首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
43
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M9】
选项
答案
THIS
解析
此处with the client or contractor中的the client or contractor一同作with的介词宾语,无需特定指代,故THIS多余。
转载请注明原文地址:https://kaotiyun.com/show/yeoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
•Therearethirtyquestionsonthisquestionpaper.•Instructionsaregivenonthetape.•YoucanwriteonthisQuestionPape
ThemergerwasexpectedtohelpthecombinedcompanytoTheChairman’splansforimprovingthecompany’sperformanceinclude
WhatdoPOPprojectsaimtodo?WhyhasinterestinPOPbeenslowtodevelop?
•Youwillhearfiveshortrecordings.Eachspeakerissayingwhatamanagermustdotoachievesuccess.•Foreachrecording,d
•Lookatthenotebelow.•Youwillhearamanleavingamessageonanansweringmachine.
•Lookatthenotebelow.•Youwillhearamancallingaboutmeetingwithsomebody.FRENCHBUSINESSTRIP:Wed2/10-10-Fri4/10Ap
TheNationalWeatherCentre’smostrecentcustomersareWhatpositivefeedbackhavestaffgivenaboutthenewlocation?
What’stheespeciallybigissuethatholdsbacktheInternet?WhatisthespecialfeatureofEffnet’sfirewallsystem?
—Readthearticleaboutchoosinganagent.—Inmostofthelines34~45thereisoneextraword.Itiseithergrammaticallyincor
—Readthearticleaboutinterviewbelow.—Choosethebestsentencetofillineachofthegaps.—Foreachgap8-12,markonelet
随机试题
国际企业在进行融资战略设计时应注意的特殊问题主要有()
Whatcansolvethisproblem?Thefactisthatpollutioniscausedbymanbyhisgreedandhismodernwayoflife.
A、控制的标准必须是统一的、合理的B、有效控制系统应是合理、适用的C、控制手段应顾及到例外情况的发生D、控制系统应能及时发现偏差信息E、有效控制系统依赖于准确的数据有效控制的特征中,“强调例外”指的是
肿瘤发生的内在因素不包括
肝硬化腹水使用大剂量强利尿剂易引起的严重副作用为
对金额有错误的原始凭证,正确的做法是()。
某中学高三(2)班排队,全班一共有56人,排成一条长队。从前面数,张明是第32人,从后面数,李红是第47人。请问张明和李红中间一共有多少同学?()
针对“海内新定,同姓寡少”的特点,西汉统治者采取了下列哪一项措施?()
Howwillthewomangotowork?
A、Becauseheisaclosefriend.B、Becauseheisfunnyandattractive.C、Becauseheisundependable.D、Becauseheisalittleboy
最新回复
(
0
)