首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely s
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely s
admin
2015-01-31
26
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs.
According to the passage, all of the following are sources of radioactive waste EXCEPT______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
细节题。作者在第三段提到核废料的来源有:Power plants and bomb-making are not the only sources of waste.Uranium mining and milling operations…显然没有提到B选项的内容,故选B。
转载请注明原文地址:https://kaotiyun.com/show/Z8q7777K
0
大学英语四级
相关试题推荐
A、Heleadsanabnormallifebecauseofhisdisability.B、Hehasbeenmisinterpretedbymanypeople.C、Hislifeismisledbydoct
Byimposingstrictrulesaboutalcohol,parentscanreducetheirkids’impulsestodrink,accordingtoanewstudy.【C1】_____
A、Loveforbeautyandadesiretoimpressotherpeople.B、Displayofone’swealthandadesiretoexpressoneself.C、Individual
A、Thewomanshouldspendmoretimeonexercise.B、Thewomanshouldtryotherwaystoloseweight.C、Thewomanshoulddomoreexe
FormanyAmericans,summerisatimetoputonswimwearandspendtimeattheseaoralake.Butbeforegoinganywhere,theyma
A、Invitingherfriendstoagathering.B、Stayingathomewithherparents.C、Relaxingattheseashore.D、Workingonherpaper.C
ABriefHistoryofOnlineShoppingA)WhenAmazon.comopenedforbusiness15yearsago,itwasnothingmorethanafewpeoplepac
ABriefHistoryofOnlineShoppingA)WhenAmazon.comopenedforbusiness15yearsago,itwasnothingmorethanafewpeoplepac
ABriefHistoryofOnlineShoppingA)WhenAmazon.comopenedforbusiness15yearsago,itwasnothingmorethanafewpeoplepac
Thenewspapermustprovideforthereaderthefacts,pure,objectivefacts.Butinthesedaysofcomplexnewsitmustprovidemo
随机试题
患者男,43岁,左侧咽痛伴耳痛4天,已在外院抗感染治疗3天,无明显好转。体检:左侧扁桃体充血,隐窝口少量稀脓性分泌物,向中线移位,腭舌弓隆起,腭垂水肿,左下颌角淋巴结肿大。最准确的诊断是
A.氮芥B.5-FUC.皮质激素D.自立霉素E.长春新碱
我国证券市场监管的主要内容是()。
辐射包括电离辐射和非电离辐射,以下属于非电离辐射的有()。
( )以单位工程为计算单元,用地区的统一单位计价表的各有关单价与相应各工料项目的工程量相乘之总和,得到包括工、料、机费用在内的单位工程的直接费,由此再计算出其他直接费、现场经费、间接费、计划利润及税金,汇总上述各项费用即得单位工程的施工预算。
【背景资料】某城市郊区新建一级公路长3km,路面设计宽度15m,含中型桥梁一座。路面面层结构为沥青混凝土。粗粒式下面层厚8cm,中粒式中面层厚6cm,细粒式上面层厚4cm。经批准的路面施工方案为:沥青混凝土由工厂集中厂拌(不考虑沥青拌合厂设备安
根据施工合同,甲建设单位应于2013年9月30日支付乙建筑公司工程款,2014年6月1日,乙单位向甲单位提出支付请求,则就该项款额的诉讼时效()。
评估房地产的市场价值应遵循的原则不包括()。
下列对各种现象的原理解释错误的是()。
Thegovernment’scontinuingfailuretoaddressournation’sgut-wrenchingunemploymentstemsfromafundamentaldisagreemento
最新回复
(
0
)