首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Deconstruction Rather Than Demolition by Daniel Ross Arlington(May 8)- As mentioned in last week’s article, at the end of a buil
Deconstruction Rather Than Demolition by Daniel Ross Arlington(May 8)- As mentioned in last week’s article, at the end of a buil
admin
2015-09-22
57
问题
Deconstruction Rather Than Demolition
by Daniel Ross
Arlington(May 8)- As mentioned in last week’s article, at the end of a building’s life, demolition generates large amounts of materials that can be reused or recycled, principally wood, concrete and other types of masonry, and drywall. Rather than demolish an entire building, consider "deconstructing" all or part of the structure. Deconstruction is the orderly dismantling building components for reusing or recycling.
Last week’s deconstruction of two buildings to make way for a convention center expansion is being cited as an example of how far a community can go to recycle construction materials. The city plans to use recycled construction materials to help build the convention center’s 150,000-square-meter new wing. Half the wing will be taken up by a new library hall, shopping areas and restaurants.
Robin Baily, construction manager for the city of Arlington, said that last week’s controlled deconstruction of the vacant office buildings at 253 and 326 Martin Street collectively produced more than 180 tons of debris, and was transported from the downtown site to regional recycling centers run by Youngearth Recycling, Inc. The remaining non-recyclable materials were safely disposed of in a landfill.
Yoon-sook Huh, president of the Citizen’s Coalition for Waste Reduction, which lobbied the city council to adopt the new policy, said the efficient use of resources is a fundamental tenet of green building construction. This means reducing, reusing, and recycling most if not all materials that remain after a construction or renovation project. Through careful planning, reusing and recycling of construction materials can actually be more economical than disposal.
In the article, the word "debris" in paragraph 3, line 3 is closest in meaning to
选项
A、vehicles
B、trees
C、remains
D、earth
答案
C
解析
如果不知道单词的意思应仔细观察前后文后再做选择。debris是工程结束后的残骸物,remains是名词残骸的意思。
转载请注明原文地址:https://kaotiyun.com/show/AI4d777K
本试题收录于:
托业阅读题库托业(TOEIC)分类
0
托业阅读
托业(TOEIC)
相关试题推荐
Internationaltradealwayscreatestheneedforforwardoperations,iftheexchangeriskistobehedged.Letusconsidertheca
ApplyingforamortgageSusanThomasandherhusbandAlanhavedecidedtobuyahouse.Theyhaveseenonethattheylikeand
Acreditcardisaplasticcard(oritsequivalent)tobeuseduponpresentationbythecardholdertoobtainmoney,goods,orse
Robert、Simon和Andrew想开展一种生意。他们决定不以股份有限公司的形式经营。经过讨论,他们决定以“永荣有限公司’作为企业的名字。分别对以下情况给出建议:如果他们能采用这—名称及其采用的后果(如果有的话);如果这一名称被采用。(1995
increase,engage,capital,protect,failures,fail,interests,efficiently,expensive,align,protect,insurance,
increase,engage,capital,protect,failures,fail,interests,efficiently,expensive,align,protect,insurance,
Assumetheinflationrateisexpectedtobe5percentandtheunemploymentrateis8percent.Ifworkerswishtogeta2percent
A、Theaimofsuchcontrolistoraisethedemandforforeignexchange.B、Theaimofsuchcontrolistodecreasethesupplyoffo
A、Theforeignbanksshouldhavesetuparepresentativeoffice.B、Theforeignbankscan’tapplyforabranch.C、Theforeignbank
iTuneMusicStoreTel:703-536-1094Fax:703-536-1090October3Ms.NaomiLewis1325WilsonBoulevard,Arlington,Virginia2
随机试题
GF--2000--0208《水利水电工程施工合同和招标文件示范文本》规定,工程预付款的总金额应不低于合同价格的______,分两次支付给承包人,第一次预付款的金额不应低于工程预付款总额的______。下列选项正确的是()。
根据合同法相关规定,承包人行使优先受偿权的期限应当自建设工程()起计算。
贷款诈骗罪与票据诈骗罪相比,最重要的区别在于主体()。
在社交场合,无论男士女士,进入室内均不宜戴()。
有“天下第一陵”之称的是()。
以下哪一项是体育教学设计的重点和核心?()
古代学校教育的特征主要表现为()。
已知A~B=,则r(A)+r(A—E)+r(A一2E)=__________.
设f(x)在[0,+∞)上连续,且满足求f(t).
Inhisresearchpaper,Dr.Frosh,medicaldirectorofthePayneWhitneyClinic,distinguishesmoodswings,whichmaybeviolent
最新回复
(
0
)