首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Our government recently has focused on the importance of investment in clean energy and energy efficiency as the best way to sus
Our government recently has focused on the importance of investment in clean energy and energy efficiency as the best way to sus
admin
2013-09-16
60
问题
Our government recently has focused on the importance of investment in clean energy and energy efficiency as the best way to sustainably grow America’s dying economy, and President Obama has called for the creation of a high-speed rail system as a way to generate green jobs, enhance economic productivity and reduce carbon emissions. The White House has announced the awarding of $ 8 billion in stimulus funding to kick-start high-speed-rail projects and improve service in 13 corridors across the country.
That’s a nice move, but America’s antiquated(旧式的,过时的)rail system will have to advance a long way just to make it to the present, let alone the future. U. S. intercity railroads are a laughingstock compared with those in most other developed nations.
Today you can travel the 250 miles from Paris to Lyon on the high-speed TGV in two hours. Covering a similar distance from Philadelphia to Boston takes some five hours, and that’s on an Amtrak Acela train, the closest thing the U. S. has to high-speed rail. "Every other major industrialized nation has recognized that high-speed rail is key to economic growth and mobility, " says Petra Todorovich, director of the America 2050 program at the Regional Planning Association. "It’s time for America to realize that as well. "
But whatever the public’s vision of a sparkling new 150-m. p. h. bullet train like those in Japan and Europe, the reality is that not all, or even most, of the stimulus money will go toward creating entirely new rail service. Instead, much of the initial funding will be spent improving and speeding up existing service.
Still, the initial round of $ 8 billion is just a tiny percentage of what it would cost to significantly overhaul(彻底革新)the country’s rail system. And there are concerns that by spreading the funds to so many different projects in so many different states, it won’t be possible to make a real difference in any one place. It doesn’t help that the one region that could most obviously benefit from truly high-speed rail—the Boston-to-Washington corridor—received a mere $112 million in funding, in part because building new track in the congested area would be prohibitively expensive and politically challenging.
Nevertheless, high-speed rail is an idea whose time has come—at least for environmentalists. According to Environment America, high-speed rail uses a third less energy per mile than auto or air travel, and a nationwide system could reduce oil use by 125 million bbl. a year. In addition, high-speed rail represents the kind of long-term infrastructure investment that will pay back for decades. "This is a down payment on a truly national program, " said Petra, "It will change the way we travel and change the way we work and live. "
Why doesn’t it help for Boston-to-Washington corridor to receive a mere $ 112 million in funding?
选项
A、This region is less likely to benefit from the new rail.
B、This region is well-developed and don’t need money.
C、There is no room for new tracks in this developed area.
D、There would be economical and political oppositions.
答案
D
解析
根据题干关键词Boston-to-Washington corridor定位到原文第五段第三句:It doesn’t help that the oneregion that could most obviously benefit from truly high-speed rail—the Boston-to-Washington corridor--receiveda mere $112 million in funding,in part because building new track in the congested area would be prohibitivelyexpensive and politically challenging.可知,最能从高速铁路中得到明显受益的波士顿到华盛顿大通道地区只收到1.12亿的资金支持,其中部分原因是由于在人口密集的地区铺设新的铁路会极其昂贵,而且还会遇到政治方面的阻力,故选D)项。D)项中的be economical and political oppositions是原文be prohibitively expensive andpolitically challenging的同义转述。
转载请注明原文地址:https://kaotiyun.com/show/Ye97777K
0
大学英语六级
相关试题推荐
Bysayingthat"humanshaveneverhaditsogood"(Linel,Para.2),theauthormeansthatpeoplenowadays______.TheUSrefused
Bysayingthat"humanshaveneverhaditsogood"(Linel,Para.2),theauthormeansthatpeoplenowadays______.Concernedwith
A、Hemajorsinengineering.B、Hewasn’tatthelectureatthattime.C、Hehasonlyrecentlybecomeinterestedinphilosophy.D、H
Asheartdiseasecontinuestobenumber-onekillerintheUnitedStates,researchershavebecomeincreasinglyinterestedin【B1】_
Racket,dinclamor,noise.Whateveryouwanttocallit,unwantedsoundisAmerica’smostwidespreadnuisance.Butnoiseismore
A、Johnusedtodoquitewellinhisstudies.B、Johnisalwaysgoodatstudies.C、Johndidn’tlikestudiesbefore.D、Johnstudies
TheEnvironmentalProtectionAgencyunveiledadetailedproposalWednesdayforusingthegovernment’sregulatorypowerstocurb
TheUnitedStatescourtsystem,aspartofthefederalsystemofgovernment,is【C1】______bydualhierarchies;therearebothst
TheUnitedStatescourtsystem,aspartofthefederalsystemofgovernment,is【C1】______bydualhierarchies;therearebothst
A、Themanshouldstartrunningdaily.B、Shealsopreferstoexerciseintheafternoon.C、It’simportanttowarmupbeforeexerci
随机试题
尿道炎时尿痛的特点
( )对所承包的建设工程承担施工任务的执行和组织的总的责任。
特定减免税进口货物的报批一般包括特定减免税资格海关备案和减免税海关审批两项内容。
银行金融创新的基本原则不包括()。
当物流系统处于盈亏平衡时,利润等于0,此时边际贡献()固定总成本。
Joyinlivingcomesfromhavingfineemotions,trustingthem,givingthemthe【E1】f______ofabirdintheopen.Joyinlivingcan
科学发展观,第一要义是发展,核心是以人为本,基本要求是全面协调可持续,根本方法是()。
1936年5月,中共中央放弃“抗日反蒋”口号,第一次公开把蒋介石作为联合的对象,标志这一变化的文件是
下列逻辑运算结果正确的是( )。
IfirstmetAntigonewhenIwasnine.Shejusthungthereonthewall.Hertaskwastoburyherdeadbrother:minewastodusth
最新回复
(
0
)