A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing swit

admin2009-05-19  38

问题 A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).

选项 A、You must set each end of the trunk line to IEEE 802.1e encapsulation.
B、You must set the same VTP management domain name on both switches.
C、You must set all ports on the two switches as access ports.
D、You must configure one of the switches as a VTP server.
E、You must use a rollover cable to connect the two switches.

答案B,D

解析 Explanation:
The following describes what is needed in order to correctly set up VTP:


Incorrect Answers:
A. The encapsulation can be either ISL or 802.1Q, and need to match at each end of the trunk.

C. Ports must only be assigned to VLANS. Once that is done and the trunk is up and running, the VLAN information will be passed between the switches.

E. A regular CAT5 cable is used to connect the switches, assuming 10/100 Ethernet is used.
转载请注明原文地址:https://kaotiyun.com/show/wMhZ777K
0

最新回复(0)