Ryder Wholesale Medical Supplies Ltd. To: Mr. Frank Connoirs, Security Manager From: Mr. Victors, Security Supervisor Date: Marc

admin2014-01-06  19

问题                     Ryder Wholesale Medical Supplies Ltd.
To: Mr. Frank Connoirs, Security Manager
From: Mr. Victors, Security Supervisor
Date: March 15th, 2009
Subject: Incident Report—Damage to Medical Equipment
Occurrence:
Date: March 14, 2009
Time: 10 : 30 p.m.
Location: Warehouse, Ubi Road
Description: While on patrol at the equipment warehouse, I noticed that the newly arrived equipment was very wet and had been severely damaged by water leaking through the ceiling.
Immediate actions taken:
a) The affected equipment was immediately removed from the damp area and dried by using blankets.
b) I made temporary repairs to stop the water entering the ceiling.
c) The matter was reported verbally to the Warehouse Manager at 7 : 00 a. m. today.
Findings:
A small team consisting of Mr. Smith (Maintenance), Mr. Robin (Warehouse Manager), and myself (Security), investigated the damages to the warehouse roof.
It was discovered that several parts of the roof were very weak indeed and in urgent need of repair. It was also found that the weakest part of the roof appeared to be over the equipment storage area.
Conclusions:
It appeared from our observations that recent heavy rain had weakened several parts of the roof, and that this was the cause of the water entering the warehouse.
Maintenance Department has agreed to make temporary repairs to the roof to stop water from entering the warehouse and provide temporary measures to protect equipment in the warehouse.
Recommendations:
It is strongly recommended that permanent repairs be carried out on the roof so as to solve the problem of water damage to equipment.
Victors Grow
Security Supervisor
Which step was NOT included in the immediate actions in the article?

选项 A、Shifted the wet medical equipment to dry place
B、Informed the warehouse Manager of the incident at once
C、Dried the wet equipment with blankets
D、Did some casual mending to the roof

答案D

解析 报告第二部分Immediate actions taken中(a)-(c)三项表明(A)、(B)、(C)三项均正确,只有(D)项没有出现,可知正确项是(D)。
转载请注明原文地址:https://kaotiyun.com/show/FDad777K
0

最新回复(0)