首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A、Whether the water is clean enough. B、If it can be used in all types of weather. C、If it will lead to less visitors. D、Whether
A、Whether the water is clean enough. B、If it can be used in all types of weather. C、If it will lead to less visitors. D、Whether
admin
2016-03-08
40
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £ 10 million open-air swimming pool in the middle of the Thames in Central London.
Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages. Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic. Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £ 300,000 to cover consultancy costs and other fees, which would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
19. What can be learned about Germany?
20. What do people concern about the project?
21. What is the function of the glass partition?
22. Where is the money of the project likely to come from?
选项
A、Whether the water is clean enough.
B、If it can be used in all types of weather.
C、If it will lead to less visitors.
D、Whether the river traffic will be affected.
答案
A
解析
转载请注明原文地址:https://kaotiyun.com/show/eIL7777K
0
大学英语六级
相关试题推荐
Mytopicishandedness—whetherindifferentsportsitisbettertobeleftorright-sidedorwhetheramorebalancedapproachis
Mytopicishandedness—whetherindifferentsportsitisbettertobeleftorright-sidedorwhetheramorebalancedapproachis
ManybelievethatthestoryfirstbeganinAmericain1877,whentwofriendswerearguing【B1】______whetherahorseeverhadall
Throughouthistorymanhasobservedsuchnaturalcyclesastherisingandsettingofthesun,theebbandflowoftheoceantide
A、HeknowswhenitwassenttoEurope.B、HebelievesitwasmadeinEgypt.C、HethinksitcamefromChina.D、Hedoubtswhereit
SevenStepstoaMoreFulfillingJobA)Manypeopletodayfindthemselvesinunfulfillingworksituations.Infact,oneinfourw
SevenStepstoaMoreFulfillingJobA)Manypeopletodayfindthemselvesinunfulfillingworksituations.Infact,oneinfourw
SevenStepstoaMoreFulfillingJobA)Manypeopletodayfindthemselvesinunfulfillingworksituations.Infact,oneinfourw
A、Variousfactorscontributetoobsession.B、Longtimedesireforfoodwillleadtosomediseases.C、Cravingleadstoslowerrea
随机试题
第一心音减弱见于
下列叙述不正确的一项是()。
根据《行政处罚法》规定,下列不属于行政处罚形式的是()。
根据《企业破产法》的规定,在人民法院受理破产申请1年前,债务人所为的下列行为中,无效或者可以撤销的是()。
项目进度计划的制订要考虑多方面因素,项目其他计划是项目进度计划制订的依据和约束条件。项目进度计划必须按照项目合同规定的交付以及中间交付的计划展开,同时项目进度计划必须要考虑项目成本计划、项目资源配置计划、项目采购计划等的配合才能安排工作的开完工时间及持续时
读我国某区域(图中阴影区域)分布图,完成下面题目。该区域()
竞争:共赢
()是犹太教教义中最能吸引信徒的观念。
下列法的分类中,专属于英美法系的是()(2013年一法综一第2题)
在数据库的外模式、模式和内模式三级模式的体系结构中,存在两级映像:外模式到模式的映像定义了外模式与模式之间的对应关系;模式到内模式的映像定义了数据库的逻辑结构与【】之间的对应关系。
最新回复
(
0
)