首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
56
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
Which of the following results Howard Gerber will accept?
选项
A、Get the refund.
B、Get the apology.
C、Reinstallation.
D、None of the above.
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/bWKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Forabouthowlonghasthecompanybeeninbusiness?
WhatwilltheStonebarkCompanydoonMarch1?
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
A、 B、 C、 A(A)在反问really的同时,补充说明看上去没有那么旧,故为正确答案。(B)使用与building发音相似的bill,需多加注意。(C)使用从building中可以联想到的companyworke
Whattypeofcompanyisthecallerworkingfor?
Whattypeofcompanyisthecallerworkingfor?
随机试题
被鲁迅在《魏晋风度及文章与药及酒之关系》中誉为“改造文章的祖师”’的是_______。
属于既病防变的是
A.右归丸B.独活寄生汤加附子C.四妙丸D.身痛逐瘀汤肾阳虚腰痛,治宜
A.易致肿疡B.易伤肺C.善行而数变D.多挟湿E.易伤阳气
监理的基本方法就是控制,基本工作是“三管”“两控”“一协调”。()
室外楼梯临空高度在24m以下时,栏杆高度不应低于()m。
制梁场主要机械设备需要配置()、混凝土输送泵、混凝土罐车、蒸汽养护系统以及模板系统等。
错账的更正方法一般有( )。
课程的文本一般表现为()。
在C++中,打开一个文件,就是将这个文件与一个()建立关联,关闭一个文件,就是取消这种关联。
最新回复
(
0
)