首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
London’s First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It i
London’s First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It i
admin
2009-06-15
44
问题
London’s First Light Rail System
The Docklands Light Railway (DLR) took just three years to build at a cost of£77 million. It is London’s first Light Rail System, but its route follows that of a number of older lines, which carried the nineteenth century railways through the crowded districts of the East End.
The section of the line from the Tower Gateway Station to Poplar follows the line of one of London’s earliest railways, the London & Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided transport for the messengers and clerks who went backwards and forwards between the docks (码头) and the city every day.
From Poplar to Island Gardens, a new line crosses high above the dock waters, and then joins the old track of the Millwall Extension Railway, built to service the Mil[wall Docks (1868) and to provide transport for workers in the local factories. This line was horse-drawn for part of its route, until the 1880s.
The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of ’England. There were major railway works and sidings (岔线) at Bow until recently.
The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable; on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and self-service ticket machines, at every station.
选项
A、was constructed in the nineteenth century.
B、will be finished in three years’ time.
C、follows some of the original lines.
D、took three years longer than expected to complete.
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/n4hd777K
本试题收录于:
职称英语理工类C级题库职称英语分类
0
职称英语理工类C级
职称英语
相关试题推荐
Hypnosis(催眠)1IncreasingnumbersofAmericandoctorsareusingatechniqueknownashypnosis.Theysayhypnosisoftencanhelp
ChangesofWomen’sRoleTheroleofwomeninBritainhaschangedalotinthiscentury,(51)inthelasttwentyyears.Them
ChangesofWomen’sRoleTheroleofwomeninBritainhaschangedalotinthiscentury,(51)inthelasttwentyyears.Them
Medicinedependsonotherfieldsforbasicinformation,particularlysomeoftheirspecializedbranches.
Eventually,shegotajobandmovedtoLondon.
Thepassagecouldbeentitled______.Accordingtothepassage,youngpeoplelovecoffeebecauseof______.
BreastCancerDeathsRecordLowThenumberofwomendyingfrombreast(乳房)cancerhasfallentoarecordlowbydroppingund
TheFirstFourMinutesWhendopeopledecidewhetherornottheywanttobecomefriends?Duringtheirfirstfourminutestog
Common-coldSenseYoucan’tbeatit,butyoudon’thavetojoinit.Maybeitgotthename"commoncold"becauseit’smorec
Thereasonfortheirunusualbehaviorremainsapuzzle.
随机试题
霍乱的传染源是
绒癌患者如果出现胸闷、憋气,可能发生()。
如图所示,杆受自重作用,已知杆长l,单位长度自重为ρ,则杆的最大轴力为()。
背景资料:某单位中标污水处理项目,其中二沉池直径51.2m,池深5.5m。池壁混凝土设计要求为C30、P6、F150,采用现浇法施工。施工单位自行设计了池壁异型模板,考虑了模板选材、防止吊模变形和位移的预防措施,对模板强度、刚度和稳定性进行了计算,考虑
某高校学生上网时间的差异很大,因此宜采用()反映学生上网时间的平均水平。
证券公司根据与客户的约定采取强制平仓措施的,应按照交易所规定的格式申报强制平仓指令。申报指令应包括客户的()等内容。
某企业正在考虑某设备的技术改造问题,该设备的原始价值K0=16000元,每年低劣化增加值λ=1000元,更新时无残值。根据以上资料,回答下列问题:()是指某技术改造项目由两种及其以上方案时,采用某一方案比采用其他方案多投资的部分,由采用这一方
儿童容易模仿影片中反面人物的行为,结果导致不良品德,为避免影视片的消极影响,根据班杜拉社会学习理论,适当的做法是()
在课堂上,某教师注重创造自由气氛,鼓励学生发表意见,不要把自己的意志强加于学生,该教师对课堂管理的领导方式属于()。
Completethesummarybelow.WriteNOMORETHANONEWORDfromthetextforeachanswer.Writeyouranswersinboxes24-26onyour
最新回复
(
0
)