首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A、To drive the train after it is started automatically. B、To start the train and to drive it when necessary. C、To take care of t
A、To drive the train after it is started automatically. B、To start the train and to drive it when necessary. C、To take care of t
admin
2012-11-30
47
问题
(32)The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. (33)Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. (34)If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots." The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. (35)Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
32. What happened to the London underground railway over four decades ago?
33. Who checks and collects the tickets on the Victoria Line?
34. What is the task of the one worker on the Victoria Line train?
35. What will happen on the line if each train moves at its own speed?
选项
A、To drive the train after it is started automatically.
B、To start the train and to drive it when necessary.
C、To take care of the passengers on the train.
D、To send commanding signals to the command spot.
答案
B
解析
细节推断题。短文中间部分提到,在“维多利亚线”上,每列火车上只有一位工作人员,通常只负责让火车启动,虽然他可以操纵火车,但一般情况下,火车都是自动运行的。由此可知,在“维多利亚线”上,唯一的工作人员的职责是让火车启动并在需要时进行驾驶。
转载请注明原文地址:https://kaotiyun.com/show/Cgb7777K
0
大学英语六级
相关试题推荐
Weneedmorepeopleto_________theirbloodbecausetherearesomanyinjuredmenandwomeninthedisaster.
Thewealthofacountryshouldbemeasured______thehealthandhappinessofitspeopleaswellasthematerialgoodsitcanpro
Youshouldprobably______thepointwhetheritisworthyofyoureffortsbeforeyoumakethefinaldecision.
Thedirector__________Tomashisofficialrepresentativeattheconference.
Beforehestartedwork,Iaskedthebuildertogivemean________ofthecostofrepairingtheroof.
Hislongandloyalservicewiththecompanywas________withapresentfromthepresident.
Someoneorsomethingthatis______looksstrongandisunlikelytobeeasilydamagedorinjured.
Techniquessuchasobject-orienteddesignandstructuredprogrammingwillhavetobefollowedto______toengineeringpractice.
StudentswhoenteredlotteriesandwonspotsinNewYorkCitycharterschoolsperformedbetteronstateexamsthanstudentswho
A、ManyarchitectsstudiedwithWright.B、WrightstartedthepracticeofEnvelopeBuilding.C、WrightusedelementsofEnvelopeBu
随机试题
对于对流干燥器,干燥介质的出口温度应()。
多囊肾的影像学表现为
在小儿下呼吸道解剖组织特点中,以下哪项是错误的
根据合同实施偏差分析处理的结果,承包商应该采取相应的调整措施,包括()。
保险原则是指通过充分分散化来化解特定风险的原理。()
地处县城的某房地产开发公司,2014年3月对一处已竣工的房地产开发项目进行验收,可售建筑面积共计25000平方米。该项目的开发和销售情况如下:(1)该公司取得土地使用权应支付的土地出让金为8000万元,政府减征了10%,该公司按规定缴纳了契税。
根据《消费者权益保护法》规定,出现以下哪些情形,经营者应承担刑事责任()。
某导游员在导游活动中,向旅游者索要小费,根据《导游人员管理条例》,由旅游行政管理部门对()进行处罚。
汉代的董仲舒作为提出“罢黜百家、独尊儒术”主张的第一人,融合了先秦以来各家的思想,形成了新儒学,其思想基础源于对一部儒家经典的新阐释,该经典是()。
阅读以下文字,完成下面问题中国传统审美文化是与它的社会形态相一致的。中国自古以来就是农业国度,就决定了它的文化精神重视天人合一与人人相合,礼乐便是这个系统的体现。礼不仅包含宗教仪式,而且包括各种典章制度;乐则是调和礼制内人与人之间的思想感情。美善
最新回复
(
0
)