首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
THE TRIANGLE FACTORY FIRE 1 The fire at the Triangle Waist Company in New York City was one of the worst workplace disasters i
THE TRIANGLE FACTORY FIRE 1 The fire at the Triangle Waist Company in New York City was one of the worst workplace disasters i
admin
2012-01-14
40
问题
THE TRIANGLE FACTORY FIRE
1 The fire at the Triangle Waist Company in New York City was one of the worst workplace disasters in the history of labor. The incident highlighted the inhumane working conditions faced by many industrial workers, including low wages, excessively long hours, and an unsanitary and dangerous work environment. The Triangle Waist Company, a shirt factory, was a typical sweatshop in the heart of New York’s garment district. Most of the workers were women, some as young as 15 years old, mostly recent Italian and European Jewish immigrants who had come to the United States with their families to seek a better life.
Already struggling with a new language and culture, these workers could not speak out about working conditions for fear of losing their desperately needed jobs, and this forced them to endure exploitation by the factory owners.
2 On March 25, 1911, one of the five hundred employees of the Triangle Waist factory noticed that a rag bin near her eighth-floor workstation was on fire. She and her co-workers immediately tried to extinguish the flames, but their efforts proved futile, and piles of fabric
ignited
all over the eighth floor. The factory manager ordered his employees to unroll the
fire extinguisher hose
, but they found it rotted and useless. Panic erupted as the fire spread.
3 The shirt factory occupied the top three floors of the ten-story Asch Building. The seventy employees who worked on the tenth floor escaped the fire by way of the staircases or by climbing onto the roof, where students from New York University, located across the street, stretched ladders over to the Asch Building. The 260 workers on the ninth floor had the worst luck of all. Although the eighth-floor workers tried to warn them by telephone, the call did not reach them, and by the time the ninth-floor workers learned about the fire, their routes of escape were mostly blocked. When they found many of the exit doors locked, some managed to climb down the cables of the freight elevator. Others crammed into one narrow stairway. Still others climbed onto the single, inadequately constructed fire escape. However, the fire escape led nowhere, and it bent under the weight of hundreds of workers trying to escape. The spindly structure separated from the wall, falling to the ground and carrying many people with it.
4 To combat the disaster, the New York Fire Department sent thirty-five pieces of equipment, including a hook and ladder. The young women trapped on the ninth floor waited on the window ledges to be rescued, only to discover that the ladder, fully raised, stopped far below them at the sixth floor. Water from the hoses could not reach the top floors, and many workers chose to jump to their deaths rather than to burn alive. Within minutes, the factory was consumed by flame, killing 146 workers, mostly immigrant women. City officials set up a temporary morgue in a building on 26th Street, and over the next few days streams of survivors filed through the building to identify the dead.
5 The ten-story Asch Building was a firetrap typical of the working conditions of the period, and the Triangle fire tragically illustrated that fire inspections and safety precautions were very inadequate. The victims of the fire were trapped by the lack of fire escapes and by management’s practice of locking the exit doors during work hours. The incident had a profound impact on women’s unionism and job safety, affecting local and national politics in the process. An era of progressive reform began to
sweep the nation
, as people decided that government had a responsibility to ensure that private industry protected the welfare of workers. There was a public outcry for laws to regulate workplace safety. The New York Factory Investigating Commission was formed to examine the conditions in factories throughout the state, and their report led to many new regulations in the years following the fire.
6 The fire at the Triangle Waist Company highlighted the excesses of industrialism. The tragedy remains in the collective memory of the labor movement, and the victims of the tragedy are still honored as martyrs at the hands of industrial greed.
All of the following characterized the factory of the Triangle Waist Company EXCEPT
选项
A、unsafe working conditions
B、a large number of female workers
C、a strong labor union
D、workrooms on three floors
答案
C
解析
The passage does not state that a strong labor union was a characteristic of the Triangle Waist Company’s factory. All of the other answers are given:... the inhumane working conditions.., an unsanitary and dangerous work environment; Most of the workers were women... ; The shirt factory occupied the top three floors....(1.2)
转载请注明原文地址:https://kaotiyun.com/show/fWyO777K
0
托福(TOEFL)
相关试题推荐
Inboxes30-36onyouranswersheet,writeYESifthestatementagreeswiththeclaimsofthewriterNOifthestatementcontrad
Inboxes30-36onyouranswersheet,writeYESifthestatementagreeswiththeclaimsofthewriterNOifthestatementcontrad
Completethesummarybelow.ChooseNOMORETHANTWOWORDSfromthepassageforeachanswer.Writeyouranswersinboxes19-23o
Whichparagraphcontainsthefollowinginformation?Writethecorrectletter,A-l,inboxes17-21onyouranswersheet.NBYou
Youshouldspendabout20minutesonQuestions1-13,whicharebasedonReadingPassage1below.Seedvault
TheHistoryoftheGuitarTheword’guitar’wasbroughtintoEnglishasanadaptationoftheSpanishword’guitarra,’whichwas,
HowdesertsareformedA.Adesertreferstoabarrensectionofland,mainlyinaridandsemi-aridareas,wherethereisal
Tiktaalikrosaeisconsideredtobeanevolutionary______.【34】
Howdidthestudentgettheuniversityprospectus?doaidwork
environmentalissues
随机试题
下面关于运算符重载的描述中,正确的是()。
关于留置肾盂造瘘管的患者的护理措施不正确的是
根据《建设项目环境影响评价文件分级审批规定》,以下中央财政投资铁路建设基金项目环境影响评价文件,由国家环境保护总局审批的是()。
项目评估是政府、金融机构或建设单位等投资主体进行项目投资决策的重要基础与依据,其作用主要体现在()。
提出电信管道、电信杆路、通信铁塔联合建设意向的电信业务经营者召集各参建电信运营商,共同商定(),并签订联合建设协议。
2011年12月1日向阳公司与大海公司签订了一份租赁合同。合同主要条款如下。 租赁标的物:电动自行车生产线。 (1)租赁期开始日:2011年12月31日 (2)租赁期:2011年12月31日~2014年12月31日,共3年。 (3)租金支付
抵押合同的内容包括()
经营杠杆系数可以用基期边际贡献除以基期息税前利润来计算。()
某校有7名优秀的学生G、H、L、M、U、W和Z。暑假期间,学校将派他们去英国和美国考察。该校只有这7名学生参加这次活动,每人恰好去这两个国家中的一个,考虑到每个学生的特长,这次活动必须满足以下条件:(1)如果G去英国,则H去美国。(2)如果L去英国,则
•ReadthearticlebelowaboutIevelsOfmanagement.•ChoosethecorrectwordtofilleachgapfromA,B,CorD.•Foreach
最新回复
(
0
)