首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
- Your team won a big construction contract for your company last month. Your Managing Director has asked you to prepare a repor
- Your team won a big construction contract for your company last month. Your Managing Director has asked you to prepare a repor
admin
2016-09-24
20
问题
- Your team won a big construction contract for your company last month. Your Managing Director has asked you to prepare a report on your achievement.
- Write a report to the Managing Director:
- saying what you have prepared for the bidding
- outlining your plans for future work
- telling what kind of help you may need from the company.
选项
答案
Report on our achievement in the construction bidding The report sets out to describe our success in winning the big construction contract last month as well as plans for future work of the construction. In the preparation for bidding for the construction, we made a large amount of investigations, including the construction site, the distribution of various wires in the area as well as the cost and profits of the whole project. Based on all the findings and analysis of the investigation, we completed our tender, engineering drawing and estimated budget. It contained all the excellent features of our competitors and excelled all of them in the aspect of daylight and heat design, which enabled us to win the contract. As for future work, several tasks as follows should be carried out. In the first place, the construction site must be cleaned and leveled off in two weeks. Meantime, designs of the project should be reexamined by another group of engineers in case there should be any inappropriate mistakes. Synchronised with that, relevant equipments and materials for construction must be purchased, inspected and safely kept in the construction site for the course of construction. The preparation and construction office is responsible for these two parts. Above all, temporary water and electricity must be switched in immediately. Construction work will get started once preparation work gets finished. Since it’s a very big project and its success is essential to our company, adequate provision of personnel and funds must be assured. Specific demands are listed in the documents appended.
解析
题目要求写一份报告。根据题目要求可知,这是一份写给总经理的关于赢得建设工程投标的报告。要求首先说明为竞标所做的准备,接下来说明将来的工作计划,最后说明需要公司提供的帮助。写作时应注意条理清晰,层次分明,注意前后文衔接及语意逻辑关系,同时应注意避免语法、拼写等错误。
转载请注明原文地址:https://kaotiyun.com/show/uLKd777K
本试题收录于:
BEC高级写作题库BEC商务英语分类
0
BEC高级写作
BEC商务英语
相关试题推荐
Accordingtothespeaker,whowouldmostbenefitfrommuItitasking?
Whathashappenedtothecompany’ssalessincelastyear?
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Whendidthemanstartworkingatthiscompany?
Howmanylevelsarereservedforemployeeparking?
A、 B、 C、 A(B)中的presentation是为了让人与题干中的present相混淆而设的陷阱。(C)可以在只提新来的职员(newemployee)时选为答案。
WhatwilltakeplaceonFriday?
Task7TeamBuildingYourcompanyisabouttotakeoveranothercompanyandiskeentoencouragethestafffrombothcompaniest
•Youwillhearfivedifferentpeopletalkingaboutaspecialtrainingprogrammefortheircompany.•Foreachextractthereare
•YouwillheararadiointerviewbetweenawomanjournalistandMichaelDell,ChairmanofDellInc.andhisnewCEO,KevinRolli
随机试题
领导行为理论包括
下列极限存在的是()
设z是x,y的函数,且xy=xf(z)+yφ(z),xfˊ(z)+yφˊ(z)≠0,证明:
洋地黄中毒特征性的心电图表现为
按照法律体系的渊源划分,下列选项不属于招标采购法律体系的是()。
—Thisisareallylivelyparty.There’sagreatatmosphere,isn’tthere?—______.Thehostsknowhowtohostaparty.
海洋能利用中,发展最早、技术比较成熟的发电技术是()。
Managingglobalorganizationshasbeenabusinesschallengeforcenturies.Butthenatureofthetaskischangingwiththeaccel
软件设计中划分模块的一个准则是()。
—YouwillhearaninterviewwithCarolVogel,thepresidentofTelekom.Sheistalkingabouttheircurrentsituationandfuture
最新回复
(
0
)