There is nothing in this world constant but inconstancy.一SWIFT Project after project designs a set of algorithms and then plung
There is nothing in this world constant but inconstancy.一SWIFT Project after project designs a set of algorithms and then plung
admin
2015-05-21
54
问题
There is nothing in this world constant but inconstancy.一SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built.
In most projects,the first system built is (71) usable.It may be too slow,too big,awkward to use,or all three.There is no (72) but to start again,smarting but smarter,andbuild a redesigned version in which these problems are solved.The discard and (73) may be done in one lump,or it may be done piece—by-piece.But all large—system experience shows that it will be done.Where a new system concept or new technology is used,one has to build asystem to throw away,for even the best planning is not SO omniscient(全知的)as to get it fight the first time.
The management question,therefore,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a (74),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does SO only at the (75) of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that the best redesign will find hard to live down.
Hence plan to throw one away;you will,anyhow.
(74)
选项
A、throwaway
B、system
C、software
D、product
答案
A
解析
转载请注明原文地址:https://kaotiyun.com/show/9IPZ777K
本试题收录于:
软件评测师上午基础知识考试题库软考中级分类
0
软件评测师上午基础知识考试
软考中级
相关试题推荐
在网络安全中,“拒绝服务攻击”是指______。
关于机房工程施工中监理工作重点内容的描述,(16)是不正确的。
项目经理利用如下公式进行成本估算,这种估算方法是_____________。总成本=单位面积建造成本×1.25
在信息系统安全管理中,()不属于信息系统应用环境监控的对象。
有关建设单位、承建单位、监理单位三方进度控制的描述,不正确的是()。
为投标某行业大数据智能平台建设项目,某信息系统监理公司总监在投标书中编制了(),重点阐述监理目的,初步规划将采取的监理措施。
监理工程师对工程项目的进度控制从审核承建单位提交的实施进度计划开始直至工程项目(54)为止。
利用数据统计方法控制质量的过程有:①进行统计分析;②判断质量问题;③收集整理质量数据;④拟订改进质量的措施;⑤分析影响质量的因素。其步骤是(42)。
The(75)describes,indetail,theproject’sdeliverablesandtheworkrequiredtocreatethosedeliverables.
The(71)definesthephasesthatconnectthebeginningofaprojecttoitsend.
随机试题
当补焊刚度大的薄壁缺陷时,可采用()方法焊补灰铸铁。
营养室为血液病患者制定的菜谱中,有动物内脏(心、肝、肾)、鸡蛋、麦芽、黄豆、海带、西红柿、菠菜,此菜谱最适合哪种血液病病人食用()
A.局限在心尖部B.向剑突处传导C.向颈部传导D.向心尖部传导E.向左腋下传导主动脉瓣关闭不全
A.补中益气汤B.生化汤合失笑散C.保阴煎D.五味消毒饮合失笑散E.归脾汤晚期产后出血感染邪毒证治疗方剂为
依据《海洋石油安全生产规定》的规定,海洋石油生产设施试生产后,应当经海油安办有关分部应对海洋石油生产设施的状况及安全措施的落实情况进行检查,经验收合格,取得()后,方可正式投入生产使用。
在城市总体规划审批管理工作中,下列审查的重点内容哪一项有误?()
商标权的内容包括()。
导游人员要搞好与领队的关系,应该()
要发送的数据是1101011011,采用CRC校验,生成多项式是10011,那么最终发送的数据应该是()。
注意:基本操作题为4道SQL题,请将每道题的SQL命令粘贴到sqlal.txt文件,每条命令占一行,第1道题的命令是第1行,第2道题的命令是第2行,以此类推;如果某道题没有做,相应行为空。在考生文件夹下完成下列操作:(1)利用SQLSE
最新回复
(
0
)