首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost st
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost st
admin
2016-06-22
59
问题
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels of crude oil can be pumped through it daily.
Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permanently frozen ground. A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $ 8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagements, and even theft, the Alaska pipeline has been completed and is operating.
The word "it"(Sentence 3, Para. 1)refers to______.
选项
A、pipeline
B、ocean
C、state
D、village
答案
A
解析
本段后面的几个it指的是管道,这可以从第1句的“The Alaska pipelinestarts at the frozen edge of the Arctic Ocean”推出。因此A项正确。
转载请注明原文地址:https://kaotiyun.com/show/t0Qi777K
0
在职申硕(同等学力)英语
相关试题推荐
ChildrenintheUnitedStatesareexposedtomanyinfluences______thoseoftheirfamilies.
Shortageoflandandfundingisblamedforthecity’s______greenspace.
Theenginewas______byatreelyingacrosstheline.
He______allhisunfinishedmanuscriptstohiscolleaguesinthelaboratorybeforehewenttoFrance.
IsthereenoughoilbeneaththeArcticNationalWildlifeRefuge(ANWR)tohelpsecureAmerica’senergyfuture?PresidentBushcer
SusceptiblefromwhichA.whenremoved(62)______ahalffinishedhomeB.duringaperiodofinfancyin(63)______vaguerinstinct
SusceptiblefromwhichA.whenremoved(62)______ahalffinishedhomeB.duringaperiodofinfancyin(63)______vaguerinstinct
OnSeptember7,2001,a68-year-oldwomaninStrasbourg,France,hadhergallbladder(胆囊)removedbysurgeonsoperatingviacompu
随机试题
马克.吐温的作品中,叙述金钱打败道德的故事的是()
患者,男性,28岁。幼时曾患百日咳。咳嗽、咳痰3个月,近日咳大量脓痰今日早晨突然咯血3口。诊断为支气管扩张,一旦出现大咳血,处理的重要措施是
考评员在考核电磁室主任小黄时问:“当需依法进行检定的计量器具没有计量检定规程时,你们如何进行‘检定’”?小黄回答说:“通常我们参考相应的其他技术规范如产品标准来进行检定。”
陈某购买了江某的一套学区房,双方为避税,在办理相关手续时隐瞒了成交价格,后被有关部门要求房屋价格进行评估。陈某委托其表弟赵某所在的甲房地产估价机构做课税评估。赵某选取了相邻区位但不属于学区房的成交案例进行评估,助陈某、江某偷税5万余元。陈某因无力清偿到期住
成本的审查主要审查可研报告中成本的计算是否合规、合理,下面是对某加工企业进行成本审查时的计算,直接材料+直接工资+其他直接费用+制造费(包括折旧费、修理费、其他费用)应为()。
下列关于抵押物处理表述错误的是()。
某非政府的民间金融组织确定的利率属于()。
诸如NBA、GDP这样字母词已成为汉语语言表达的一部分,偶然蹦出几个,不代表汉语表达已经被_________,只是我们在寻找一种更_________、准确的表达方式而已。填入划横线部分最恰当的一项是:
漫画演讲题:漫画中画有一只小鸟,它站在树桩上,幻想自己站在郁郁葱葱的树上,画中有个写了一半的题目“曾经()”。请补充括号内容作一演讲。
(字处理题)财务部助理小王需要协助公司管理层制作本年度的年度报告,请你按照如下需求完成制作工作:将文档中所有含有绿色标记的标题文字段落应用“报告标题1”样式。
最新回复
(
0
)