首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A、Workers on the platforms and trains were replaced by machines. B、A completely automatic line was added to its network. C、It be
A、Workers on the platforms and trains were replaced by machines. B、A completely automatic line was added to its network. C、It be
admin
2009-08-19
85
问题
The world’s first completely automatic railway has been built under the busy streets of London, The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969.This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so- called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-eight years ago?
综合短文中的The world’s first completely automatic railway has been built under the busy streets of London.及and it is part of the complete London underground railway.…was opened in 1969可知,B为答案。
转载请注明原文地址:https://kaotiyun.com/show/hSpK777K
0
大学英语六级
相关试题推荐
A、At8:35.B、At8:45.C、At8:00.D、At8:25.C根据女士的回答“every30minutes”,“7:30train”,“nexttrain”等关键词可计算出下一班火车是8点,故选C。
IntheUnitedStates,peoplemaygotodifferentshoppingplacesaccordingtotheireconomic【T1】______Wealthypeopleoftengot
A、Bookataxi.B、Reservearoom.C、Orderbreakfastforhim.D、Keepthingsforhisfriend.D题干问男士让女士做什么。根据对话内容可知,男士询问女士能否帮他保管朋友的
A—multimediamessageserviceJ—fixeddialB—subscriberidentitymoduleK—automaticredialC—voicepromptL—two-waychargin
TheHealthCenterprovidesconvenientwaystoschedulean(appoint)______withitsdoctors.
说明:假没你是人事部经理FrankSmith,给员工Woody写一封解雇信。时间:11月27日内容:1.说明要解雇Woody;2.说明解雇的原因:经济不景气,公司效益低;3.对Woody的工作给予肯定,如果需要,可以为他写推荐信。注意信函格式
说明:假设你是王亮,请用下面提供的信息写一封自荐信。时间:3月12日内容:1.写信原因:在网上看到TotalTrade公司招聘销售经理;2.自我介绍:营销专业大学毕业,擅长与人沟通等;3.自我推荐:简要介绍自己的才能、经验以及对公司的了解;4
说明:假设你是王亮,请用下面提供的信息写一封自荐信。时间:3月12日。内容:1.写信原因:在网上看到TotalTrade公司招聘销售经理;2.自我介绍:营销专业大学毕业、擅长与人沟通等;3.自我推荐:简要介绍自己的才能、经验以及对公司的了解;
Forthispart,youareallowed30minutestowriteacompositiononthetopic2008OlympicsandI.Youshouldwriteatleast150
A、Theylefttheirpetswithneighbors.B、Theyrentedtheirhousetoastudent.C、Theyhiredsomeonetostayintheirhome.D、The
随机试题
A.>103cfu/mlB.>104cfu/mlC.103~104cfu/mlD.>105cfu/mlE.104~105cfu/ml尿标本培养为革兰阴性杆菌,有诊断意义的是
血管神经性水肿严重的并发症为
男性,46岁,因甲状腺机能亢进症而行甲状腺大部切除术,手术经过顺利,术后第二天,病人诉手部阵发性针刺感,唇部也有类似感受。则该患者可能的并发症是
切脉时轻用力按在皮肤上为浮取,名曰
升高温度可以增加反应速率,主要是因为()。
下列关于干粉灭火系统试压和吹扫要求的表述,正确的是()。
对象专业化的生产单位宜采用()。
儿童中心论
整个电路板PCB的设计流程一般可以分为三个主要部分,依次是前处理、中处理以及后处理。前处理主要是进入PCB板前的准备工作,中处理是整个电路板设计的关键所在,后处理是输出电路板的最后工作。以下不属于这三个部分的是______。A.原理图设计B.进行布线
Mostworthwhilecareersrequiresomekindofspecializedtraining.Ideally,therefore,thechoiceofan【C1】______shouldbemade
最新回复
(
0
)