首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The concept of obtaining fresh water from icebergs that are towed to populated regions ot the world was once treated as a joke m
The concept of obtaining fresh water from icebergs that are towed to populated regions ot the world was once treated as a joke m
admin
2009-06-24
58
问题
The concept of obtaining fresh water from icebergs that are towed to populated regions ot the world was once treated as a joke more appropriate to cartoons than real life. But now it is being considered quite seriously by many nations, especially since scientists have warned that the human race will outgrow its fresh water supply faster than it runs out of food.
Glaciers are a possible source of fresh water that have been overlooked until recently. Three quarters of the Earth’s fresh water supply is still tied up in glacial ice, a reservoir of untapped fresh water so immense that it could sustain all the rivers of the world for 1,000 years. Floating on the oceans every year are 7,659 trillion metric tons of ice encased in 10,000 icebergs that break away from the polar ice caps, more than ninety percent of them from Antarctica.
Huge glaciers that stretch over the shallow continental shelf give birth to icebergs throughout the year. Icebergs are not like sea ice, which is formed when the sea itself freezes; rather, they are formed entirely on land, breaking off when glaciers spread over the sea. As they drift away from the polar region, icebergs sometimes move mysteriously in a direction opposite to the wind, pulled by subsurface currents. Because they melt more slowly than smaller pieces of ice, icebergs have been known to drift as far north as 35 degrees south of the equator in the Atlantic Ocean. To corral them and steer them to parts of the world where they are needed would not be too difficult.
The difficulty arises in other technical matters, such as the prevention of rapid melting in warmer climates and the funneling of fresh water to shore in great volume. But even if the icebergs lost half of their volume in towing, the water they could provide would be far cheaper than that produced by desalination, or removing salt from water.
选项
A、The movement of glaciers
B、Icebergs as a source of fresh water
C、Future water shortages
D、The future of the world’s rivers
答案
B
解析
转载请注明原文地址:https://kaotiyun.com/show/vqTd777K
本试题收录于:
公共英语五级笔试题库公共英语(PETS)分类
0
公共英语五级笔试
公共英语(PETS)
相关试题推荐
Ifyougotoanumberofdifferentshops,you’llfindgreatvariationofpriceforthesamearticles.
Huntingandfishingaremainlyfavoredbymen,youngandold,intheUS.Footballcanbeclassifiedasaspectatorsport.
Itcanbeinferredfromthefirstparagraphthat______.Theauthor’sattitudetowardswomenhavingacareeris______.
Heisplanninganothertourabroad,yethispassportwillcometoanendattheendofthismonth.
Thereportadvocatedsettingupdaytrainingcolleges.
AKeepingGoodRelationswithLocalBusinessmenBServiceProvidedbyLocalNewspapersCLargeCirculationoftheNationalNe
ResultingfromthebombingoftheWordTradeCenter,AmericansfearedthattheywouldbeattackedbythenationshostiletoAmer
TheBuildingofthePyramidsTheoldeststonebuildingsintheworldarethepyramids.【46】.Thereareovereightypercentof
TheAmericanIndustryAhistoryoflongandeffortlesssuccesscanbeadreadfulhandicap,but,ifproperlyhandled,itmay
Thetrampwaslockedinthestore______.
随机试题
A.20~36GyB.30~35GyC.40~450yD.50~55GyE.60Gy早期胃黏膜相关组织淋巴瘤放疗剂量
A.乙酰胺B.纳洛酮C.亚甲蓝(美蓝)D.维生素K1E.阿托品下列中毒酒精中毒的特效解毒剂是
关于脓肿切开引流,错误的是
下列属于X线发生装置部分的是
最常用的给药途径是()。
项目进度计划中的建设工期是指()。
【背景资料】某施工单位承包某工程项目,甲乙双方签定的关于工程价款的合同内容有:1.建筑安装工程造价660万元,建筑材料及设备费占施工产值的比重为60%;2.工程预付款为建筑安装工程造价的20%。工程实施后,工程预付款从未施工工
变形缝的种类不包括()。
SuriveintheGlobalEconomicErisisAboutone-thirdofAmericanswhoqualifyforpublicassistancehaven’tsignedup.That
有三个关系R、S和T如下:则由关系R和S得到关系T的操作是
最新回复
(
0
)