首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
admin
2022-09-09
48
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________, so are expensive
Need to use sunlight to prevent local plants from【L33】________Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________for the roof)
Building and maintenance done by local craftsmen Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________have greater opportunities
More children are educated
【L34】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low
. In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter
, which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter
. And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful
. The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap
. Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering
. In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone
, there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on
. They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities
. They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
unsuccessful
解析
本题询问之前的项目结果怎么样了。录音原文中的programmes in the past是题目Previous programmes的同义替换,故空格处填入unsuccessful。
转载请注明原文地址:https://kaotiyun.com/show/eBnD777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
A、交B、差C、并D、选择A用于查询的3个操作无法用传统的集合运算表示,引入的运算为投影运算、选择运算、笛卡尔积。常用的扩充运算有交、除、连接及自然连接等。选择,从关系中找出满足给定条件的元组的操作称为选择,题目中无给定条件,故D选项错误。差:R-
(1)新建数据库student.mdb,将考生文件夹中的student.xls导入到student数据库,第一行包含列标题,设置“学号”字段为主键,将导入表命名为“学生信息”。(2)将“选课.xls”以“选课”为表名导入student数据库,第一行包含列
考生文件夹下存在一个数据库文件“samp2.mdb”,里面已经设计好表对象“tTeacher”、“tCourse”、“tStud”和“tGrade”,试按以下要求完成设计:(1)创建一个查询,查找3月份上课的信息,并显示“教师姓名”、“职称”、“学院
PeoplewhotravelalotflywithHeavenAir,becausetheyknowtheywillgetwhattheywant.Theywanttogoquicklyandsafely
PeopleallovertheworldknowWimbledonasthecentreoflawntennis.In1874itwasacountryvillage,butitwasthehome
Whendoesthemuseumclose?
WhichTWOskillsdidBlancheandJeffreyagreetheyhadlearnedfromtheproject?AHowtomanagetheirtimeeffectively.B
Researchonweb-basedcrosswordsBlancheandJeffreychangedthedesignoftheoriginalquestionnairebecause
A、Puttinghisideasacrosstoothers.B、Solvingthornyproblems.C、Explainingsolutionstoothers.D、Planningaheadofcolleague
Teamworkplaysanimportantpartinourdailylifeandwork,butsometimesproblemswillarisewhenweareteamingup.Istillr
随机试题
目前认为微小病变性肾病最可能的发病机制是
大中桥宜采用触探和取样做土工试验确定地基承载力。()
某机电工程公司承接了电厂制氢系统机电安装工程,其范围包括:设备安装,主要有电解槽、氢气分离器等11台设备的安装;管道安装,包含氢气和氧气管道安装、阀门及附件安装;系统试运行,包括严密性试验、系统冲洗以及系统模拟试验。为了控制工程安装质量,在施工现
沥青混合料的结构类型可分为两类,即按()原则构成和按密实级配原则构成的结构。
背景:甲乙双方于3月1日订立100t的水泥供应合同,合同约定由乙方最迟于4月1日送货至甲公司,甲方按照交货时甲方所在地公布的造价信息作为结算依据,逾期交货1天的违约金为每吨5元。同时,乙方收取了甲方5000元定金。3月1日甲方所在地公布的水泥指导价格为每吨
两种完全正相关的股票组成的证券组合不能抵销任何风险。()
标前会议的主要目的是()。
在炎热的夏天经常会发现自来水管“出汗”,这是由于()。
下列属于体罚学生的情形是()。
下列表达式计算结果为日期类型的是( )。
最新回复
(
0
)