首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
admin
2019-06-25
59
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1, 172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
According to the passage, which of the following statements is NOT TRUE?
选项
A、This pipeline will cross four states.
B、This pipeline is 1, 172 miles long.
C、All the protesters are from the Standing Rock Sioux.
D、Neither side of the dispute is willing to compromise.
答案
C
解析
综合分析题。根据第一段第一句可知A选项“这条输油管道将跨越四个州进行输送。”表述正确;根据第一段第三句可知B选项“立岩苏族决定要中止1172英里长的输油管道的修建”表述正确;根据第二段最后一句可知,此后,几千人,包括美国其他印第安部落的人们纷纷加入抗议大军,C选项表述错误;根据第一段最后一句可知D选项“双方都没有表示妥协的迹象。”表述正确。故选C。
转载请注明原文地址:https://kaotiyun.com/show/xq3O777K
0
成人本科学位英语
相关试题推荐
Thechildrenwillhaveto______theirplay-timehourswhenschoolopens.
ItwasabeautifulsummerdayandIwastakingawalkinthedowntownareaofMadrid.WhenIturnedastreet【C1】______Iheardth
Childrendon’t______understandwhattheyarereciting,butgraduallyitwillhaveanimpactontheirthinking.
"Equalpayforequalwork"isaphraseusedbytheAmericanwomenwhofeelthattheyareunfairlytreatedbysociety.Theysayi
—Didyoufindthemissingcoupleinthemountainyesterday?—No,butwe______togetintouchwiththemeversince.
CanyouimaginehowyouwouldfeelifyoufelldangerouslyillandcouldnotreachorCalladoctor?Millionsofpeople【C1】_____
Annacomplainedthehotelwastooexpensive.Ithad________her1,000dollarsforthenight.
DeathValleyisoneofthemostfamousdesertsintheUnitedStates,coveringawideareawithitsalkalisand.Almost20percen
We’relate.Iexpectthefilm______bythetimewegettothecinema.
随机试题
造影剂的第一次谐波反射,也称为
下列哪项不是导致骨折延迟愈合或不愈合的因素
诊断尿路感染下列哪项最有意义
治疗百日咳应首选
某市政建设集团公司第一项目经理部负责某污水处理厂工程施工,该项目主要包括泵站、集水池、输水管道等单位工程。集水池顶板采用一种刚问世的新型防护材料涂层,被涂层由项目部分包给一专业公司施工。施工过程中,项目部在工程量清单中没有围墙及厂区排水工程,遂向建设单位
软件是计算机系统的灵魂,计算机系统总体性能的高低,除了硬件系统性能之外,在很大程度上取决于软件系统的配置。()
虚有其表:表里如一:名副其实
就a,b的不同取值,讨论方程组解的情况.
既然不能去,你______早点儿告诉我。
【C1】______inawarispainfultoanynation.Nonationswantstosenditsyoungpeopletofightanddie.Itisevenworsewhent
最新回复
(
0
)