首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
• You will hear the opening of the Factories of the Year awards ceremony. • As you listen, for questions 1-12, complete the note
• You will hear the opening of the Factories of the Year awards ceremony. • As you listen, for questions 1-12, complete the note
admin
2010-01-31
42
问题
• You will hear the opening of the Factories of the Year awards ceremony.
• As you listen, for questions 1-12, complete the notes, using up to three words or a number.
• After you have listened once, replay the recording.
Notes on selection procedure
Panel of judges:
• Head of panel, Jacqueline Allen, teaches (1)______ at Barrington Business School
Selection process: first stage
• a questionnaire that was (2)______ long
Measurable performance criteria included:
• length of (3)______ which affect productivity
• success in achieving reliable (4)______ times
Less tangible performance criteria included:
• importance of (5)______ .
• how well companies deal with (6)______ .
Selection process: second stage
• judges compiled a (7)______ of factories to visit
Standard characteristics of winning factories included:
• effective procedures in the area of (8)______ .
• determination to be the best
• innovations that help to achieve the factory’s (9) ______ .
New characteristics of winning factories:
• excellence at (10)______ management
• provision of (11)______ to assist personnel and visitors in finding their way
• tracking flow of production, e.g. by using (12)______ .
Man: Good morning, ladies and gentlemen, and welcome to the Factories of the Year award. My name is Jonathan Hargreaves, and I’m Chief Executive of the Institute of Production Research, which organised these awards, in association with Barrington Business School. I’m delighted to introduce to you the school’s professor of manufacturing science, Jacqueline Allen, who again chaired the panel of judges. Jacqueline.
Woman: Thank you, Jonathan, and good morning, everyone. This year’s search for the Factories of the Year has produced a bumper crop of outstanding winners, which is very welcome proof that the old economy isn’t dead, but is emerging revitalised from its recent problems.
As ever, we initiated our search for the best by sending each participating factory a questionnaire. This consisted of fourteen pages and probably more questions than the recipients would have liked. From their answers, each factory was assessed on a basket of performance criteria. Some of these were immediately measurable, like handover times, which of course can have a big impact on productivity and which are showing a healthy tendency towards being shortened. Another was delivery reliability, a high score in which is essential for any customer-led organisation.
Other criteria which we considered were less tangible, but no less important for that. We took staff morale very seriously, because if it’s poor it can have measurable results such as high staff turnover and a high accident rate. And if a business can’t easily handle change, it may well create more problems than it solves, and its future is unlikely to be secure.
The next step was for the panel of judges to assess the results and devise a shortlist. We then visited these factories. I must say, I found it fascinating to see so many factories in action. As a result of these visits, we came up with the three winners in each category.
The factories that emerged from this process shared some familiar characteristics. Impressive people-management practices, for a start. A determination among the factory’s management team not to be second best, for another. And acting on the realisation that clever initiatives don’t count if they don’t further a factory’s mission. No successful factory can, for a moment, forget its customers, whether they’re internal to the company or external.
As ever, new trends emerged: an outstanding level of competence in supply-chain management, as well as in manufacturing, is increasingly important. The links between a factory, its suppliers and its customers can make or break an operation.
This year’s winners also demonstrate the importance of optimising the movement of goods and people around the factory. Confused, muddled-looking factories underperform, while successful ones use signs to help staff and visitors find the best route to their destination. And allowing goods or materials to get lost in some dusty corner of the warehouse is unacceptable: the problem of tracking components as they move through production has led to a number of developments, of which electronic tagging is one of the most exciting.
Now I’d like to turn to the individual categories...
选项
答案
SUPPLY(-)CHAIN
解析
转载请注明原文地址:https://kaotiyun.com/show/3POd777K
本试题收录于:
BEC高级听力题库BEC商务英语分类
0
BEC高级听力
BEC商务英语
相关试题推荐
Wheredoestheconversationhappen?
Wheredoesthisconversationtakeplace?
A、 B、 C、 D、 B图中有一些人在人行道上走着。只听到(A)中的bus,容易误选。从图中无法判断人们是否在等公共汽车,因此(C)错误。图中的公共汽车已经停靠在路边,(D)中的approach与图片不符
Whatarethelistenersaskedtodo?
Whattypeofbusinessdoesthemanhave?
Whohasthemancalled?
Whenistheflushingscheduledtobecompleted?
Whohasthemancalled?
Whatislearnedaboutthecompany’snewsletter?
WhyhasWilliamcalledNicole?
随机试题
子午线轮胎一般都是低压胎。()
患者,男性,53岁,发现鼻塞及左侧颈部包块、面部疼痛1个月余,查体左颈部有一质硬包块。MRI如下图所示以下关于本病的描述,不正确的是
乳腺囊性增生症的主要处理措施是
口腔科医生个人防护包括
小儿阴虚燥咳的首选方
下列有关直观检查的叙述中,不正确的是()。
聂耳的主要作品有()。
《公立医院改革试点指导意见》明确提出,公立医院要以()为核心,逐步取消药品加成,增设药事服务费,该项费用纳入医保。
某项工程,若王强单独做,需40天完成;若李雷单独做30天后,王强、李雷再合作20天可以完成。如果两人合作完成该工程,王强第一天工作但每工作一天休息一天,问:整个工程将会在第几天完成?
TheIcemanOnaSeptemberdayin1991,twoGermanswereclimbingthemountainsbetweenAustriaandItaly.Highuponamount
最新回复
(
0
)