首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Wolfe Constructions 121 Fifteenth Street Melbourne 200430 88880000 http: // www. Wolfeco
Wolfe Constructions 121 Fifteenth Street Melbourne 200430 88880000 http: // www. Wolfeco
admin
2011-06-01
70
问题
Wolfe Constructions
121 Fifteenth Street Melbourne 200430
88880000 http: // www. Wolfecon. com
Date: October 3, 2009
TO: Thomas S. Wolfe, President
From: Jack Evans, Project Manager
Subject: Progress on Hillcrest Apartments for September
Construction on the Hillcrest Apartment complex began on August 17 and fell behind schedule almost immediately because of the heavy rains that month.
Current Status
We have not been able to make up the time that we lost in August because of the continuing rain in September. Close supervision and some overtime have prevented us from falling farther behind. We are currently 18 days behind schedule, assuming crew size remains the same and overtime is limited to emergencies only. The foundation for the entire complex is complete. Framing on the 14# townhouse and the gym is complete, and the framers will begin work on the two-bedroom units on Monday, October 6. The electrical and plumbing subcontractors will also begin work on Monday.
Expected Progress
If the weather holds through the rest of this month, I expect to be finished with framing, roofing, and siding by mid-November. That will allow us to begin work on the interiors before the winter rains begin. One possible problem is the shortage of electricians. Our subcontractor has not been willing to consider providing an additional 5 workers to help us make up for some of the time we have lost. Delays on the electrical, will, of course, delay the finish work.
Nevertheless, when we move indoors, we should be able to reduce the total crew by more than 50 percent and begin using the framers and roofers on other projects.
Which of the following project had NOT been finished according to the report?
选项
A、Framing on the 14# townhouse
B、The foundation for the whole complex
C、The electrical and plumbing work
D、Framing on the gym
答案
C
解析
转载请注明原文地址:https://kaotiyun.com/show/xKid777K
本试题收录于:
托业阅读题库托业(TOEIC)分类
0
托业阅读
托业(TOEIC)
相关试题推荐
Nearlyeverybodyenjoyschicken,andthemostfamousnameinchickenisKentuckyFriedChicken.Mr.Sanders,themanwhostarted
A、Athome.B、HeiswatchingTV.C、Helikessports.A
MarawasgoingtostaywithherfriendFannyforthreedays.Aweekbeforehertrip,shecalledFannytotellherwhenthetrain
CometoHappyCamp(野营)WhereisHappyCamp?HappyCampisinabeautifulpartofHillLand.Itisjust1,000metersfrom
Manyyearsago,KarlBenzdevelopedacar,butbeforehecouldshowittothepublic,someonehadtodriveit.BertaBenzbeliev
Jane______beveryhealthybecauseshealwaysgoestoworkonabike.
Ifyou’reinvitedtoafriend’shomefordinner,keepinmindtheserulestobepolite.Firstofall,arriveontime(butnotea
Theylosttheirwayintheforest,and_______mademattersworsewasthatthenightbegantofall.
JRcompanyhasthreenewpiecesofequipmentintheprototypestagethat____theTX-3seriesalreadyinproduction.
CAUTIONVOLCANICFUMESAREHAZARDOUSTOYOURHEALTHANDCANBELIFE-THREATENINGVISITORSWITHBREATHINGANDHEARTPROBLEMS,
随机试题
带有电流截止负反馈环节的调速系统,为了使电流截止负反馈参与调节后机械特性曲线下垂段更陡一些,应把反馈取样电阻阻值选得()。
A.吡咯里西啶类生物碱B.简单茛菪碱类C.二萜类生物碱D.茛菪烷类生物碱E.吲哚类生物碱天仙子对平滑肌有明显的松弛作用的是()。
某患者,20年前患急性黄疸性肝炎,近5年右上腹胀痛诊为肝硬化,近2天出现大量腹水,在护理中不正确的是
生产计划的制订主要依据生产计划的要求、前期生产记录、计划调度以及产能而制订。()
知识产权保护涉及海关权利人和收发货人三方,但海关不应介入权利人与收发货人之间的民事纠纷。()
目前,国内期货公司除了可申请经营境内期货经纪业务外,还可以申请()。
西周以后,学校教育制度发展到比较完备的形式,建立了()的官学体系。
()是解决警力不足的人力资源。
在单位,你和小王是好朋友,现在由于你的升迁导致小王对你形同陌路,你怎么办?
He______betweenlifeanddeathforafewdaysbutthenhepulledthrough.
最新回复
(
0
)