首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The Catcher in the Rye is written by
The Catcher in the Rye is written by
admin
2014-04-17
54
问题
The Catcher in the Rye is written by
选项
A、J.D.Salinger.
B、Jack London.
C、Flannery O’Connor.
D、Saul Bellow.
答案
A
解析
杰洛姆.大卫.塞林格是“垮掉的一代”(Beat Generation)的重要作家,他最先描写中产阶级子弟的苦闷彷徨。《麦田里的守望者》(The Catcher in the Rye)是他的成名作。
转载请注明原文地址:https://kaotiyun.com/show/h9pO777K
0
专业英语八级
相关试题推荐
TheGrapesofWrathwaswrittenby
EndtheUniversityasWeKnowIt1.ProblemsconfrontingAmericanuniversitiesA.impracticalgraduate(1)(1)______B.isolated
EndtheUniversityasWeKnowIt1.ProblemsconfrontingAmericanuniversitiesA.impracticalgraduate(1)(1)______B.isolated
TherighttopursuehappinessisissuedtoAmericanswiththeirbirthcertificates,butnooneseemsquitesurewhichwayitra
Whatisthesinglelargestproblemfacingthehealthcaresystemtoday?
Whatisthesinglelargestproblemfacingthehealthcaresystemtoday?
ThenovelTheCatcherintheRyewaswrittenby______.
TV,Internetandradioareverypopularnowadays.Somepeoplesaythattheywillreplacebooksandwrittenwordsasthemainsou
______isdielargestcityinCanada.
A、gotoaCostco.B、buyinlargequantity.C、askforothers’favor.D、buysecond-handitems.B
随机试题
A.40~60cmB.75~100cmC.150~180cmD.180~200cmE.200cm以上四肢摄影的摄影距离是
根据《刑法》规定,违反土地管理法规,非法占用耕地、林地等农用地,改变被占用土地用途,数量较大,造成耕地、林地等农用地大量毁坏的,处()年以下有期徒刑或者拘役,并处或者单处罚金。
某高层办公楼,总建筑面积137500m2,地下3层,地上25层。业主与施工总承包单位签订了施工总承包合同,并委托了工程监理单位。施工总承包单位完成桩基工程后,将深基坑支护工程的设计委托给了专业设计单位,并自行决定将基坑支护和土方开挖工程分包给了一家专业分包
以下为广州珠江公司2009年6月10日到6月20日发生的全部业务:①公司对外销售产品100斤,单位价格200元,增值税率为17%,价税合计为23400元,款项已收并存入银行。②用盈余公积转增资本20000元。③差旅人员因出差向单
下列各项中,影响当期利润表“营业利润”项目金额的有()。
下列项目中,属于金融负债的有()。
A、13B、28C、33D、49B前两个圆圈的数字规律为23+12=18+17,8+19=13+14,则可得出34+?=17+45,求得问号处数字为28,故选B。
A、 B、 C、 D、 A计算交点个数。前面四个图形的交点个数分别是11,15,13,7,那么第5个图形的交点数应该是9个,选A。
秦代推行的“吏师制”是一种历史的倒退。
下列命令的执行结果为______。?STR(12345.6789,8,3),DTOC(CTOD("02/23/2002"),1)
最新回复
(
0
)