首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
admin
2022-09-09
40
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________, so are expensive
Need to use sunlight to prevent local plants from【L33】________Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________for the roof)
Building and maintenance done by local craftsmen Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________have greater opportunities
More children are educated
【L37】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low
. In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter
, which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter
. And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful
. The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap
. Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering
. In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone
, there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on
. They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities
. They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
solar
解析
空格后为energy,推测应填入某种能源。录音原文中的run on…alone是题目reties solely on…的同义替换,故空格处填入solar。
转载请注明原文地址:https://kaotiyun.com/show/vBnD777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
以下选项中叙述正确的是
设有定义:structcomplex{intreal,unreal;}data1={1,8},data2;则以下赋值语句中错误的是
使用VC6打开考生文件夹下的工程RevProj7。此工程包含一个源程序文件RevMain6.cpp,但该程序运行有问题。请改正主函数中的错误,使程序的输出结果是:MyNumber=0MyNumber=1MyNumber=2源
使用VC6打开考生文件夹下的工程test33_1,此工程包含一个源程序文件test33_1.cpp,但该程序运行有问题,请改正程序中的错误,使该程序的输出结果为:Number=1,2,3sum=16源程序文件test33_1.cpp
A、交B、差C、并D、选择A用于查询的3个操作无法用传统的集合运算表示,引入的运算为投影运算、选择运算、笛卡尔积。常用的扩充运算有交、除、连接及自然连接等。选择,从关系中找出满足给定条件的元组的操作称为选择,题目中无给定条件,故D选项错误。差:R-
在考生文件夹下,存在两个数据库文件和一个照片文件,数据库文件名分别为“samp1.accdb”和“dResearch.accdb”,照片文件名为“照片.bmp”。请按以下操作要求,完成表的建立和修改。(1)将考生文件夹下“dResearch.ac
Itisoftendifficultforamantobequitesurewhattaxheoughttopaytothegovernmentbecauseitdependsonsomanydiffer
John:Mary,I’mlookingforsomething【K1】________(interest)toread.Anysuggestions?Mary:Icanrecommend(推荐)AllJoya
Whereisthetalktakingplace?
A、ASuperviseapprentice.B、Writereferenceletters.C、Keeprecordsandcarryoutplans.D、Identifypotentialtalents.CMissCha
随机试题
备课环节是上好课的先决条件,备课时教师应把全部精力放在钻研教材上。
报考博士生的条件应是最近两年毕业的研究生,思想进步,业务优秀,身体健康,年龄一般不超过四十岁,_________。填入划线部分最恰当的一项是()。
曲线y=x+的拐点是______.
通货膨胀的成因包括()。
基金托管人内部控制的内容主要包括( )等。
人们习惯上将1997年以前设立的基金称为“老基金”。老基金存在的问题主要表现在()。
X公司2000年12月投入使用一项固定资产,账面原价为800000元,预计使用年限为5年,预计净残值为50000元,按双倍余额递减法计提折旧;2003年底检查该项固定资产,首次计提了减值准备40000元,并预计其尚可使用年限为2年,预计净残值为20000
汽车经销商的欺诈行为主要包括()。
下面关于PCCPU的叙述中,不正确的是(61)。
InJanuary1989,theCommunityofEuropeanRailwayspresentedtheirproposalforahigh-speedpan-Europeantrainnetwork【B1】____
最新回复
(
0
)