首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
26
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M2】
选项
答案
CORRECT
解析
转载请注明原文地址:https://kaotiyun.com/show/MeoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
•Therearethirtyquestionsonthisquestionpaper.•Instructionsaregivenonthetape.•YoucanwriteonthisQuestionPape
WhatdoPOPprojectsaimtodo?WhathasmadeTVadvertisinglesseffective?
•Youwillhearfiveshortrecordings.Eachspeakerissayingwhatamanagermustdotoachievesuccess.•Foreachrecording,d
•Youwillhearanotherfiverecordings.•Youwillhearfivespeakerstalkingaboutrunningprojectteams.•Foreachrecording
HowtoapproachListeningTestPartTwo•Thispartisintwosections,Ineachsectionyoulistentofiveshortmonologues,spo
HowtoapproachListeningTestPartOne•Thispartisinthreesections.Ineachsectionyoulistentoatelephoneconversation
•Youwillhearfivepeoplesellingproducts.•Foreachrecording,decidewhatthespeakerisselling.•Writeoneletter(A-H)
SamWalton’sstorerunningconceptdoesnotinclude
Whichofthefollowingstatementsistrue?
•James,oneofyouremployeeshasbeeninsewicefortenyears.AstheHR(HumanResources)Managerofyourcompany,youwishto
随机试题
为什么要用手柄置零的方式启动吊车?
建筑施工企业的管理人员违章指挥、强令职工冒险作业,因而发生重大伤亡事故或者造成其他严重后果的,依法追究( )责任。
某工程单代号网络图如下,说法正确的是( )。
背景资料某高速公路N合同段段路基工程施工,工期18个月,其中K23+200-K32+200路段以填方为主,合同段附近地表土主要是高液限黏土(液限值在38-49之间),在较远地带分布有膨胀土、沼泽土、盐渍土、有机土、粉土、砂性土等。出于控制造价的考虑,业主
采用信用证交付方式,单证的交付是指出口商在规定的时间内将全套单据连同正本信用证通过出口地银行寄给开证行,以便开证行付款。()
作为国家主人和领导力量的工人阶级是指工人队伍中的()。
甲为患者,在医院输血过程中,因血浆含有病毒,导致甲感染艾滋病毒,为此引起纠纷。下列表述正确的是()。
中华人民共和国国务院可依法制定()。
假如程序员可用的存储空间为4MB,则程序员所用的地址为(4),而真正访问内存的地址称为(5)。
Peoplegothereformeals.Peoplestudythingsthere.
最新回复
(
0
)