首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
26
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
Which of the following results Howard Gerber will accept?
选项
A、Get the refund.
B、Get the apology.
C、Reinstallation.
D、None of the above.
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/bWKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Forabouthowlonghasthecompanybeeninbusiness?
Forabouthowlonghasthecompanybeeninbusiness?
Forabouthowlonghasthecompanybeeninbusiness?
Whendidthemanstartworkingatthiscompany?
WhatwilltheStonebarkCompanydoonMarch1?
Accordingtotheman,whatchangewillbemadetothecompany?
随机试题
患者,女,40岁,以昏迷急诊入院,病史不详。查体:神志不清,多汗,双侧瞳孔缩小,呼吸及汗液发出大蒜味。诊断应考虑
狂病的病机是()
背景某施工单位与建设单位签订了路基工程施工承包合同,包括桥涵两座和路基填筑工程,合同工期390天,合同总价5000万元。施工前施工单位向工程师提交了施工组织设计和施工进度计划。该工程在施工过程中发生了如下情况:(1)因地质勘
理财规划服务合同的签订程序包括( )。Ⅰ.准备好合同文本Ⅱ.将合同交给客户,提醒客户认真阅读合同所有条款,并对客户理解有误或不理解的条款向客户做出详细解释Ⅲ.审查客户的身份,确认客户具有签订合同的行为能力Ⅳ.如客户对合同内容无异议,同意签署合同,
在订单匹配原则方面,根据各国证券市场的实践,优先原则主要包括( )。
某年2月1日,甲、乙双方签订了一份购销合同。合同约定甲方在6月底前将货物运至乙方,乙方于接到货物后J5天内将货款付给甲方。甲方按期将货物通过火车发运给乙方,但迟至9月底仍未收到乙方的货款,后诉至法院。乙方在法庭上辩称,由于8月份本地发洪水,致使自己无法履行
Whomwouldyouratherhave______withyou,himorme?
食用加碘盐可以预防甲状腺肿大,但摄人过多的碘可能会对人体产生危害。对此,有专家指出,只要食用加碘盐的量不超过专业部门规定的标准,就完全可以避免这种危害。因此,人们对于食用加碘盐的担心是毫无必要的。要使上述结论成立,所需要的前提是:
论述加涅的学习信息加工模式。
(2014年第10题)1924年1月,中国国民党第一次全国代表大会在广州召开,大会通过的宣言对三民主义作出了新的解释。新三民主义成为第一次国共合作的政治基础,究其原因,是由于新三民主义的政纲
最新回复
(
0
)