首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Industrial production managers coordinate the resources and activities required to produce millions of goods every year in the U
Industrial production managers coordinate the resources and activities required to produce millions of goods every year in the U
admin
2017-03-25
43
问题
Industrial production managers coordinate the resources and activities required to produce millions of goods every year in the United States. Although their duties vary from plant to plant, industrial production managers share many of the same major responsibilities. These responsibilities include production scheduling, staffing, procurement and maintenance of equipment, quality control, inventory control, and the coordination of production activities with those of other departments.
The primary mission of industrial production managers is planning the production schedule within budgetary limitations and time constraints. They do this by analyzing the plant’s personnel and capital resources to select the best way of meeting the production quota. Industrial production managers determine, often using mathematical formulas, which machines will be used, whether new machines need to be purchased, whether overtime or extra shifts are necessary, and what the sequence of production will be. They monitor the production run to make sure that it stays on schedule and correct any problems that may arise.
Industrial production managers also must monitor product standards. When quality drops below the established standard, they must determine why standards are not being maintained and how to improve the product. If the problem relates to the quality of work performed in the plant, the manager may implement better training programs, reorganize the manufacturing process, or institute employee suggestion or involvement programs. If the cause is substandard materials, the manager works with the purchasing department to improve the quality of the product’s components.
Because the work of many departments is interrelated, managers work closely with heads of other departments such as sales, procurement, and logistics to plan and implement company goals, policies, and procedures. For example, the production manager works with the procurement department to ensure that plant inventories are maintained at their optimal level. This is vital to a firm’s operation because maintaining the inventory of materials necessary for production ties up the firm’s financial resources, yet insufficient quantities cause delays in production. A breakdown in communications between the production manager and the purchasing department can cause slowdown and a failure to meet production schedules. Just-in-time production techniques have reduced inventory levels, making constant communication among the manager, suppliers, and purchasing departments even more important. Computers play an integral part in this coordination. They also are used to provide up-to-date information on inventory, the status of work in progress, and quality standards.
Production managers usually report to the plant manager or the vice president for manufacturing, and may act as liaison between executives and first-line supervisors. In many plants, one production manager is responsible for all aspects of production. In large plants with several operations, there are managers in charge of each operation, such as machining, assembly, or finishing.
The procurement department is in charge of______.
选项
A、purchasing the production materials
B、distributing the inventories in stock
C、controlling the quality of the products
D、making constant communication with other departments
答案
A
解析
本题可参照第四段。在这段中举例讲了工业生产经理与procurement部门负责人合作时,对这部门的工作做了补充说明“the production manager works with…maintained at their optimal level.”,并且后文还说“…between the production manager and the purchasing department…”,直接说明procurement department就是purchasing department,因此正确答案为A。
转载请注明原文地址:https://kaotiyun.com/show/2KGO777K
0
考博英语
相关试题推荐
ThetwoclawsofthematureAmericanlobsteraredecidedlydifferentfromeachother.Thecrusherclawisshortandstout;thec
Ifallthevirusesontheplanetweretodisappear,aglobalcatastrophewould______,andthenaturalecosystemsoftheearthw
Anumberofresearchershaveexaminedthevariables/strategiesthataffectstudents’learningEnglishasasecondlanguage.This
Ateacherissomeonewhocommunicatesinformationorskillsothatsomeoneelsemaylearn.Parentsarethe【C1】______teachers.
There’sonegirlatmyschoolwhoeverybody____becauseshedoesn’twearwhateverybodyelsewears;theyarehorribletoher.
Eversinceitsdiscovery,Plutohasneverreallyfittedin.AfterthepaleandglowinggiantNeptune.itislittlemorethanacos
Haveyoueverreceived_____ofwhathashappenedtoher?
Themostexcitingkindofeducationisalsothemost.Nothingcan【C1】______thejoyofdiscoveringforyourselfsomethingthatis
【T1】Determinedtomakeitonhisown,Bushdidnottellhisfatherthathewas’applyingtoHarvardBusinessSchool.【T2】The"Wes
SinceJapan______importancetoeducationandtechnologicalinnovation,itseconomyhasdevelopedatahighspeed.
随机试题
口对口人工呼吸的操作错误的是()。
对不可替代行为及不作为义务的执行,可采取以下哪些直接执行措施?()
图示一高压喷水入大气的喷嘴,喷嘴出口断面1—1的平均流速υ1为30m/s,喷至2—2断面的平均流速υ2减少为1m/s,不计水头损失,则喷射高度H为:
某地矩形基础埋深为1.5m,底面尺寸为2m×3m,柱作用于基础的轴心荷载F=900kN,弯矩M=310kN.m,(沿基础长边方向作用)基础和基础台阶上土的平均重度γ=20kN/m3,试问基础底面边缘最大的地基反力接近于下列哪个值?()
根据《风景名胜区规划规范》,下列选项中不正确的是()。
某工程施工单位按招标文件中提供的工程量清单作出报价(见表4一1)。施工合同约定:工程预付款为合同总价的20%,从工程进度款累计总额达到合同总价10%的月价开始,按当月工程进度款的30%扣回,扣完为止;施工过程中发生的设计变更,采用以直接费为计算基础的全费用
实际操作过程中,关联交易实际上是一种内幕交易,与市场竞争、公开竞价的方式不同,其价格可由关联双方协商,容易成为企业调节利润、避税和为一些部门及个人获利的途径,有利于保护中小投资。()
()是指货物在船到港前进入承运人指定仓库后,承运人应托运人的要求而签发的提单。
一项研究报告显示,在与孩子的相处中,爸爸的收获比妈妈要多。男性在扮演爸爸的角色时,会比单身男士有更多的幸福感和积极向上的情绪,研究提到,相反,女性却没有因为做妈妈而更幸福。有人认为这是因为妈妈们常常家务缠身的缘故。以下哪项如果为真,最能支持上述观点?(
条件"not工资额>2000"的含义是
最新回复
(
0
)