首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
[A]existing[I]analysis [B]consumers[J]Enormously [C]released[K]identify [D]derivation[L]compelling [E]chief[M]ad
[A]existing[I]analysis [B]consumers[J]Enormously [C]released[K]identify [D]derivation[L]compelling [E]chief[M]ad
admin
2020-06-05
53
问题
[A]existing[I]analysis
[B]consumers[J]Enormously
[C]released[K]identify
[D]derivation[L]compelling
[E]chief[M]address
[F]emissions[N]Eventually
[G]enchant[O]diversion
[H]high-polluting
The most detailed data yet on emissions of heat-trapping gases show that US power plants are responsible for the bulk of the pollution blamed for global warming.
Power plants【C1】______72% of the greenhouse gases reported to the Environmental Protection Agency for 2010, according to information released Wednesday that was the first catalog of global warming pollution by facility. The data include more than 6,700 of the largest industrial sources of greenhouse gases, or about 80 percent of total US【C2】______.
According to an Associated Press【C3】______of the data, 20 mostly coal-fired power plants in 15 states account for the top-releasing facilities.
Gina McCarthy, the top air official at the EPA, said the database marked "a major milestone" in the agency’s work to【C4】______climate change. She said it would help industry, states and the federal government identify ways to reduce greenhouse gases.
The Obama administration plans to regulate emissions of heat-trapping gases under【C5】______law. A proposed regulation to address pollution from new power plants could be released as early as this month.【C6】______, the EPA will have to tackle facilities already in operation. The largest emitters will be the first in line.
The largest greenhouse gas polluter in the nation in 2010, according to the EPA’s data, was the Scherer power plant in Juliette, Ga. , owned by Southern Company. That coal-fired power plant reported releasing nearly 23 million metric tons of carbon dioxide, the【C7】______greenhouse gas, in 2010.
Two other power plants owned by Southern were the second-and third-largest polluters nationally: the Bowen plant in Bowen, Ga. , and the James H. Miller, Jr. power plant in Quinton, Ala.
American Electric Power, another large coal-fired power producer, has three power plants in the top 20. They are in Rockport, Ind. , Cheshire, Ohio, and St. Albans, W. Va.
"This is just another way to【C8】______the largest coal-fired power plants in the country," said AEP spokesman Pat Hemlepp. "We always assumed we would be No. 1 in greenhouse gas emissions or No. 2 behind Southern Co. We and Southern are the two largest【C9】______of coal. "
The other states with【C10】______power plants are Texas, Michigan, Missouri, Montana, Pennsylvania, Arizona, Wyoming, North Carolina, Kansas and Kentucky.
Refineries were the second-largest source of greenhouse gas emissions, with 57% of the reported total. The top states in greenhouse gas emissions from power plants and from refineries were Texas, Pennsylvania, Florida, Ohio, and Indiana.
Congress required industries to report their emissions as part of a 2008 spending bill. Until now, the agency has estimated greenhouse gas emissions by industry sector.
【C2】
选项
答案
F
解析
根据句子结构可知,此处缺少名词。结合句意:该数据包括6,700多家最大的温室气体工业源,约占美国温室气体______总量的80%。备选名词中的emissions“(尤指气体)排放,散发”符合句意,故[F]为答案。
转载请注明原文地址:https://kaotiyun.com/show/dLCK777K
0
专业英语四级
相关试题推荐
StopBeingaPeoplePleaser1.Say"no"Givereasonsinsteadof【T1】excuses【T1】______ExamplesIt’sstressfulto【T2】alargefamil
Althoughshe’sa(n)_______talenteddancer,shestillpracticesseveralhourseveryday.
A、Shewouldbehappytohandoverthemoney.B、Shewouldcompromiseeventhoughunwillingly.C、Shewouldarguewiththesponsors
A、Heiscoldandindifferent.B、Heisimpoliteandselfish.C、Heistooloudandthoughtless.D、Heislazyandhelpless.C本题考查人物
A.holeB.utteringC.crackD.quietE.betrayedF.flatteredG.concentrateH.speakingI.wanderJ.noisyKalthough
Afacial______systemisatechnologycapableofidentifyingorverifyingapersonfromadigitalimageoravideoframefroma
Businessbuyersareconsideredthemostvulnerableconsumersbecausethey______thenegotiatingpoweroflargegroups.
[A]existing[I]analysis[B]consumers[J]Enormously[C]released[K]identify[D]derivation[L]compelling[E]chief[M]ad
随机试题
泽泻性__________,既能清__________之热,又能泄__________之虚火,__________者尤为适宜。
下列属于药物性质影响透皮吸收的因素的是
处方分析A、醋酸氢化可的松微晶25gB、氯化钠3gC、羧甲基纤维素钠5gD、硫柳汞0.01gE、聚山梨酯801.5g注射用水加至1000ml润湿剂
卧床病人的头发已纠结成团时,欲湿润梳通头发可用
某工程项目合同工期为18个月。施工合同签订以后,施工单位编制了一份初始网络计划,如下图所示。由于该工程施工工艺的要求,计划中工作C、工作H和工作J需共用一台起重施工机械,为此需要对初始网络计划作调整。
静态会汁等式是编制()的重要依据。
第一种人。能独立完成一件事的人;第二种人,能领导一群人的人;第三种人,能作出决策制定政策的人。你想要成为哪种人?
S城的人非常喜欢喝酒,经常出现酗酒闹事,影响了S城的治安环境。为了改善城市的治安环境,市政府决定:减少S城烈酒生产的产量。以下哪项最能对市政府的决定进行质疑?
Liketheflu,aperson’semotionalstatecanbecontagious.Watchsomeonecry,andyou’lllikelyfeelsad;thinkabouttheelder
计算机网络中常用的有线传输介质有()。
最新回复
(
0
)