thcentury.Thewesternphilosophersandcriticsofthist
Afterthefailureoffrostytalks,anall-outwarispossibletobreakoutbetween______.
Breadandbutter______myfavouritebreakfastwhenIwasstudyingintheStates.
Noonecandenythatpesticidehaveimprovedtheabilityoffarmerstobringtheircropstomarket.【C1】______pesticides,farmer
Thisisthelifeofsomeonewhowrotelittle,spokelittle,andaboutwhomtherearefewmemories.Yetifanyone’slifeisworth
Thesunroseuponatranquilworld,andbeameddownuponthepeacefulvillagelikeabenediction.Breakfastover,AuntPollyhad
随机试题
焊接工件场所应符合哪些要求?
因严重违反《传染病防治法》及有关法律规定,按照《刑法》,判处3年以下有期徒刑或拘役,并处或单处罚金的违法犯罪行为是
泡腾颗粒剂的溶化时限为
处理不协调性子宫收缩乏力的首选措施是
潜水径流强度的大小与下列哪个因素无关:
质量管理常用的统计方法不包括( )。
1.背景某本地网架空线路工程施工地点位于山区,建设单位通过招标选定了一家具有通信工程专业乙级监理资质的监理单位和一家具有通信工程施工总承包一级资质的施工单位,工程施工合同规定按月进度付款。监理单位在工程开工后向建设单位报送了监理规划,并向建设单
财产清查的范围仅限于所有权属于企业的各种财产物资和债权债务。( )
计算
HowlongdidittakeforalettertogettotheUSAsixyearsago?
最新回复
(
0
)