首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
A. Benefiting from an earlier model B. Important operative conditions C. Examining the public confusion D. How it’s all linked u
A. Benefiting from an earlier model B. Important operative conditions C. Examining the public confusion D. How it’s all linked u
admin
2014-02-27
26
问题
A. Benefiting from an earlier model
B. Important operative conditions
C. Examining the public confusion
D. How it’s all linked up
E. Finding a suitable location
F. Comparing wind speeds in Australian cities
G. Matching operational requirements with considerations of appearance
Harvest time in Esperance is constant. As long as the wind blows — which is pretty much all the time — nine identical synchronized wind turbines reap the benefits of the dependable winds that gust up around the southern coastline of Western Australia. These sleek, white, robot-like wind turbines loom up on the horizon forming part of Australia’s first commercial wind farm. They’re not only functional machines that help provide electricity for this secluded coastal town, but increasingly, they’re also draw cards for curious tourists and scientists alike.
Because of its isolation, Esperance is not linked to Western Power’s grid which supplies electricity from gas-, coal- and oil-fired power stations to the widespread population of Western Australia. Before the wind turbines went in, Esperance’s entire electricity needs were met by the diesel power station in town.
【D1】______
The $5.8 million Ten Mile Lagoon project is not Esperance’s first wind farm. The success of a smaller, experimental wind farm, at a spot called Salmon Beach, encouraged the state’s power utility to take Esperance wind seriously. Today, the wind turbines at Ten Mile Lagoon work in conjunction with the diesel power station, significantly reducing the amount of the town’s electricity generated by expensive diesel power.
【D2】______
The wind farm is connected to the power station by a 33-kilovolt powerline, and a radio link between the two, allows operators to monitor and control each wind turbine. The nine 225-kilowatt Vestas wind turbines produce a total generating capacity of two megawatts and provide around 12 percent of the energy requirements of Esperance and its surrounding districts.
【D3】______
The power produced by a wind turbine depends on the size and efficiency of the machine and, of course, on the energy in the wind. The energy in the wind available to the wind turbines is proportional to wind speed cubed. Thus, the greater the wind speed, the greater the output of the turbine. In order to achieve optimum wind speeds, the right location is imperative. "You have to accept the nature of the beast," Mr. Rosser, Western Power’s physicist said. "As surface dwellers our perceptions of wind speeds are bad. As you go higher, wind speed increases significantly."
【D4】______
The most favorable wind sites are on gently sloping hills, away from obstructions like trees and buildings and where the prevailing winds are not blocked. Computer modeling was used to select the best site for Esperance’s wind farm. Scientists were concerned not only with efficiency, but also with protecting the coastal health environment which is rich in plant life and home to tiny pygmy and honey-possums, and a host of bird species. In addition, the wind farm is adjacent to Esperance’s popular scenic tourist drive.
【D5】 ______
Strict erosion controls have been implemented and access to the wind farm is limited to selected viewing areas. The wind turbine towers are painted white and devoid of corporate logos or signage. According to Mr. Rosser there is something of a worldwide backlash against wind farms with regard to their visual impact. "But because wind turbines perform best in the most exposed positions, they will always be visible. There is a very real need to balance environmental and technical requirements. I think the Ten Mile Lagoon Wind Farm sets the standards for environmentally friendly developments."
In fact, the project has become something of a tourist attraction in itself. Esperance shire president Ian Mickel said the wind turbines had been well accepted by locals. "We have watched the wind farm develop with great interest, and now we find visitors to Esperance are equally enthusiastic about it," he said. The aim now is to identify other remote locations where wind turbines will be a feasible means of supplementing existing power stations.
【D4】
选项
答案
E
解析
选址对风力发电站的运行很重要。本段围绕着地址的具体要求展开。
转载请注明原文地址:https://kaotiyun.com/show/8UO4777K
0
考研英语一
相关试题推荐
Businessandgovernmentleadersconsidertheinflationratetobeanimportantindicator.Inflationisaperiodof【C1】______spen
Businessandgovernmentleadersconsidertheinflationratetobeanimportantindicator.Inflationisaperiodof【C1】______spen
Maggieranbacktothekitchen,eggs______carefullyinherhands.
Writealettertoafriendofyoursto1)recommendoneofyourfavoritemoviesand2)givereasonsforyourrecommendation.Yo
Onebasicweaknessinaconservationsystembasedwhollyoneconomicmotivesisthatmostmembersofthelandcommunityhaveno
Onebasicweaknessinaconservationsystembasedwhollyoneconomicmotivesisthatmostmembersofthelandcommunityhaveno
ItisincongruousthatthenumberofBritishinstitutionsofferingMBAcoursesshouldhavegrownby254percentduringaperiod
Whereonestageofchilddevelopmenthasbeenleftout,ornotsufficientlyexperienced,thechildmayhavetogobackandcaptu
随机试题
求点M(2,1,4)到直线L:(x-1)/3=(y+1)/-2=(z-3)/1的距离
当是sin3x的()。
下述哪些不是急性与慢性心包填塞的主要区别
化验血白细胞增加,中性比例增加,首先考虑
A、简单香豆素B、呋喃香豆素C、新木脂素D、联苯型辛烯型木脂素E、简单木脂素厚朴中的成分是()。
B家具厂木材加工车间内可移动式传送带传送物料,可移动式传送带的驱动电机使用380V三芯电缆线供电,其铁制控制箱人口处的电缆线用布条缠绕固定。因控制箱随传送带经常移动,作为操作人员为图方便,只安装了一个螺栓固定,控制箱没有漏电保护装置。木材加工车间
在检查坏账准备科目的相关会计处理及披露情况时,发现s公司存在以下情况。其中正确的是( )。如果被审计单位内部控制健全,注册会计师依赖了内部控制,将重大错报风险评价为低水平,从而实施了相对较少的实质性程序,但由于被审计单位串通舞弊导致有一项影响会计报表
你是如何理解当代儿童发展观的?
一种商品,今年的成本比去年增加了,但仍保持原售价,因此利润下降了,那么,今年这种商品的成本是售价的()。
BossesSay"Yes"toHomeWorkA)Risingcostsofofficespace,timelosttostressfulcommuting,andaslowrecognitionthatwork
最新回复
(
0
)