首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
A. Benefiting from an earlier model B. Important operative conditions C. Examining the public confusion D. How it’s all linked u
A. Benefiting from an earlier model B. Important operative conditions C. Examining the public confusion D. How it’s all linked u
admin
2014-02-27
50
问题
A. Benefiting from an earlier model
B. Important operative conditions
C. Examining the public confusion
D. How it’s all linked up
E. Finding a suitable location
F. Comparing wind speeds in Australian cities
G. Matching operational requirements with considerations of appearance
Harvest time in Esperance is constant. As long as the wind blows — which is pretty much all the time — nine identical synchronized wind turbines reap the benefits of the dependable winds that gust up around the southern coastline of Western Australia. These sleek, white, robot-like wind turbines loom up on the horizon forming part of Australia’s first commercial wind farm. They’re not only functional machines that help provide electricity for this secluded coastal town, but increasingly, they’re also draw cards for curious tourists and scientists alike.
Because of its isolation, Esperance is not linked to Western Power’s grid which supplies electricity from gas-, coal- and oil-fired power stations to the widespread population of Western Australia. Before the wind turbines went in, Esperance’s entire electricity needs were met by the diesel power station in town.
【D1】______
The $5.8 million Ten Mile Lagoon project is not Esperance’s first wind farm. The success of a smaller, experimental wind farm, at a spot called Salmon Beach, encouraged the state’s power utility to take Esperance wind seriously. Today, the wind turbines at Ten Mile Lagoon work in conjunction with the diesel power station, significantly reducing the amount of the town’s electricity generated by expensive diesel power.
【D2】______
The wind farm is connected to the power station by a 33-kilovolt powerline, and a radio link between the two, allows operators to monitor and control each wind turbine. The nine 225-kilowatt Vestas wind turbines produce a total generating capacity of two megawatts and provide around 12 percent of the energy requirements of Esperance and its surrounding districts.
【D3】______
The power produced by a wind turbine depends on the size and efficiency of the machine and, of course, on the energy in the wind. The energy in the wind available to the wind turbines is proportional to wind speed cubed. Thus, the greater the wind speed, the greater the output of the turbine. In order to achieve optimum wind speeds, the right location is imperative. "You have to accept the nature of the beast," Mr. Rosser, Western Power’s physicist said. "As surface dwellers our perceptions of wind speeds are bad. As you go higher, wind speed increases significantly."
【D4】______
The most favorable wind sites are on gently sloping hills, away from obstructions like trees and buildings and where the prevailing winds are not blocked. Computer modeling was used to select the best site for Esperance’s wind farm. Scientists were concerned not only with efficiency, but also with protecting the coastal health environment which is rich in plant life and home to tiny pygmy and honey-possums, and a host of bird species. In addition, the wind farm is adjacent to Esperance’s popular scenic tourist drive.
【D5】 ______
Strict erosion controls have been implemented and access to the wind farm is limited to selected viewing areas. The wind turbine towers are painted white and devoid of corporate logos or signage. According to Mr. Rosser there is something of a worldwide backlash against wind farms with regard to their visual impact. "But because wind turbines perform best in the most exposed positions, they will always be visible. There is a very real need to balance environmental and technical requirements. I think the Ten Mile Lagoon Wind Farm sets the standards for environmentally friendly developments."
In fact, the project has become something of a tourist attraction in itself. Esperance shire president Ian Mickel said the wind turbines had been well accepted by locals. "We have watched the wind farm develop with great interest, and now we find visitors to Esperance are equally enthusiastic about it," he said. The aim now is to identify other remote locations where wind turbines will be a feasible means of supplementing existing power stations.
【D4】
选项
答案
E
解析
选址对风力发电站的运行很重要。本段围绕着地址的具体要求展开。
转载请注明原文地址:https://kaotiyun.com/show/8UO4777K
0
考研英语一
相关试题推荐
AstudentofEnglish______limitedexercisefindsithardtogetgoodmarkinanEnglishexam.
Businessandgovernmentleadersconsidertheinflationratetobeanimportantindicator.Inflationisaperiodof【C1】______spen
Ipromisetolook______thematterassoonasIgetbacktotheheadoffice.
Hewasn’taskedtotakeonthechairmanshipofthesociety,______insufficientlypopularwithallmembers.
ItisincongruousthatthenumberofBritishinstitutionsofferingMBAcoursesshouldhavegrownby254percentduringaperiod
Digitalphotographyisstillnewenoughthatmostofushaveyettoformanopinionaboutit【1】developapointofview.Butthis
Digitalphotographyisstillnewenoughthatmostofushaveyettoformanopinionaboutit【1】developapointofview.Butthis
TheAmericaneconomicsystemisorganizedaroundabasicallyprivate-enterprise,market-orientedeconomyinwhichconsumerslarg
Sometimeswehavespecificproblemswithourmother;sometimes,lifewithhercanjustbehardwork.Iftherearedifficultiesi
随机试题
A<40次/分B<60次/分C60~100次/分D>100次/分E>160次/分窦性心动过缓的心率范围是
久痿虚极,脾肾精气虚败,病情危笃,常出现
下列输液速度宜快的药物是
在评标期间,开发商与评标小组可以要求投标人回答或澄清某些含糊不清的问题,也可以要求投标者调整报价。()
在改建、扩建和维修工程中,对改建的部分应当重新编写工程档案,并在工程竣工验收后( )内向城建部门移交。
下列选项不属于一体化教育结构模式的特征的是()。
某日凌晨2时许,有人传言,某化工园区一化工企业要发生爆炸,导致邻近化工园区的上万人情绪恐慌,并离家出逃。当地县委县政府高度重视这一事件,在得知情况后第一时间启动应急预案,召集相关镇区和部门进行会办,成立事件应急工作领导小组,落实人员现场调查事件发
设则()
U.S.EarlyChildhoodEducationFiftyyearsago,【T1】______attendedearlyeducationprograms.Today,【T2】______thechildrenof
Fromthepassagewelearnhowadigitalcameraworkswithsomeprinciplesandprocesses.Digitalcamerasusuallystoreimagesi
最新回复
(
0
)