首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
admin
2019-06-25
101
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1, 172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
According to the passage, the workers can______in case of pipeline leaks.
选项
A、report it to the local government
B、ask people to leave the leak affected areas
C、call 911
D、close valves
答案
D
解析
细节题。定位到文章第三段第二句“Workers will also monitor it remotely,and will be able to close valves within three minutes if leaks are detected.”可知,工人们可以进行远程监控,如果发现有泄漏,他们可以在3分钟之内关上阀门。A、B、C三项均未在文中提及。故选D。
转载请注明原文地址:https://kaotiyun.com/show/Rq3O777K
0
成人本科学位英语
相关试题推荐
Teacher:Tom,you’rebangingthetable.Itlookslikeyou’reangry.Boy:【D8】______ButIcan’tfindtheredblock(积木).Teacher:
Doyouknowinsurance(保险)?Buyinginsuranceisameansbywhichpeoplecanprotectthemselves【C1】______largelosses.Protection
ItwasabeautifulsummerdayandIwastakingawalkinthedowntownareaofMadrid.WhenIturnedastreet【C1】______Iheardth
Student:ImeanIwanttodosomeoftheseproblems.Teacher:Yeah.Student:Butit’stakingtimetodothem.Teacher:Whenwecov
Whetherwayswillbefoundtopreventpollutionornotisjust______worriesthepublic.
ThepeopleatthepartywereworriedaboutJanetbecausenoonewasaware()shehadgone.
Thechildrenlookedupastheplanespassed().
Hersuggestionthateverybody()wasnotappreciated.
Somedevelopedcountriesaretryingto______theseriousproblemsresultingfromtheenergycrisis.
Seldom______anymistakesduringhislastten-yearserviceinthiscompany.
随机试题
硬下疳(chancer)
A.对硫磷B.氯硫磷C.氧乐果D.敌敌畏E.敌百虫有机磷杀虫药中属于中毒类的是
触摸屏通过________方式与可编程序控制器交流信息。
张力性气胸致死的主要原因是()。
某郊区学校为方便乘坐地铁,与相邻研究院约定,学校人员有权借研究院道路通行,每年支付1万元。据此,学校享有下列哪一项权利?()
水利水电工程编制施工总进度应遵循的原则是()。
金属风管的材料品种、规格、性能与厚度等应符合设计和现行国家产品标准的规定,下列金属风管的制作和连接中不符合要求的是()。
从问题的提出、方案的设计到实施以及结论的得出,完全由学生自己来做,重研究过程甚于注重结论,这种课程是__________课程。
人民行使国家权力的机关是全国人民代表大会。()
A.大家B.张C.除了D.几E.变化F.客气A:葡萄()块钱一斤?B:3块,多买可以便宜一点儿。
最新回复
(
0
)