首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
How many are there quality control inspection points. What do you check for at the final quality control stage?
How many are there quality control inspection points. What do you check for at the final quality control stage?
admin
2010-08-20
51
问题
How many are there quality control inspection points.
What do you check for at the final quality control stage?
M: Could you tell me a bit about quality control at the factory?
W: Well, there are four main quality control inspection points. We begin by visiting our suppliers to make sure we are happy with their quality control. Next, we inspect all goods on arrival at our factory and the third inspection point is during production. And the last stage is chemical analysis of our finished goods.
M: And what do you look for at each of the four inspection points?
W: Well each stage is different. With our suppliers, for instance, we inspect their quality control processes and, even more importantly,their factory hygiene. If we’re not happy with their hygiene, we’ll cancel the supply contract. As the goods is in stage, we make sure that order quantities are correct and the quality is OK. We also check the transport packaging. If the packing is damaged, the warehouse shelf-life can be reduced.
M: And what quality checks do you run during production?
W: We take samples to check there isn’t too much cooking oil on the snack and that each snack has the minimum amount of flavouring. We also check the size of the snacks and their crispness.If the snacks are too oily, they go soft.
M: So that leaves the finished goods. What do you check for at the final quality control stage?
W: We check individual bags to make sure that the packet weight is above the acceptable minimum and that the packet is sealed properly. We also cheek the taste.
M: And how do you do that?
W: Well, we eat them. How else? We also do chemical analysis to check things like fat levels and other information that we have to put on the packets.
选项
A、Check weight.
B、Check package.
C、Check weight, package and taste.
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/s9EO777K
本试题收录于:
BEC初级听力题库BEC商务英语分类
0
BEC初级听力
BEC商务英语
相关试题推荐
•Youwillhearanotherfiveshortpieces.•Eachspeakeristalkingabouttheeffectsofanewdevelopmentintheworkplace.•Wri
•Lookattheformbelow.•Youwillhearamanplacinganorderforsomeofficestationery.ORDERFORMOr
•Lookatthenotebelow.•Youwillhearacalltorentanapartment.HiringRegistrationDate:5thJan.T
•Lookatthenotebelow.•Youwillhearacalltorentanapartment.HiringRegistrationDate:5thJan.T
•Lookatthenotesbelow.•Youwillhearawomanphoningtochecktheproductionofsomephotocopiers.
MAKINGPRODUCTPROMOTIONLindabroughtsamplesof(5)producttoshowMr.Evens.Theproductisshapedunder(6)and
FlightsInformation1.BA027at21:30arrives(9)at17:40,KLM221at19:10toManila.2.Very(10)transfertime.3.Flig
Lookatthenotebelow.Youwillhearamancallingtoconfirmtheflight.FLIGHTRESERVATIONFORMName:Den
Fromwhichplatformdoesthetrainleave?Whatwerethesaleslikeinthepastthreeyears?
随机试题
G公司拟新建一条生产线,经调研和预算,该企业的经济寿命为10年,新建厂房投资额为200万元,设备投资额为600万元,流动资产投资额为120万元,公司决定,该投资形成的固定资产采用直线法计提折旧,无残值,该生产线建成投产后的第2年至第10年,每年可实现200
危重患儿抢救时,输液量过多、速度过快可致:()
根据相关规定,高级管理人员、基金管理公司基金经理应当维护所管理基金的合法利益,在基金份额持有人的利益与基金管理公司、基金托管银行的利益发生冲突时,应当坚持()利益优先的原则。
下列行为中,不征收或免征土地增值税的有()。
从理论上讲,工资上涨过快容易导致( )通货膨胀。
某公司于2004年12月31日以80000元购入设备一台,该项设备预计使用寿命为5年,预计净残值为4000元,采用年限平均法提取折旧。2008年6月30日,该公司发现该设备所包含的经济利益的预期实现方式有重大改变,决定自2008年7月1日起,将折旧方法改为
文房四宝中的善琏湖笔的类型有()。
波普艺术是流行艺术的简称,又称新写实主义,始于英国。()
______用以说明公文的印发传达范围或使用时需注意的事项( )。
甲乙二人合谋抢夺财物。一日,甲向一坐在汽车内的妇女假装问路,乙乘该妇女不备,拉开车门,从其手中抢过提包就跑,甲也随即与乙一同逃跑,当场被群众抓获。群众从甲、乙二人身上各搜出一把匕首。甲乙二人的行为构成()
最新回复
(
0
)