Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
Read the article below about the function of a project coordinator. In most of the lines(34-45), there is one extra word. It
admin
2015-04-23
52
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible.
【M9】
选项
答案
THIS
解析
此处with the client or contractor中的the client or contractor一同作with的介词宾语,无需特定指代,故THIS多余。
转载请注明原文地址:https://kaotiyun.com/show/yeoO777K
本试题收录于:
BEC中级阅读题库BEC商务英语分类
0
BEC中级阅读
BEC商务英语
相关试题推荐
•Therearethirtyquestionsonthisquestionpaper.•Instructionsaregivenonthetape.•YoucanwriteonthisQuestionPape
WhatdoPOPprojectsaimtodo?WhydolargestoreswanttocontrolPOPcampaigns?
•Youwillhearfiveshortrecordings.Eachspeakerissayingwhatamanagermustdotoachievesuccess.•Foreachrecording,d
•Inthispartyoulistentwicetoalongconversation,interviewormonologue,andanswereightquestions.•Beforeyoulisten,
Thejobvacancyisfor______.MrBenndisagreedwiththeManagerabout______.
•Lookatthenotesbelow.•Youwillhearatelephoneconversationaboutarrangingameeting.Needtodiscuss(9)______
•Lookatthenotesbelow.•YouwillheartwocolleaguesdiscussingtheresponsibilitiesofHumanResourcesManagerJobDe
TheretailcompanyyouworkforisconsideringinstallingaTVsysteminitsstoretogivecustomersinformationonproductsand
YouworkintheHumanResourceDepartmentofacompany,andyourdirectorwantsyoutofindoutwhichmethodsofjobadvertising
—Readthetextbelowaboutjobadvertisement.—Inmostofthelines41-52thereisoneextraword.Itiseithergrammaticallyin
随机试题
炒用可增强补气健脾止泻作用的药物是()(2010年第40题)
Ihearmanyparentscomplainingthattheirteen-agechildrenarerebelling.Iwishitwereso.Atyourageyououghttobegrowi
体表血络扩张,纵横丛集形成的肿瘤是
重氮化反应受多种因素的影响,测定中的主要条件有以下几种
证券公司在下列事项中,需要国务院证券监督管理机构审批的事项有()
A、B公司均系增值税一般纳税人,A公司以一项专利权换入B公司的一批库存商品并作为存货管理。换出专利权的账面原价为300000元,累计摊销30000元,应交营业税12000元;换入库存商品可抵扣的增值税税额为34000元,A公司向B公司收取补价40
不以荣为荣,不以耻为耻,甚而以耻为荣,是()的表现。
小丽一大早到公司,发现自己桌子上有一束玫瑰花,同事小王经过仔细分析,认为是客户张总送的,小丽则认为不可能。但是小王说,其他可能性都被排除了,剩下的可能性不管看起来多荒谬,都是真的。以下哪项如果为真,最能削弱小王的说法?
某饭局上有四个商人在谈生意,他们分别是甲省人、乙省人、丙省人和丁省人。他们做的生意分别是加工、批发和零售。其中:(1)丁省人单独做批发。(2)丙省人不做加工。(3)甲省人和另外某省人同做一种生意。(4)乙省人不和甲省人同
下列关于罪数的表述中,正确的是()
最新回复
(
0
)