首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
专升本
How can we get rid of garbage (垃圾) ? Do we have enough energy sources to meet our future energy needs? These are two importa
How can we get rid of garbage (垃圾) ? Do we have enough energy sources to meet our future energy needs? These are two importa
admin
2011-01-24
69
问题
How can we get rid of garbage (垃圾) ? Do we have enough energy sources to meet our future energy needs?
These are two important questions that many people are asking today. Some people think that man might be able to solve both problems at the same time. They suggest using garbage as an energy source, and at the same time it can save the land to hold garbage.
For a long time, people buried garbage or dumped (倾倒) it on empty land. Now, empty land is scarce. But more and more garbage is produced each year. However, garbage can be a good fuel to use. The things in garbage do not look like coal, petroleum, or natural gas, but they are chemically similar to these fossil(化石) fuels. As we use up our fossil-fuel supplies, we might be able to use garbage as an energy source.
Burning garbage is not a new idea. Some cities in Europe and the United States have been burning garbage for years. The heat that is produced by burning garbage is used to boil water. The steam that is produced is used to make electricity or to heat nearby buildings. In Paris, France, some power plants burn almost 2 million metric tons of the cities garbage each year. The amount of energy produced is about the same as would be produced by burning almost a half million barrels of oil.
Our fossil fuel supplies are limited. Burning garbage might be one kind of energy source that we can use to help meet our energy needs. This method could also reduce the amount of garbage piling up on the earth.
Which of the following is NOT the result of burning garbage?
选项
A、The garbage burned is turned into fossil fuels.
B、The heat produced is used to boil water.
C、The steam produced is used to make electricity.
D、The steam produced is used to heat buildings.
答案
A
解析
事实细节题。根据文章第四段中“The heat that is produced by burning garbage is used to boil water.The steam that is produced is used to make electricity or to heat nearby buildings.”可知,只有A项不正确。
转载请注明原文地址:https://kaotiyun.com/show/CFGC777K
本试题收录于:
英语题库普高专升本分类
0
英语
普高专升本
相关试题推荐
Becauseofher______(refuse)toprovidetheinformation,Ihadtoabandontheproject.
Thesestudiesgive______(leading)resultsbecausetheyhaven’tlookedatenoughcases.
Whensheheardthebadnews,shecompletely______.
Nobody______anymoretosay,themeetingwasclosed.
Conveniencefoodswhicharealreadypreparedforcookingare______instores.
"Igetbywithalittlehelpfrommyfriends"isapopularlyric(抒情诗)withage-oldwisdombehindit.【B1】______peopleneedpeop
DoyoumindifI______withmyworkwhileyouaregettingteaready?
Ididn’tknowwhattodo,butthenanidea______tomesuddenly.
CharlesDickens______manywonderfulcharactersinhisnovels.
IwishI______longerthismorning,butIhadtogetupandcometoclass.
随机试题
关于人体的构造,下列说法错误的是:
亚急性甲状腺炎较特征性的病理学改变是甲状腺
结核病最主要的传染源是
患者,男,30岁,鼻唇沟处有一感染化脓灶,以下护理措施中错误的是
CT用于放射治疗计划的作用是
搜集估价所需的有关资料,主要取决于拟采用的()。
中华人民共和国人力资源和社会保障部是唯一具有颁发国家职业证书职能的权威机构,它体现了项目管理师具有________的特点。
声波的特性包括()。
在自然科学领域,我们______________经常去对付那个无法解决的难题。______________对于以何种方式引起我们注意的何种事物进行研究,______________发现其中大多数同我们过去的想法不一致时,我们必须敏锐而诚实。________
在某个检查点,监理工程师对项目进行检查后发现:项目的BCWS(计划工作预算费用)=20000万元,BCWP(完成工作预算费用)=17000万元,ACWP(完成工作实际费用)=18000万元,那么该项目的SV(进度偏差)、CV(成本偏差)是多少?进度业绩
最新回复
(
0
)