首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
计算机
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
admin
2020-08-10
22
问题
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to (72).
Project management is the process of scoping, planning, staffing,organizing, directing, and controlling the development of a(n) (73) system at a minimum cost within a specified time frame.
For any systems development project, effective project management is necessary to ensure that the project meets the (74) , is developed within an acceptable budget, and fulfills customer expectations and specifications. Project management is a process that starts at the beginning of a project, extends through a project, and doesn’t culminate until the project is completed.
The prerequisite for good project management is a well-defined system development process. Process management is an ongoing activity that documents, manages the use of, and improves an organization’s chosen methodology (the “process”)for system development. Process management is concerned with the activities, deliverables, and quality standards to be applied to (75) project(s).
(75)
选项
A、a single
B、a particular
C、some
D、all
答案
D
解析
转载请注明原文地址:https://kaotiyun.com/show/QUCZ777K
本试题收录于:
软件设计师上午基础知识考试题库软考中级分类
0
软件设计师上午基础知识考试
软考中级
相关试题推荐
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
Networks can be interconnected by different devices. In the physical layer, networks can be connected by(66)or hubs, which just
Networks can be interconnected by different devices. In the physical layer, networks can be connected by(66)or hubs, which just
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
随机试题
保证胸部摄影质量,下列最佳匹配是
急性根尖周炎黏膜下脓肿期宜去龋尽及牙本质深层宜
根据环境影响评价工程师职业资格登记管理有关规定,下列说法中,正确的是()。
招标文件要求中标人提交履约担保的,招标人()。
计划性风险自留的计划性主要体现在( )。
下列各项中属于企业结构构型元素的有()。
2015年中国电子商务市场交易规模16.4万亿元,增长22.7%。其中网络购物增长36.2%,在线旅游增长39.9%,本地生活服务O2O增长38.3%。2015年中国移动网购市场交易规模达2.1万亿元,同比增长123.8%。能够从上述材料中推出的是:
按照个体活动的独立性程度,可把人的性格分为()
毛泽东指出,人民军队的唯一宗旨是()。
属于事实行为的有()。
最新回复
(
0
)