首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
43
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M11】
选项
答案
CORRECT
解析
转载请注明原文地址:https://kaotiyun.com/show/AeoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
WhatdoesKatherinedislikeaboutthecourse?Shebelievesthatmanagementislikelyto
•Inthispartyoulistentwicetoalongconversation,interviewormonologue,andanswereightquestions.•Beforeyoulisten,
OutsourcingreferstoCompanieswhouseoutsourcingusually
ThephoneswillbehandledbyNextweek’smeetingofprojectmanagerswillbeon
•Lookatthenotebelow.•Youwillhearamancallingaboutmeetingwithsomebody.FRENCHBUSINESSTRIP:Wed2/10-10-Fri4/10Ap
•Youwillhearadiscussion.•Foreachquestion23-30markoneletter(A,BorC)forthecorrectanswer.•Afteryouhaveli
•Lookatthenotesbelow.•Youwillhearatelephoneconversationaboutarrangingameeting.Needtodiscuss(9)______
What’stheespeciallybigissuethatholdsbacktheInternet?WhatisthespecialfeatureofEffnet’sfirewallsystem?
YouwillheararadiointerviewwithDr.EdwardGordon,theHumanResourcesmanagerfromOrchardSupplyHardware.Foreachq
随机试题
埋弧焊机控制系统测试的主要内容有()。
链表不具有的特点是【】
霍奇金病最重要的具有诊断意义的病变是
A、 B、 C、 D、 E、 C
A、木通科B、豆科C、毛茛科D、马兜铃科E、茜草科关木通来源于
某建设项目的污水排入小湖,预测持久性污染物的影响浓度时,《环境影响评价技术导则一地面水环境》推荐采用的数学模式是()。
铁路运行机车上必须安装机车信号、列车无线调度电话和(),简称“三项设备”。
某施工机械的台班产量为500m3,与之配合的工作小组有4人,则单位产品人工时间定额为()。
下列属于商业银行面临的战略风险的有()。
“两弹一星”,使中华民族的凝聚力空前进发。在第一颗原子弹试验的攻关会战中,先后有26个部、委,20个省、市、自治区,包括900多家工厂、科研机构、大专院校参加,为原子弹的制造和试验研制出10万多种专用仪器、设备和原材料。以上材料不能说明()。
最新回复
(
0
)