首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
计算机
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
admin
2020-08-10
42
问题
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to (72).
Project management is the process of scoping, planning, staffing,organizing, directing, and controlling the development of a(n) (73) system at a minimum cost within a specified time frame.
For any systems development project, effective project management is necessary to ensure that the project meets the (74) , is developed within an acceptable budget, and fulfills customer expectations and specifications. Project management is a process that starts at the beginning of a project, extends through a project, and doesn’t culminate until the project is completed.
The prerequisite for good project management is a well-defined system development process. Process management is an ongoing activity that documents, manages the use of, and improves an organization’s chosen methodology (the “process”)for system development. Process management is concerned with the activities, deliverables, and quality standards to be applied to (75) project(s).
(74)
选项
A、deadline
B、specification
C、expectation
D、requirement
答案
A
解析
转载请注明原文地址:https://kaotiyun.com/show/LUCZ777K
本试题收录于:
软件设计师上午基础知识考试题库软考中级分类
0
软件设计师上午基础知识考试
软考中级
相关试题推荐
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
Networks can be interconnected by different devices. In the physical layer, networks can be connected by(66)or hubs, which just
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
随机试题
女,8岁,发热、腹泻、腹痛、黏液血便2个月,多种抗生素治疗未见明确疗效,多次便培养(-),X线胸片及PPD(-),血肥达试验(-)。以下哪项诊断可能性最大
为确保消防给水安生,以下哪条对水源的要求是错误的?(2009,65)
施工项目管理规划大纲分为施工项目管理()和施工项目管理实施规划。
按规定,一般每个受伤人员休息在1个工作日以上,( )个工作日以下。
某税务师事务所属于增值税一般纳税人,2017年4月提涉税咨询服务,取得含税收入800000元;销售自己使用过的2008年购人的小汽车1辆,取得含税收入52000元。根据增值税法律制度的规定,该事务所上述业务应缴纳增值税()元。
中国证监会根据国务院的授权,依法对()实施监督管理。
下列说法错误的是:()。
美国进口公司购买了德国一公司价值10万马克的机器。美元相对于马克的价值一直在下跌。德国公司提供“2/10,n/90”的信用销售条件。马克的即期汇率为0.55美元,远期汇率为0.56美元,求:10天折价期内支付的美元成本;
设有购买表(顾客号,商品号,购买时间)。现要查询顾客A与顾客B购买的相同商品。有下列查询语句:Ⅰ.SELECT商品号FROM购买表WHERE顾客号=’A’AND商品号IN(SELECT商品号FROM购买表WH
WashingtonD.C.,capitaloftheUnitedStates.isnamedafter
最新回复
(
0
)