首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
24
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
Mr. Black may be the ______ of the company.
选项
A、boss
B、manager
C、maintenance person
D、service person
答案
A
解析
转载请注明原文地址:https://kaotiyun.com/show/IWKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Forabouthowlonghasthecompanybeeninbusiness?
Whendidthemanstartworkingatthiscompany?
WhatwilltheStonebarkCompanydoonMarch1?
Accordingtotheman,whatchangewillbemadetothecompany?
随机试题
试述前列腺素在黄体溶解中的作用。
低温环境下不宜用的电缆是()。
当机动车转向失控行驶方向偏离,事故已经无可避免时,要采取什么措施?。
工期临床试验的目的是
接诊哮喘患者,在诊断不明的情况下,首先禁用()
普鲁卡因不可用于哪一种局麻
临床判断休克的主要指征不包括
企业在编制年度财务会计报告之前,必须进行财产清查。( )
一套完整的课程方案由______、课程内容、课程组织和______组成。
不管受到多大的压力和打击,绝大多数人的精神状况都能在一段时间后恢复正常,这种恢复能力从何而来.科学家揭开了其中的奥秘,人脑中有一个精妙的平衡机制,当我们的情绪太过激动时,这种机制就会触发神经化学反应.使情绪回落到平衡点上。这段文字告诉我们()。
最新回复
(
0
)