首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Mount Rushmore is a national monument located in the Black Hills of South Dakota. Carved into the side of the large mountain are
Mount Rushmore is a national monument located in the Black Hills of South Dakota. Carved into the side of the large mountain are
admin
2010-07-24
22
问题
Mount Rushmore is a national monument located in the Black Hills of South Dakota. Carved into the side of the large mountain are the faces of four men who were the Presidents of United States. These men were chosen because all four played important roles in American history. The four faces carved onto Mount Rushmore are those of George Washington, Thomas Jefferson, Abraham Lincoln and Theodore Roosevelt. Each face carved into the mountain is about 60 feet tall.
George Washington was chosen for this monument because of his role in the Revolutionary War and his fight for American independence. He was the first President of United States and is often called Father of the country. Thomas Jefferson was picked because he believed that people should be allowed to govern themselves, which is the basis for American democracy. Abraham Lincoln was added because he believed that all people are equal, and he helped end slavery in the United States. Theodore Roosevelt was chosen because he was such an influential President and world leader.
The man who carved Mount Rushmore was named Gutzon Borglum, and he worked on the monument until his death in 1941. After Gutzon Borglum died, his son Lincoln Borglum took his place and went on with the work on the mountain. Fourteen years were spent creating the faces on Mount Rushmore. Dynamite was used to blast the tough and giant rock off the mountain to make a smooth surface for the faces. George Washington was carved first, and his face began as an egg-shaped piece of rock. Thomas Jefferson was added to the right of George Washington, but his face cracked and had to he blasted off the mountain. Jefferson was then re-carved to the left of George Washington. Lincoln and then Roosevelt were added to the mountain. Snow and a dearth of money slowed down the process of the work, and all work on the monument had to come to an end when there was no money left to continue.
What does the word "dearth"(Line 8, Para. 3) mean as used in the text?
选项
A、Too much of something.
B、Change.
C、Shortage of something.
D、The wrong kind.
答案
C
解析
语义题。题干提问dearth在句子“Snow and a dearth of money slowed down the process of the work, and all work on the monument had to come to an end when there was no money left to continue.”中的意思。分析得知,缺钱是工程进度缓慢的原因,因此dearth意为“没有,缺乏”。
转载请注明原文地址:https://kaotiyun.com/show/cFN7777K
0
大学英语四级
相关试题推荐
MedicareinAmericaWhenDrugPricesAreoutofReachTrueStory.ElderlyanduninsuredAmericanspaythehighestpric
Americanuniversitiesarerushingtowardsawirelessfuture.Theyareinstallingnetworksthatletstudentsandteacherssurf(浏览
Americanuniversitiesarerushingtowardsawirelessfuture.Theyareinstallingnetworksthatletstudentsandteacherssurf(浏览
As【B1】______learnmoreabouthowchildren’sintelligencedevelops,theyareincreasingly【B2】______bythepowerofparents.The
A、Sunday.B、Saturday.C、Friday.D、Thursday.C此题为数字题,涉及的是日期。对话中提到今天是星期三,杂志可能后天才会到。稍加计算便可得知答案应当是星期五。
AutomobilesVSPublicTransportPublictransportplaysacentralroleinanyefficienturbantransportsystemindeveloping
AutomobilesVSPublicTransportPublictransportplaysacentralroleinanyefficienturbantransportsystemindeveloping
______(就住房情况而言),hepreferscountrytocity.
随机试题
高位小肠梗阻的表现是
病案的报告要求包括
痹证不具备的症状是
【背景资料】某高速公路设计车速120km/h,路面面层为三层式沥青混凝土结构。施工单位为某一大型公路专业施工企业,设施精良,技术力量雄厚。为保证工程施工质量,施工时作了如下控制:(1)选用合格的石料进行备料,严格对下承层进行清扫,并在开工前进行实验段铺
关于综合布线工程,说法正确的有()。
下列属于客户征信调查内容的是()。Ⅰ.投资经验Ⅱ.诚信记录Ⅲ.还款能力Ⅳ.关联关系
社会工作者接触到处于最低生活保障线边缘的贫困户,发现他们的生活大多数也比较困难,因此专门就低保边缘户的问题向相关部门提出建议,最终得到政府认同并制定了相关帮扶的政策。在社区照顾模式下,社会工作者承担的角色是()。
人民法院处理相邻关系应当遵循的原则是()。
用二进制加法器对二—十进制编码的十进制数求和,当和的本位十进制数二—十进制编码小于等于1001且向高位无进位时,(12);当和小于等于1001且向高位有进位时,(13);当和大于1001时,(14)。
下面不属于软件设计阶段任务的是
最新回复
(
0
)