首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals Why is the class discussing the technical requirements of murals?
Art Murals Why is the class discussing the technical requirements of murals?
admin
2013-04-25
69
问题
Art Murals
Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:https://kaotiyun.com/show/ySyO777K
0
托福(TOEFL)
相关试题推荐
SECTION2Questions11-20Questions11-13Completethetablebelow.WriteNOMORETHANTHREEWORDSORANUMBERforeachanswer
SECTION2Questions11-20Questions11-15AnswerthefollowingquestionsusingNOMORETHANTWOWORDSforeachanswer
SECTION4Questions31-40Questions31-33Completethefollowingsentencesaccordingtotheinformationgivenbythetutor.Use
SECTION2Questions11-20Questions11-13Choosethecorrectanswerstothefollowingquestions.OnlyONEanswerispossiblef
PrairieDogbarkshave______meanings.【35】
Whenisthedeadlineforhandingindissertations?WhatwillthestudentsprobablyspendthesecondhalfofAprildoing?
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Choosethecorrectletter,A,BorC.Grace’sCreekActivityCampOnebuildinghasnotbeendecidedyet,butwillprobablybe
conversation本题询问该项目的工作内容。录音原文中的assistingwith是题目helpingwith的同义替换。英语教学项目的主要任务是帮助提高当地人说英语(Englishconversation)的能力,故空格处填入conversa
随机试题
A、术前清洁肠道给予20%甘露醇250ml顿服B、术前禁食、禁药、给予哌替啶肌肉注射达到止痛目的C、术前只需禁食、禁药D、术前晚上服用泻剂,给予番泻叶以清洁肠道E、术前无需禁食、禁药、禁水以上哪项属于胃镜检查的术前准备()
可传播乙型肝炎病毒的途径有
关于年轻恒牙牙髓组织特点正确的是
男孩,2岁。右腹股沟包块,卧位可消失,右侧阴囊内未触及睾丸。B超示右侧睾丸位于右腹股沟。正确的治疗方法是
观察是幼儿园教师获得幼儿个体和群体信息的主要途径。
人们越来越重视地理环境在社会存在和发展中的作用.这是因为()。
交互记忆,指的是当由两个或以上的个体组成的团体经过长时间一起工作生活之后,他们之间会分享存储的记忆。个体不一定需要记忆所有的信息,而只需要记住群体内那些成员是哪方面信息的专家即可,当需要这方面信息时就可以向其询问。通过这种方式,本应存储于每个个体中的记忆被
一名粒子物理学家开玩笑说:自1950年以来,所有的费米子都是在美国发现的,所有的玻色子都是在欧洲发现的。很遗憾,希格斯粒子是玻色子,所以,它不可能在美国被发现。必须补充下面哪一项假设,上述推理才能成立?A.即使某件事情过去一直怎样,它未来也有可能
抗战胜利后,美国对华的政策目标包括()
ScientistsWorryMachinesMayOutsmartManArobotthatcanopendoorsandfindelectricaloutletstorechargeitself.Compu
最新回复
(
0
)