首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Part Ⅱ Reading Comprehension (Skimming and Scanning) Directions: In this part, you will have 15 minutes to go over the passage q
Part Ⅱ Reading Comprehension (Skimming and Scanning) Directions: In this part, you will have 15 minutes to go over the passage q
admin
2010-09-25
25
问题
Part Ⅱ Reading Comprehension (Skimming and Scanning)
Directions: In this part, you will have 15 minutes to go over the passage quickly and answer the questions on Answer Sheet 1. For questions 1-7, choose the best answer from the four choices marked [A], [B], [C] and [D]. For questions 8-10, complete the sentences with the information given in the passage.
Hydroelectric Power
Hydroelectric power is America’s leading renewable energy resource. Of all the renewable power sources, it’s the most reliable, efficient and economical. Water is needed to run a hydroelectric generating unit. It’s held in a reservoir or lake behind a dam, and the force of the water being released from the reservoir through the dam spins the blades of a turbine. The turbine is connected to the generator that produces electricity. After passing through the turbine, the water re-enters the river on the downstream side of the dam.
Hydroelectric plants convert the kinetic energy within falling water into electricity. The energy in moving water is produced in the sun, and consequently is continually being renewed. The energy in sunlight evaporates water from the seas and deposits it on land as rain. Land elevation differences result in rainfall runoff, and permit some of the original solar energy to be harnessed as hydroelectric power. Hydroelectric power is at present the earth’s chief renewable electricity source, generating 6% of global energy and about 15% of worldwide electricity. Hydroelectric power in Canada is plentiful and provides 60% of their electrical requirements. Usually regarded as an inexpensive and clean source of electricity, most big hydroelectric projects being planned today are facing a great deal of hostility from environmental groups and local people.
The earliest recorded use of water power was a clock, constructed around 250 BC. Since then, people have used falling water to supply power for grain and saw mills, as well as a host of other uses. The earliest use of flowing water to generate electricity was a waterwheel on the Fox River in Wisconsin in 1882.
The first hydroelectric power plants were much more dependable and efficient than the plants of the day that were fired by fossil fuels. This led to a rise in number of small to medium sized hydroelectric generating plants located wherever there was an adequate supply of falling water and a need for electricity. As demand for electricity soared in the middle years of the 20th century, and the effectiveness of coal and oil power plants improved, small hydro plants became less popular. The majority of new hydroelectric developments were focused on giant mega-projects.
Hydroelectric plants harness energy by passing flowing water through a turbine. The water turbine rotation is delivered to a generator, which generates electricity. The quantity of electricity that can be produced at a hydroelectric plant relies upon two variables. These variables are (1) the vertical distance that the water falls, called the "head", and (2) the flow rate, calculated as volume over time. The amount of electricity that is produced is thus proportional to the head product and the flow rate.
So, hydroelectric power stations can normally be separated into two kinds. The most widespread are "high head" plants and usually employ a dam to stock up water at an increased height. They also store water at times of rain and discharge it during dry times. This results in reliable and consistent electricity generation, capable of meeting demand since flow can be rapidly altered. At times of excess electrical system capacity, usually available at night, these plants can also pump water from one reservoir to another at a greater height. When there is peak electrical demand, the higher reservoir releases water through the turbines to the lower reservoir.
"Low head" hydroelectric plants usually exploit heads of just a few meters or less. These types of power station use a weir or low dam to channel water, or no dam at all and merely use the river flow. Unfortunately their electricity production capacity fluctuates with seasonal water flow in a river.
Around 2003 people believed almost universally that hydroelectric power was an environmentally safe and clean means of generating electricity. Hydroelectric stations do not release any of the usual atmospheric pollutants emitted by power plants fuelled by fossil fuels so they do not add to global warming or acid rain. Nevertheless, recent studies of the larger reservoirs formed behind dams have implied that decomposing flooded vegetation could give off greenhouse gases equal to those from other electricity sources.
The clearest result of hydroelectric dams is the flooding of huge areas of land. The reservoirs built can be exceptionally big and they have often flooded the lands of indigenous peoples and destroyed their way of life. Numerous rare ecosystems are also endangered by hydroelectric power plant development.
Damming rivers may also change the quantity and quality of water in the rivers below the dams, as well as stopping fish migrating upstream to spawn. In addition, silt, usually taken downstream to the lower parts of a river, is caught by a dam and so the river downstream loses the silt that should fertilize the river’s flood plains during high water periods.
Theoretical global hydroelectric power is approximately four times larger than the amount that has been taken advantage of today. Most of the residual hydro potential left in the world can be found in African and Asian developing countries. Exploiting this resource would involve an investment of billions of dollars, since hydroelectric plants normally have very high building costs. Low head hydro capacity facilities on small scales will probably increase in the future as low head turbine research, and the standardization of turbine production, reduce the costs of low head hydroelectric power production. New systems of control and improvements in turbines could lead in the future to more electricity created from present facilities. In addition, in the 1950’s and 60’s when oil and coal prices were very low, lots of smaller hydroelectric plants were closed down. Future increases in the prices of fuel could lead to these places being renovated.
How is the flow rate of a hydroelectric power station quantified?
选项
A、The depth of the water.
B、Volume over time.
C、Speed over time.
D、The width of the water.
答案
B
解析
本题考查水流速的计算方式,故将答案出处定位到第五段。根据上题的分析可知,决定发电站的发电量有两个因素,其中一个是the flow rate,并对其进行了解释:calculated as volume over time,明确指出水流速度通过水流量除以时间(volume over time)来计算,其中quantified≈calculated,故B项为答案。
转载请注明原文地址:https://kaotiyun.com/show/rxz7777K
0
大学英语六级
相关试题推荐
Educationisoneofthekeywordsofourtime.Amanwithoutaneducation,manyofusbelieve,isanunfortunatevictimofadver
A、Thesmalleritis,theclevereritis.B、Thesmalleritis,thelessitcosts.C、It’ssmall,butstoresalotofinformation.
FourMinutesthatGetYouHiredBayStateralwayswantstobeateacher.Withthehelpoffriendswhoteachatschool,shel
BlowingHotandColdClimatechangemaybeslowanduncertain,butthatisnoexcuseforinaction.Onereasonwhyuncertaint
ScientistssaythewarmingoftheEarth’satmospherehasbeguntoaffectplantandanimallifearoundtheworld.Scientistsfrom
Ifthewholeframeworkofthethesishadbeendesignedbeforehand,____________________________(就会节省很多时间和精力)
Preparingyoungpeopletobecitizensrequiresustoembraceciviclearningasacoreproposeofeducation.Lastmonth,thousand
A、Toprovidereaderswithcomfortablereadingrooms.B、Toprovideadultswithopportunitiesoffurthereducation.C、Tocollecta
A、HeprovidedWashingtonwithalotofmoney.B、HepersuadedFrancetosupportWashington.C、HeservedasageneralinWashingto
A、Asurveywasconductedofmen.B、Aquestion"whodoesthehousework"wasaskedofpeople.C、Acommissionwasestablishedtoin
随机试题
实验调查发现,认为自己有网瘾的同学,上网时间显著高于否认有网瘾的同学,他们平均每周上网时间为13.3小时,比后者多5.4小时。研究者据此认为,一旦认为自己有网瘾,上网时间就会变长。以下哪项如果为真,最能削弱上述观点?
硫酸铈Ce(SO4)2溶液呈橙黄色,Ce3+无色,所以滴定无色溶液时,可用自身做指示剂,并且灵敏度很高。
海洋测量定位中,双曲线法属于()定位方法。
控股股东不履行认配股份的承诺,或者代销期届满,原股东认购股票的数量未达到拟配售数量( )的,发行人应当按照发行价并加算银行同期存款利息返还已经认购的股东。
《中华人民共和国教师法》明确规定:教师进行教育教学活动,开展教育教学改革和实验,从事科学研究,是每个教师的()。
搜查妇女的身体,()由女侦查人员进行。
下列关于法人解散的表示,正确的是()
Iaskedsuccessfulpeoplewhatthesecretoftheirsuccesswas.I【B1】______anearlydiscussionwithavicepresidentofalarge
Rola,a16-year-oldgirl,isexcited,yetscared,asshebeginsherfirstyearofcollegeintheUnitedStates.Sheattributesh
A、Usesomespecialshampoo.B、Wearawig.C、Don’ttrytocombhairoverthebaldorthinpatch.D、Gotothedoctorforadvice.
最新回复
(
0
)