首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
How many pre-constructed sections are made on land?
How many pre-constructed sections are made on land?
admin
2013-08-21
78
问题
How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、Ships at sea.
B、A train from the opposite direction.
C、The powerful ocean.
答案
C
解析
最后Professor Massa提到Maglev train的不好之处就在于海洋的巨大威力对海底隧道有很大的威胁。
转载请注明原文地址:https://kaotiyun.com/show/lcVK777K
本试题收录于:
C类竞赛(非英语专业本科)题库大学生英语竞赛(NECCS)分类
0
C类竞赛(非英语专业本科)
大学生英语竞赛(NECCS)
相关试题推荐
______youarefamiliarwiththeauthor’sideas,tryreadingallthesectionsasquicklyasyoucan.
______youarefamiliarwiththeauthor’sideas,tryreadingallthesectionsasquicklyasyoupossiblycan.
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
随机试题
300MW凝汽式汽轮机启动,选择蒸汽参数时要求蒸汽的过热度不小于()。
长期使用肾上腺皮质激素,会导致嗜酸性粒细胞减少。()
属于意外性移动的是
复温法是治疗小儿五硬证的重要措施之一。下列哪项不是复温的合理方法
工业安装单位工程划分的标准有()。
投资者办理上海证券交易所和深圳证券交易所交易型开放式指数基金份额的认购、赎回业务,需使用在中国结算公司开立的证券账户。()
位于市区的某居民企业为增值税一般纳税人,主要生产销售同一型号的热水器。热水器单台销售成本0.1万元、市场不含税销售价格0.18万元。2016年度企业财务核算反映的信息为:销售热水器共计3万台,取得不含税销售收入5400万元,取得直接投资居民企业的股息收入
3,2,11,14,27,()
设f(x)二阶连续可导,g(x)连续,且则().
在VisualFoxPro中,仅显示当前表当前记录的命令是
最新回复
(
0
)