首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A、To separate the changing rooms from the pool. B、To provide a path to the swimming area. C、To make the pool shallow enough for
A、To separate the changing rooms from the pool. B、To provide a path to the swimming area. C、To make the pool shallow enough for
admin
2016-03-08
51
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £ 10 million open-air swimming pool in the middle of the Thames in Central London.
Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages. Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic. Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £ 300,000 to cover consultancy costs and other fees, which would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
19. What can be learned about Germany?
20. What do people concern about the project?
21. What is the function of the glass partition?
22. Where is the money of the project likely to come from?
选项
A、To separate the changing rooms from the pool.
B、To provide a path to the swimming area.
C、To make the pool shallow enough for children.
D、To protect people from waves caused by river traffic.
答案
D
解析
转载请注明原文地址:https://kaotiyun.com/show/lIL7777K
0
大学英语六级
相关试题推荐
A、Theyaretalkingaboutthecurrentaffairs.B、Theyarehavingadiscussion.C、Theyarequarrellingwitheachother.D、Theyare
Ourape-menforefathershadnoobviousnaturalweaponsinthestruggleforsurvivalintheopen.Theyhadneitherthepowerfult
Throughouthistorymanhasobservedsuchnaturalcyclesastherisingandsettingofthesun,theebbandflowoftheoceantide
TheIndustrialRevolution[A]TheIndustrialRevolutionisthenamegiventothemassivesocial,economic,andtechnologicalchan
Whenglobalwarmingfinallycameitstuckwithavengeance(异乎寻常地).Insomeregionstemperaturesroseseveraldegreesinlesstha
Whenglobalwarmingfinallycameitstuckwithavengeance(异乎寻常地).Insomeregionstemperaturesroseseveraldegreesinlesstha
A、Becausethewaterpressureisgreaterthanairpressure.B、BecausethefirstCometscrashedinthewater.C、Becausethereisl
SevenStepstoaMoreFulfillingJobA)Manypeopletodayfindthemselvesinunfulfillingworksituations.Infact,oneinfourw
SevenStepstoaMoreFulfillingJobA)Manypeopletodayfindthemselvesinunfulfillingworksituations.Infact,oneinfourw
A、Twoimportanttestsofanewairlinerbecauseitisputintouse.B、Howtocarryouttanktestinthewater.C、Howpilotscarr
随机试题
Coats病的鉴别诊断包括
对于肾上腺皮质功能减退的诊断下列较可靠的是
根据我国法律的有关规定,涉外合同纠纷的双方当事人可以通过协议选择处理合同争议所适用的法律,但当事人选择的法律不能适用于以下哪一事项:
某机电工程安装公司(以下简称A公司)总承包了某石化装置安装工程的施工任务。装置施工的主要内容包括:28台重30~80t的机电设备吊装、安装;油、气和其他介质的工艺及系统管道4500m安装、组对、焊接;电气仪表工程、给水排水工程及防腐绝热工程施工。A公司将工
企业申请延续资质证书,应在资质证书有效期届满()前向发证机关提出申请。
检查屋面是否有渗漏、积水和排水系统是否畅通,应在雨后或持续淋水()h后进行。
2012年年末全国公路总里程达423.76万公里,比上年末增加13.11)万公里。公路密度为44.14公里/百平方公里,比上年末提高1.37公里/百平方公里。按行政等级划分:国道17.34万公里、省道31.21万公里、县道53.95万公里、乡道107.67
某建设项目计划投资额为8000万元,建筑面积5万m2,建筑工程投资2000万元,年设计产量4万台,将形成6400万元的固定资产价值,预计建成投产后年折旧额600万元,年利润额1000万元,年均利税额1600万元,请回答下列问题:题中单位生产能力投资是(
下列选项中,应当属于要约的是()。
Everyonewhohasvisitedthecityagreesthatitis______withlife.
最新回复
(
0
)