Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
admin
2016-09-08
30
问题
Which Low Carbon Technology Is Now a Reality?
A)With fossil fuels expected to supply over 70% of the world’s energy needs by 2040, we face some urgent questions: where should efforts be focused in reducing greenhouse gas emissions? Which technologies hold the most promise? There are a range of low-carbon solutions and given the challenge, we will need them all. We hear a lot about the advances being made by refreshable sources of energy such as solar, wind and hydro-electricity and these are certainly valuable technologies in combating climate change. But how can we really make a major impact in reducing carbon emissions from large power plants and industrial facilities? Enter carbon capture and storage—or CCS—a technology that captures CO
2
from fossil fuel production and permanently stores it underground.
B)The aim is to prevent the release of large quantities of CO
2
into the atmosphere(from fossil fuel use in power generation and other industries). It is a potential means of relieving the contribution of fossil fuel emissions to global warming and ocean acidification(酸化). Although CO
2
has been injected into geological formations for several decades for various purposes, including enhanced oil recovery, the long term storage of CO
2
is a relatively new concept. The first commercial example was Weyburn in 2000. CCS can also be used to describe the scrubbing(涤气)of CO
2
from environmental air as a climate engineering technique.
C)In November 2014 the Global CCS Institute released its flagship(核心的)publication—the annual Global Status of CCS report. This comprehensive annual update is the prominent source of information on the development of CCS around the world. A lot of work went into updating information in the report, in cooperation with the CCS industry, as there had been quite significant changes to the CCS landscape in the preceding 12 months. This included the launch of a large-scale CCS project in the power sector and the beginning of construction of the world’s first large-scale CCS project in the iron and steel sector.
D)Large-scale CCS is now a reality in the power sector with the October 2014 launch of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project in Saskatchewan, Canada. Boundary Dam is the first commercial CCS plant in the power sector, removing 90 per cent of the CO
2
produced by electricity generation from lignite(褐煤)coal at Production Unit No. 3 of the SaskPower facility. The captured CO
2
is primarily used for enhanced oil recovery(EOR)at the nearby Weyburn oil field, although amounts are also to be stored in deep geological formations at the Aquistore site. The success of the Boundary Dam project and the progression of additional projects through planning and construction, indicates that CCS technologies for application in the power sector are "market ready".
E)The next 18 -24 months will see CCS be applied across a range of industries and storage types. A further two large-scale CCS power projects are in construction in the US—the Kemper County Energy Facility in Mississippi and the Petra Nova Carbon Capture Project in Texas. Both projects are expected to be operational in 2016. Also in the US, the Illinois Industrial CCS project planned for launch later this year will capture CO
2
from the Archer Daniels Midland corn-to-ethanol(乙醇)plant in Decatur, Illinois for storage in an onshore deep saline formation. The Abu Dhabi CCS project in the United Arab Emirates is under construction and from 2016 will provide the world’s first large-scale demonstration of CO
2
capture from iron and steel production.
F)In addition to the 22 large-scale CCS projects currently in operation or construction around the world, 14 projects are in advanced stages of planning, many of which are likely to be in a position to make a final investment decision over the coming year. Together this group of projects covers a range of applications for CCS and could extend to around ten in the number of large-scale CCS projects operating in the power sector by the end of the decade. Their progression to operation would add experience in the dedicated geological storage of CO
2
and see operational large-scale CCS activity extend to China for the first time.
G)2014 saw commercial application in the power sector become a reality and we can look forward to a further expansion across a diverse range of industries in the coming years. The Global CCS Institute continues to cover developments in CCS with up-to-date information, expert insights, workshops, media releases and online seminars. We struggle to make CCS industry information easily accessible and encourage you to engage with us via our website and regular publications.
H)For detailed information on large-scale CCS projects please visit our online Projects page, which you can browse or search for projects based on stage, region, industry or capture, transport and storage type. For the first time the Institute’s website contains project descriptions for around 40 lesser scale "remarkable" CCS projects, of which four Japanese "remarkable" CCS projects were the key focus of a chapter in the Global Status of CCS report. For ongoing expert information visit our Insights page, which is regularly updated with articles from experts in carbon capture and storage, public engagement, legal issues and policy developments.
I)To join in the discussion you can attend meetings and workshops around the world, and participate in online seminars where you will have the opportunity to listen to and ask questions of a range of experts. Visit our Events page to see upcoming meetings, conferences, workshops and seminars. Finally, for a range of up-to-date news and more detailed information, visit our news and publications sections. We look forward to covering this exciting period in the development of CCS and providing you with the latest information and important issues for the sector.
More than 70% of the energy demand all over the world is expected to be supplied by fossil fuels by 2040.
选项
答案
A
解析
转载请注明原文地址:https://kaotiyun.com/show/qPY7777K
0
大学英语四级
相关试题推荐
Weoftenpassonlittlebitsofinformationtoourchildren,notknowingiftheyaretrue,andonlybecausetheywere【B1】_______
Today,studentswhowanttolearnEnglishintheUShaveawidechoiceofcoursesandinstitutionsto【B1】_______.And,becauset
Today,studentswhowanttolearnEnglishintheUShaveawidechoiceofcoursesandinstitutionsto【B1】_______.And,becauset
A、Hemustmeethisteacher.B、Hemustattendaclass.C、Hemustgooutwithhisgirlfriend.D、Hemuststayatschooltofinishh
A、There’sapaperbythedoor.B、Thepapermusthaveblownaway.C、Heshouldlookfurtherunderthedesk.D、Hecanbuyanothero
ThefloodofwomenintothejobmarketboostedeconomicgrowthandchangedU.S.societyinmanyways.Manyin-homejobsthatuse
TheArtofFriendshipA)OneeveningafewyearsagoIfoundmyselfinananxiety.Nothingwasreallywrong—myfamilyandIwer
A、Theteacherpostponedthemeetingthisafternoon.B、Therewon’tbeatestthisafternoon.C、Thestudentswillbeattendingthe
A、Sixtimes.B、Fivetimes.C、Threetimes.D、Twotimes.B细节题。文中明确提到,声音在水中传播的速度是在空气中传播速度的五倍,故答案为B)。
A、Theyshowpeopleanotherfantasyworld.B、Theyrevealtheveryrealityofmodernsociety.C、Theyhelpimprovetheabilityofl
随机试题
河床相沉积岩石成分有什么特征?
A、蚀疮去腐B、去积杀虫C、祛痰止咳D、消肿散结E、活血化瘀巴豆除泻水逐饮外,又能()。
溶血性链球菌感染时脓液特点是
关于管片拼装顺序以下说法错误的是()。
关于个人汽车消费贷款,下列说法中正确的是()。
会计档案的保管期限可以分为()。
绿色贸易壁垒在近十年的时间里被使用的频率越来越高,成为继反倾销措施以后的又一重要的贸易措施。在全球4917中产品中,涉及纺织、成衣、化妆品、日用品、玩具、家具和家用电器等几千种商品。目前国际上使用的绿色贸易壁垒形式主要有()。
一个学校在新学年招收了120名学生而使在校生总数增加了15%,新学年在校生总数为多少?( )
性格的特征主要有()。
某行政单位希望将位于单位内部信息系统中的新闻、信息等发布到互联网上,并实现一部分网上办公能力。对于这种应用集成需求,最适合的集成方式是(30)。
最新回复
(
0
)