首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
London’s First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of £77 million. It
London’s First Light Rail System The Docklands Light Railway (DLR) took just three years to build at a cost of £77 million. It
admin
2009-06-15
55
问题
London’s First Light Rail System
The Docklands Light Railway (DLR) took just three years to build at a cost of £77 million. It is London’s first Light Rail System, but its route follows that of a number of older lines, which carried the nineteenth century railways through the crowded districts of the East End.
The section of the line from the Tower Gateway Station to Poplar follows the line of one of London’s earliest railways, the London & Blackwell (1840), a cable-drawn railway (later converted to steam) which carried passengers to steam ships at Blackwell Pier, and provided transport for the messengers and clerks who went backwards and forwards between the docks (码头) and the city every day.
From Poplar to Island Gardens, a new line crosses high above the dock waters, and then joins the old track of the Millwall Extension Railway, built to service the Millwall Docks (1868) and to provide transport for workers in the local factories. This line was horse-drawn for part of its mute, until the 1880s.
The Poplar to Stratford section of the DLR route was first developed by the North London Railway, built in the 1850s to link the West and East India Docks with the manufacturing districts of the Midlands and North of England. There were. major railway works and sidings (岔线) at Bow until recently.
The trains are automatically controlled from a central computer, which deals with all signaling and other safety factors, as well as adjusting speeds to keep within the timetable; on board each vehicle, Train Captains, who are also fully qualified drivers, are equipped with two-way radios to maintain contact with central control. There are passenger lifts, and self-service ticket machines, at every station.
选项
A、was constructed in the nineteenth century.
B、will be finished in three years’ time.
C、follows some of the original lines.
D、took three years longer than expected to complete.
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/pKhd777K
本试题收录于:
职称英语理工类C级题库职称英语分类
0
职称英语理工类C级
职称英语
相关试题推荐
CommonProblems,CommonSolutionsThechancesarethatyoumadeupyourmindaboutsmokingalongtimeago—anddecidedit’s
Domion’sPizza:TheHome-DeliveryLeaderDomino’sPizzaisthefastest-growingandsecond-largestpizza(烤比萨饼)chaininthe
Whatdomedicalresearchersusuallyusetomakeplacebopills?Placebosmaybeharmful,becausetheymaybeusedby______.
Thecourageousboyhasbeenthesubjectof(massive)mediacoverage.
NewChangesinAmericanLifeOnceitwaspossibletodefinemaleandfemaleroleseasilybythedivisionoflabor.Menworke
NewChangesinAmericanLifeOnceitwaspossibletodefinemaleandfemaleroleseasilybythedivisionoflabor.Menworke
IntheUS,aperson’scompanybuyshimorherhealthinsurance.AllemployeesintheUShavethesamekindofhealthinsurance.
TheHammersmithHospitalinWestLondon,homeoftheRoyalPost-graduateMedicalSchoolhasbeenthescene(发生地点)ofmanyinnovat
Recentpressureatworkmayaccountforhisbehavior.
FactsaboutStroke1Every45seconds,someoneinAmericahasastroke.Every3.1minutes,someonediesofone.Strokekilleda
随机试题
校准实验室对所有的校准都应具有并应用评定测量()的程序。
有关肠梗阻的说法下列选项中错误的是
受精卵在第3日分裂成桑葚胚的细胞个数为()。
监控中心的电源应按所在建筑物的最高负荷等级配置,且不低于()负荷,并应保证不间断供电。
关键事件法的特点是()。
项目组织规划过程的主要内容包括________。
比赛中运动员将铅球沿斜上方投掷出去,铅球离手后,在空中飞行过程中动能Ek随时间t的变化图像最接近的是()。
曲线y=x2,x=2,y=2,y=0所围成的图形的面积为().
(2009年单选19)下列关于没收财产刑的说法,正确的是()。
Readthearticlebelowaboutabookletpublishedbyabank.Foreachquestion31-40,writeonewordinCAPITALLETTERSonyourA
最新回复
(
0
)