首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
How many pre-constructed sections are made on land?
How many pre-constructed sections are made on land?
admin
2013-08-21
74
问题
How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、Ships at sea.
B、A train from the opposite direction.
C、The powerful ocean.
答案
C
解析
最后Professor Massa提到Maglev train的不好之处就在于海洋的巨大威力对海底隧道有很大的威胁。
转载请注明原文地址:https://kaotiyun.com/show/lcVK777K
本试题收录于:
C类竞赛(非英语专业本科)题库大学生英语竞赛(NECCS)分类
0
C类竞赛(非英语专业本科)
大学生英语竞赛(NECCS)
相关试题推荐
A、Itwillhelpfixdangerousintersectionsofroads.B、Itwillcontributetoraisingmorefederalfunds.C、Itwillenhancethec
______youarefamiliarwiththeauthor’sideas,tryreadingallthesectionsasquicklyasyoucan.
______youarefamiliarwiththeauthor’sideas,tryreadingallthesectionsasquicklyasyoupossiblycan.
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
Howmanypre-constructedsectionsaremadeonland?
随机试题
中央银行提高贴现率会导致()
脉诊的"寻"法是指()
下列案件法院应该受理的是:()。
如果商业银行在外汇交易中以美元兑换客户的欧元,而客户未履行将欧元划到银行指定账户的义务,这可能性就是商业银行承担的()。
乙股份有限公司(以下简称“乙公司”)为华东地区的一家上市公司,属于增值税一般纳税人。乙公司2013年至2016年与固定资产有关的业务资料如下:(1)2013年12月1日,乙公司购入一条需要安装的生产线,取得的增值税专用发票上注明的生产线售价为1170万元
影响课堂管理效果的直接因素是()
教育目的是一切教育活动的()。
根据《中华人民共和国宪法》规定,具有监督宪法的实施职能的是()。
当完全竞争厂商(并非整个行业)处于长期均衡时,()。
在学生表中要查找所有年龄小于20岁且姓王的男生,应采用的关系运算是( )。
最新回复
(
0
)