首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals Why is the class discussing the technical requirements of murals?
Art Murals Why is the class discussing the technical requirements of murals?
admin
2013-04-25
55
问题
Art Murals
Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:https://kaotiyun.com/show/ySyO777K
0
托福(TOEFL)
相关试题推荐
SECTION2Questions11-20Questions11-13Completethetablebelow.WriteNOMORETHANTHREEWORDSORANUMBERforeachanswer
SECTION1Questions1-10Questions1-4Choosethecorrectanswer,A,B,CorD.
SECTION4Questions31-40Questions31-35Completethenotesbelow.WriteNOMORETHANTHREEWORDSorANUMBERforeachanswer.
SECTION1Questions1-10Questions1-4Selectthecorrectanswerfromthechoicesgiven.WriteA,B,CorDonyouranswershe
PrairieDogbarkshave______meanings.【35】
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoQuestions11-15.Essential
随机试题
()更换法兰垫片时,应准备合适的新垫片,250mm、300mm扳手各一把,500mm撬杠、钢锯及钢锯条、600mm管钳、棉纱、汽油、黄油。
关于酶化学修饰,正确的描述是
华支睾吸虫成虫形态像什么
肱骨中、下1/3骨折,最易发生的并发症是
以下哪项属于“以疾病为中心的护理”阶段的特点
学与教相互作用的过程是一个系统过程,该过程包括教师和学生两个要素。()
()根据深度知觉的相对高度线索,在其他条件相等时,视野中两个物体相对位置较低的那一个,就显得远些,较高的那一个,显得近些。
半导体存储器从器件原理的角度可分为______和______。
数据结构分为逻辑结构和存储结构,线性链表属于______。
有三个关系R、S和T如下:由关系R和S通过运算得到关系T,则所使用的运算为( )。
最新回复
(
0
)