The construction of the second-ring viaduct has been ______ for three months.

admin2013-11-10  27

问题 The construction of the second-ring viaduct has been ______ for three months.

选项 A、on the way
B、under way
C、at the way
D、to the way

答案B

解析 题意为:二环线高架桥的建设已经进行3个月了。此题考查词组搭配。under way意思是“进行中,在行进”;on the way意思是“在途中,接近”。C和D不是固定搭配。
转载请注明原文地址:https://kaotiyun.com/show/sdGK777K
0

最新回复(0)