A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
admin
2020-08-10
57
问题
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to (72).
Project management is the process of scoping, planning, staffing,organizing, directing, and controlling the development of a(n) (73) system at a minimum cost within a specified time frame.
For any systems development project, effective project management is necessary to ensure that the project meets the (74) , is developed within an acceptable budget, and fulfills customer expectations and specifications. Project management is a process that starts at the beginning of a project, extends through a project, and doesn’t culminate until the project is completed.
The prerequisite for good project management is a well-defined system development process. Process management is an ongoing activity that documents, manages the use of, and improves an organization’s chosen methodology (the “process”)for system development. Process management is concerned with the activities, deliverables, and quality standards to be applied to (75) project(s).
(75)
选项
A、a single
B、a particular
C、some
D、all
答案
D
解析
转载请注明原文地址:https://kaotiyun.com/show/QUCZ777K
本试题收录于:
软件设计师上午基础知识考试题库软考中级分类
0
软件设计师上午基础知识考试
软考中级
相关试题推荐
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
随机试题
简述人力资源的特征。
在18-8铬镍不锈钢中具有抗腐蚀性的是
下列哪项不符合二期愈合的特点
从会计意义看,资本是指企业所有者(或投资人)投资转入的资本金(即开展生产经营活动的本钱)。()
()可能隐含着买卖双方应该如何报价的规则。
某品牌专卖店门口立有一块木板,上书“假一罚十”四个醒目大字。李某从该店购买了一件品牌商品。后经有关部门鉴定,该品牌商品属于假冒产品。李某遂要求该品牌专卖店履行其“假一罚十”的承诺。关于本案,下列选项正确的是()。
(2017江苏.B类)根据所给材料,回答36~40题。从大蒜、生姜,到香蕉、菠萝,在农产品价格暴跌中,农民很受伤。订单农业作为以销定产的重要手段,对稳定农产品价格、确保农民合理收益、抵御市场价格风险具有一定的作用。然而,经调查发现,订单农业在实
以下程序的输出结果是()。#includemain(){inta=1,b=3;if((++a
王朋是一名新闻工作者,十分关注第十二届全国人民代表大会,特别是第三次会议政府工作报告的内容。为了更好地宣传大会精神,他准备制作一个演示文稿。请根据考生文件夹下的“PPT素材文件.docx”及相关图片文件,帮他完成演示文稿的制作工作,具体要求如下:第1张
Nexttimeyougazeoutside【C1】______acoldwinterdayandthinkhowdeadeverythingappears,takeacloserlook.Naturem
最新回复
(
0
)