首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
38
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M2】
选项
答案
CORRECT
解析
转载请注明原文地址:https://kaotiyun.com/show/MeoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
WhatdoPOPprojectsaimtodo?WhathasmadeTVadvertisinglesseffective?
•Lookatthenotebelow.•Youwillhearawomancallingacompanyaboutapossibleorder.TELEPH
•Lookatthenotesbelow.•Youwillhearatelephoneconversationaboutthearrangementsforameeting.
Thespeaker,MsTurnerisfromAccordingtoMsTurner,somecompaniesholdsomeactivitiesinorderto
OutsourcingreferstoAccountancyissuitableforoutsourcingbecauseaccountants
•Youwillhearfivespeakerstalkingaboutbusinesstrips.•Foreachrecording,choosethereasonthespeakergivesforthetr
•Youwillhearfivespeakerstalkingaboutbusinesstrips.•Foreachrecording,choosethereasonthespeakergivesforthetr
•Youwillhearfivepeoplesellingproducts.•Foreachrecording,decidewhatthespeakerisselling.•Writeoneletter(A-H)
YouwillheararadiointerviewwithDr.EdwardGordon,theHumanResourcesmanagerfromOrchardSupplyHardware.Foreachq
—Readthetextbelowaboutjobadvertisement.—Inmostofthelines41-52thereisoneextraword.Itiseithergrammaticallyin
随机试题
A.头低卧位B.头高足低斜坡卧位C.高半坐卧位D.低半坐卧位E.俯卧位蛛网膜下隙麻醉病人采取
疟疾症见寒多热少,休作时有,其治法
下列哪一项是血虚补肾的理论依据
A、已达到粉碎要求的粉末能及时排出B、已达到粉碎要求的粉末不能及时排出C、物料在低温时脆性增加D、粉碎的物料通过筛子或分级设备使粗颗粒重新返回到粉碎机E、两种以上的物料同时粉碎低温粉碎是指()。
房地产包销活动中,房地产经纪机构()。
初步设计概算中,铺底流动资金按流动资金需要量的30%计列,流动资金可采用()方法计算。Ⅰ.扩大指标估算;Ⅱ.生产能力指数估算;Ⅲ.比例估算;Ⅳ.分项详细计算
【背景资料】某水利枢纽工程由电站、溢洪道和土坝组成。土坝的结构形式为均质土坝,上游设干砌石护坡,下游设草皮护坡和堆石排水体,坝顶设碎石路,工程实施过程中发生下述事件:事件一:项目法人要求该工程质量监督机构对大坝填筑按《水利水电基本建设工
LES有多个版本,在教材中所选用的是由()等编制的生活事件量表。
阅读材料,完成以下题。小红,女,10岁,父母都忙于工作,从小都是爷爷奶奶带,祖辈对其比较宠爱,但是本身的教育潜质不高。再加上孩子父母经商的缘故,平时对孩子要么放任不管,要么只会责骂,一听说成绩不理想,就是一顿打骂。该学生学习习惯差,经常不完成作业
以下是某C程序段及其功能描述,请仔细阅读程序并完成要求企业发放的奖金根据利润提成,发放规则如下:利润(Ⅰ)低于或等于10万元时,奖金可提10%;利润高于10万元,低于20万元时,低于10万元的部分按10%提成,高于10万元的部分,可提成7.
最新回复
(
0
)