首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals Why is the class discussing the technical requirements of murals?
Art Murals Why is the class discussing the technical requirements of murals?
admin
2013-04-25
61
问题
Art Murals
Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:https://kaotiyun.com/show/ySyO777K
0
托福(TOEFL)
相关试题推荐
PrairieDogbarkshave______meanings.【34】
Completethenotesbelow.WriteONEWORDAND/ORANUMBERforeachanswer.Requirements:GoodliftaccessLargel
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Choosethecorrectletter,A,BorC.Grace’sCreekActivityCampOnebuildinghasnotbeendecidedyet,butwillprobablybe
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoQuestions11-15.Essential
conversation本题询问该项目的工作内容。录音原文中的assistingwith是题目helpingwith的同义替换。英语教学项目的主要任务是帮助提高当地人说英语(Englishconversation)的能力,故空格处填入conversa
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
随机试题
白喉毒素抑制真核生物蛋白质合成过程,其修饰的因子是
正常情况下,心脏的起搏点是
下列选项中,属于一级重大危险源的是()。
环境保护“三同时”制度,是指建设项目需要配套建设的(),必须与主体工程同时设计、同时施工、同时投产使用。
进出口货物完税后,由于海关方面的原因造成的少征或者漏征税款,海关可以自缴纳税款或者货物进口之日起3年内,向收发货人或者他们的代理人补征。
某债券面值为100元,发行价为97元,期限为90天,到期按面值偿还。[2015年12月真题]30天后,市场利率为6%,该债券的内在价值为()。
《贷款通知》规定:银行在短期贷款到期()之前,中长期贷款到期()之前,应当向借款人发送订本付息通知单。
根据税收征收管理法律制度的规定,实行定期定额缴纳税款的纳税人,在法律、行政法规规定的期限或者在税务机关按照法律、行政法规的规定确定的期限内缴纳税款的,可以视同申报。()
物权人在其物权受到妨害后,可以直接向侵害人提出的请求有()。
Whenwespeakofabasichumanneed,wemeansomethingwhichisnecessarytolife,somethingthatwecannotpossiblydowithout.
最新回复
(
0
)