Meantime, road construction is ______ on the site of a proposed Tuman River Triangle.

admin2010-12-06  35

问题 Meantime, road construction is ______ on the site of a proposed Tuman River Triangle.

选项 A、under way
B、in the way
C、of the way
D、by way

答案A

解析 under way已经开始并进行着。
转载请注明原文地址:https://kaotiyun.com/show/f4IO777K
0

最新回复(0)