首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
For nearly a century, two United States governmental agencies, the United States Army Corps of Engineers and the Bureau of Recla
For nearly a century, two United States governmental agencies, the United States Army Corps of Engineers and the Bureau of Recla
admin
2022-07-08
40
问题
For nearly a century, two United States governmental agencies, the United States Army Corps of Engineers and the Bureau of Reclamation, have constructed dams to store water and to generate electricity. Building these dams provided cheap electricity, created jobs for workers, stimulated regional economic development, and allowed farming on lands that would otherwise be too dry. But not everyone agrees that big dam projects are entirely beneficial. Their storage reservoirs stop the flow of rivers and often submerge towns, farms, and historic sites. They prevent fish migrations and change aquatic habitats essential for native species.
The tide may have turned, in fact, against dam building. In 1998 the Army Corps announced that it would no longer be building large dams. In the few remaining sites where dams might be built, public opposition is so great that getting approval for projects is unlikely. Instead, the new focus may be on removing existing dams and restoring natural habitats. In 1999 Bruce Babbitt, the then United States interior secretary, said, —Of the 75,000 large dams in the United States, most were built a long time ago and are now
obsolete
and unsafe. They were built with no consideration of the environmental costs. As operating licenses come up for renewal, dam removal and habitat restoration to original stream flows will be among the options considered.
The first active hydroelectric dam in the United States to be removed against the wishes of its owners was the 162-year-old Edwards Dam, on the Kennebec River in Augusta, Maine. For many years, the United States Fish and Wildlife Service had advocated the removal of this dam, which prevented migration of salmon, shad, sturgeon, and other fish species up the river. In a precedent-setting decision, the Federal Energy Regulatory Commission ordered the dam removed after concluding that the environmental and economic benefits of a free-flowing river outweighed the electricity generated by the dam. In July 1999 the dam was removed and restoration work began on wetlands and stream banks long underwater.
The next dams likely to be taken down are the Elwha and Glines Dams on the Elwha River in Olympic National Park in the state of Washington. Built nearly a century ago to provide power to lumber and paper mills in the town of Port Angeles, these dams blocked access to upstream spawning beds for six species of salmon on what once was one of the most productive salmon rivers in the world. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there now are only concrete walls holding back still water and deep beds of muddy deposits. Removing the mud, uncovering gravel beds where fish spawn, and finding suitable salmon types to rebuild the population is a daunting task. Congress will have to appropriate somewhere around $300 to $400 million to remove these two relatively small dams and rehabilitate the area.
Environmental groups, encouraged by these examples, have begun to talk about much more ambitious projects. Four giant dams on the Snake River in Washington State, for example, might be removed to restore salmon and steelhead fish runs to the headwaters of the Columbia River. The Hetch Hetchy Dam in Yosemite National Park might be taken down to reveal what John Muir, the founder of the prestigious environmental organization Sierra Club, called a valley—just as beautiful and worthy of preservation as the majestic Yosemite. Some groups have even suggested removing the Glen Canyon Dam on the Colorado River. In each of these cases, powerful interests stand in opposition. These dams generate low-cost electricity and store water that is needed for agriculture and industry. Local economies, domestic water supplies, and certain types of recreation all would be severely impacted by destruction of these dams.
According to Paragraph 3, why did the United States Fish and Wildlife Service want the Edwards Dam removed?
选项
A、Because the age of the dam made it unsafe.
B、Because the dam was negatively affecting various species of fish.
C、Because the dam had caused wetlands to form.
D、Because the dam no longer provided economic benefits.
答案
B
解析
关于美国鱼类和野生动物管理局拆除爱德华兹大坝的原因,第3段第2句提到这座大坝阻碍了鲑鱼、鲥鱼、鲟鱼和其他鱼类洄游至上游,因此多年来,美国鱼类和野生动物管理局一直主张拆除这座大坝,B项的表达与此相符。A项“大坝历史悠久,安全性降低”、C项“大坝促成湿地的形成”,以及D项“大坝不再能够产生经济效益”均不是美国鱼类和野生动物管理局主张拆除这座大坝的原因。
转载请注明原文地址:https://kaotiyun.com/show/n7MO777K
本试题收录于:
CATTI二级笔译综合能力题库翻译专业资格(CATTI)分类
0
CATTI二级笔译综合能力
翻译专业资格(CATTI)
相关试题推荐
Allthermalradiationfromaplanetarysurfaceabsorbedbyatmosphericgreenhousegasesisre-radiateddirectlybacktowardthe
Allthermalradiationfromaplanetarysurfaceabsorbedbyatmosphericgreenhousegasesisre-radiateddirectlybacktowardthe
Masstourismisaformoftourismthatinvolvestensofthousandsofpeoplegoingtothesameresortoftenatthesametimeofa
Touristsdon’thavetobookahotelreservationinadvance.
Accordingtothearticle,peoplenamedthisstuff"flammableice"because______
【L1】______and【L2】______affecthowpeoplevaluepersonalcontrolindecisionmaking,accordingtoanewstudyinBiologicalPsy
Thereportbelievesthatsomecompaniestendtofalsifyabloodtestresult.
ThefirstoutlineofTheAscentofManwaswritteninJuly1969andthelastfootoffilmwasshotinDecember1972.Anundertak
Sincethedawnofcivilization,peoplehavebeencuriousabouttheageofEarth.Inaddition,wehavenotbeensatisfiedinbein
Ittookfourdaystorecoverallthebodiesfromtheplanecrash.
随机试题
对人体的某一特性如体重、血压等,通过具体工具(体重计、血压计),获得具体的数值,如70kg、115/75mmHg的过程,称为()
(2009年10月)依照我国《海洋环境保护法》的规定,我国将海洋倾倒许可证分为____、_____、______。普通许可证特别许可证紧急许可证
沟通的关键是()。
甲首饰店是增值税一般纳税人。2018年11月采取“以旧换新”方式销售一批金项链。该批金项链含增值税售价为139200元,换回的旧项链作价127600元,甲首饰店实际收取差价款11600元。已知增值税税率为16%。甲首饰店当月该笔业务增值税销项税额为(
(2012年)2009年3月1日,甲房地产公司(简称甲公司)与乙建筑公司(简称乙公司)签订一份建筑工程承包合同,约定由乙公司承建甲公司开发的景明写字楼项目,工程价款5000万元,工期14个月。工程将要竣工时,甲公司因资金短缺,无力继续提供约定由其提供的部分
2008年1月10日,甲公司销售一批商品给乙公司,货款为4914万元(含增值税额)。合同约定,乙公司应于2008年4月10日前支付上述贷款。由于资金周转困难,乙公司到期不能偿付货款。经协商,甲公司与乙公司达成如下债务重组协议:乙公司以一批产品和一台生产经
下列曾提出过“教育遵循自然”的观点的教育家有()。
2009年上半年,我国国内生产总值为:2008年上半年,全社会固定资产投资同比增长:
TO:EventsStaffFROM:MarinellaGarnet,ProjectManagerSUBJECT:UpcomingSeminarDATE:September23Asannouncedattherecent
WhodidDrStewartreadapoemto?
最新回复
(
0
)