首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
财经
1.审证资料 DALIAN TOOL IMPORT&EXPORT CORPORATION 10 CAIDA RD.,BINHAI DISTRICT,DALIAN,CHINA T
1.审证资料 DALIAN TOOL IMPORT&EXPORT CORPORATION 10 CAIDA RD.,BINHAI DISTRICT,DALIAN,CHINA T
admin
2010-02-09
85
问题
1.审证资料
DALIAN TOOL IMPORT&EXPORT CORPORATION
10 CAIDA RD.,BINHAI DISTRICT,DALIAN,CHINA
Tel:0411—64326699 S/C No.:DC080123
Fax:0411—64326698 Date:Jan,1,2008
E—mail:DTX@163.corn P/I No.:DP07121806
SALES CONTRACT
TO:CHR TRADING GMBH
56 MARAHALL AVE,BREMERHAVEN GERMANY
This contract is made by and between the Sellers and Buyem,whereby the sellers agree to sell and the buyers agree to buy the under-mentioned goods according to the conditions stipulated below**
(1)Packing:WATER PUMP FI:Packed in l carton of 2 sets each;
WATER PUMP FII:Packed in l ca~on of 2 sets each
Packed in one 40’FCL water pump
(2)Delivery From DALIAN,CHINA to BREMERHAVEN,GERMANY
(3)Shipping marks:N/M
(4)Time of Shipment:Latest Date of Shipment Mar.20,2008
(5)Partial Shipment:Not Allowed
(6)Transshipment:Allowed
(7)Terms of Payment:By Irrevocable Letter of Credit at sight.
(8)Arbitration:
Anv dispute arising from the execution of or in connection with this contract shall be settled amicably through negotiation.In case no settlement can be reached through negotiation,the case shall then be submitted to China International Economic&Trade Arbitration Commission in Beijing(orin Shanghai)for arbitration in accordance with its arbitration rules.The arbitration award is final and binding upon both parties.The fee for arbitration shall be borne by the losing party.
DOCUMENTARY CREDIT
SEQUENCE OF TOTAL *27: 1/1
FORM OF DOC.CREDIT *40A: REVOCABLE
DOC.CREDIT NUMBER *20: GCD0801 1639
DATE OF ISSUE 31C: 2008-0l-16
DATE AND PIACE 0F EXPIRY *31D: DATE 2008—04—20 PLACE GERMANY
APPLICANT *50: CHR TRADING GMBH
56 MARAHALL AVE.
BREMERHAVEN GERMANY
ISSUING BANK 52A: CENTRAL BANK OF GERMANY 29 LIEIN AVE BREMERHAVEN GERMANY
BENEFICIARY *59: DALIAN TOOL IMPORT&EXPORT CORP 10 CAIDARD..BINHAl DISTRICT. DALIAN.CHINA
AMOUNT *32B: CURRENCY CNY AMOUNT 36.800.00
AVAILABLE WITH/BY *41 D: BANK OF CHINA BY NEGOTIATION
DRAFYS AT 42C: 30 DAYS AFTER SIGHT
DRAWEE 42A: CENTRAL BANK 0F GERMANY 29 LIEIN AVE BREMERHAVEN GERMANY
PARTIAL SHIPMENTS 43 P: ALLOWED
TRANSSHlPMENT 43T: NOT ALLOWED
LOADING ON BOARD 44A: DALIAN
FOR TRANSPORTATION NO 44B: BREMERHAVEN.GERMANY
LATEST DATE OF SHIPMENT 44C: 2008-02-20
DESCRIIyr OF GOODS 45 A: WATER PUMP AS PER PROFORMA INVOICE NO. DP06121806 DATED DEC.18.2006 CIP BREMERHAVEN
DOCUMENTS REQUIRED 46A: +SIGNED COMMERCIAL INVOICE,1 ORIGINAL AND 3 COPIES.
+PACKING LIST.1 ORIGINAL AND 3 COPIES.
+CERTIFICA,I’E OF ORIGIN.ISSUED BY THE ENTER-EXIT INSPEC,ANN AND QUARANTINE OF THE PEOPLE’S REPUBUC OF CHINA.
+FULL SET OF B/L.(3 ORIGINALS AND 3 COPIES)CLEAN ON BOARD.MARKED“FREIGHT COLLECT”CONSIGNED TO:CHR TRADING GMBH 56 MARAHALL AVE. BREMERHAVEN GERMANY NOTIFY:AS CONSIGNEE
+FULL SET OF NEGOTIABLE INSURANCE POLICY OR CERTIFICATE BLANK ENDORSED FOR 120 PCT OF INVOICE VALUE COVERING ALL RlSKS AND WAR RISK.
CHARGES 71 B: ALL BANKING CHARGES OUTSIDE NORWAY ARE FOR ACCOUNT OF BENEFICIARY.
PERIOD FOR PRESENTATlON 48: DOCUMENTS MUST BE PRESENTED WITHIN 14 DAYS AFTER THE DATE OF SHIPMENT
2.审证要求
根据销售合同资料审核上述信用证内容,找出信用证内容的不符点,请在下面详细列出:
(1)____________________________________________________________________________
(2)____________________________________________________________________________
(3)____________________________________________________________________________
(4)____________________________________________________________________________
(5)____________________________________________________________________________
(6)____________________________________________________________________________
(7)____________________________________________________________________________
(8)____________________________________________________________________________
(9)____________________________________________________________________________
(10)___________________________________________________________________________
(11)___________________________________________________________________________
(12)___________________________________________________________________________
(13)___________________________________________________________________________
选项
答案
(1)*40A: REVOCABLE 改为: lRREVOCABLE (2)*31D.DATE 2008-04-20 PLACE GERMANY 改为: DATE 2008-04-20 PLACE CHINA (3)*59 :10 CAIDARD.,BINHAI DISTRICT. 改为:10 CAIDA RD.,BINHAI DISTRICT, (4)*32B: CURRENCY CNY AMOUNT 36 800.00 改为:CURRENCY USD AMOUNT 36 800.00 (5)42C. 30 DAYS AFrER SIGHT改为:AT SIGHT (6)43P: ALLOWED 改为: NOT ALLOWED (7)43T: NOT ALLOWED 改为: ALLOWED (8)44C: 2008—02—20改为: 2008-03-20 (9)45A:DP07121806 DATED Dec.18,2006 改为: DP07121807 DATED Dec.18,2007 (10)45A: CIP BREMERHAVEN 改为: CIF BREMERHAVEN (11)46A: “FREIGHT COLLECT” 改为: “FREIGHT PREPAID” (12)46A: FOR 120 PCT OF INVOICE VALUE 改为: FOR 11O PCT 0F lNVOlCE VALUE
解析
转载请注明原文地址:https://kaotiyun.com/show/eNxr777K
本试题收录于:
单证操作与缮制题库国际商务单证员分类
0
单证操作与缮制
国际商务单证员
相关试题推荐
在CIF条件下,由()办理保险,如果货物在运输过程中发生保险公司承保范围内的损失,()根据保险单向保险公司索赔,与()无关
某外资企业出口一批男式全羊毛西服,该批西服分别用约85%的进料加工料件和15%的国产原料加工而成,请问该企业在向海关办理出口申报手续时应填写哪种报关单()
因为原材料的交货时间将直接影响到生产的进程,所以交货时间是越早越好。()
中国的包装是指为在流通中保护产品、方便储运、促进销售,按一定技术方法而采用的容器、材料及辅助物等的总体名称。()
《商品名称及编码协调制度》中商品编码的前两位表示()
在商业票据中处于中心单据地位的是()
我国A公司对澳大利亚出口800吨大豆,国外开来信用证规定:不允许分批装运。结果我们在规定的期限内分别在3月11日和3月12日在大连、上海各装400吨大豆于“和谐号”船上,运往指定目的港。A公司在规定的交单期内向银行交单,最后开证行以A公司分批装运为由拒付,
随机试题
A.脾血窦B.毛细血管后微静脉C.髓窦D.中央动脉由长杆状内皮细胞围成()
安装多级离心泵地角螺栓时的不垂直度允许偏差为()。
治疗前肢风湿疾病的主穴是
知觉是人脑对客观事物
全要素生产率是指经济增长中减去所有投入要素()加权平均后的总和的增长。
雷电是大气中的一种放电现象,具有电性质、热性质和机械性质三方面的破坏作用。下列雷电造成的破坏现象中,属于热性质破坏作业的是()。
下列属于非系统性风险的有()。I.信用风险Ⅱ.操作风险Ⅲ.合规风险Ⅳ.通胀风险
关于社会保险,下列说法正确的有()。
FinancialTurmoilintheWorldCausesaSocialHazardDespiteadropinmetropolitanWashington’sjoblessrate,regionaleco
A、Theadvantagesoflivinginvacationrentals.B、Theadvantagesoflivinginhotels.C、Theaccommodationconditionduringatri
最新回复
(
0
)