首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
Adam Smith, writing in the 1770s, was the first person to see the importance of the division of labor and to explain part of its
Adam Smith, writing in the 1770s, was the first person to see the importance of the division of labor and to explain part of its
admin
2015-06-11
18
问题
Adam Smith, writing in the 1770s, was the first person to see the importance of the division of labor and to explain part of its advantages.He gives as an example the process by which pins were made in England.
"One man draws out the wire; another strengthens it; a third cuts it; a fourth points it; a fifth grinds it at the top to prepare it to receive the head.To make the head requires two or three operations.To put it on is a separate operation, to polish the pins is another.And the important business of making pins is, in this manner, divided into about eighteen operations, which in some factories are all performed by different people, though in others the same man will sometimes perform two or three of them."
Ten man, Smith said, in this way, turned out twelve pounds of pins a day or about 4, 800 pins per worker.But if all of them had worked separately and independently without division of labor, none of them could have made twenty pins in a day and perhaps not even one.
There can be no doubt that division of labor is an efficient way of organizing work.Fewer people can make more pins.Adam Smith saw this but he also took it for granted that division of labor is in itself responsible for economic growth and development and that it accounts for the difference between expanding economies and those that stand still (停滞不前).But division of labor adds nothing new; it only enables people to produce more of what they already have.
Adam Smith saw that the division of labor______.
选项
A、enabled each worker to make pins more quickly and more cheaply
B、increased the possible output per worker
C、increased the number of people employed in factories
D、improved the quality of pins produced
答案
B
解析
从文章的第三段可知B项为最佳选择。A项中说工人们能更廉价地生产大头针,这一点文章没有提及。C和D两项也是文章没有提到的。
转载请注明原文地址:https://kaotiyun.com/show/yUQi777K
0
在职申硕(同等学力)英语
相关试题推荐
Nearlyeleventhousandpeoplehavebeenarrestedfordefyingthebanonstreettrading.
HowmanydollarsdidMissJoanhandtoMr.Greenly?"MissJoan’sgoodmoodwasnowhistory"(thelastparagraph)means______
YoucanusetheCourseCalendartohelp______yourstudentsofimportantdatesinthecourse,suchastestdates.
Thecoachexplainedtheregulationsatlengthtomakesurethatnoneofhisplayerswouldbecomeviolators.
AtlastJohnSmithchosetostepdownasthecompany’schiefexecutiveandreturntohisrootsinsoftwareresearch.
Comparedwiththeircosmologist(宇宙学家)colleagues,cosmogonists(星源学家)cansoundalittleold-fashioned.EdgarAllenPoeturnedto
Shoppingmallscustomarilyexperiencesomeslackperiodsforsales,especiallysoinsummer.
Several_____forglobalwarminghavebeensuggestedbyclimateresearchers.
Therearesomeearthphenomenayoucancounton,butthemagneticfield,somesay,isnotoneofthem.Itfluctuatesinstrength
随机试题
为方便计算,可将( )合并在一起计算,以工程成本加利润为基数计算税金。
收入能否可靠计量,是确认收入的基本前提。()
阅读契诃夫《苦恼》中的文字:暮色昏暗。大片的湿雪绕着刚点亮的街灯懒洋洋地飘飞,落在房顶、马背、肩膀、帽子上,积成又软又薄的一层。车夫姚纳·渡达波夫周身白,像是一个幽灵。他在赶车座位上坐着,一动也不动,身子往前伛着,伛到了活人的身子所能伛
治疗犬的上消化道出血可用()。
A、恒速阶段B、加速阶段C、降速阶段D、停滞阶段E、变速阶段物料中湿含量小于临界湿含量时的干燥过程属于
根据《建设工程质量管理条例》,下述关于在正常使用条件下建设工程的最低保修期限表述错误的选项是:
某公路桥梁工程结构物的流水施工的进度计划双代号网络图和节点时间参数如下:挖3工序的总时差是()。
Toomanypeoplethinkthatintelligenceisagiftofnatureandthatthereislittleanyonecandotoimprovetheirs.【T1】IQtest
Inearlytimes,bookconsistedofinscribedclaytablets,rollsofpapyrus,(1)______sheetsofparchment,orothermaterials.
人造岛
最新回复
(
0
)