Service Request — Maintenance Department (Stubbs College) - Paint all of the walls in the gymnasium and cafe

admin2020-04-13  37

问题                    Service Request — Maintenance
                   Department (Stubbs College)
- Paint all of the walls in the gymnasium and cafeteria
- Fix the hinges of the two broken doors in the Science Department
- Replace the cracked window in the administration building
- Varnish the floors in both the assembly hall and sports hall
What problem does the man mention?
Hello, Mr. Levinson. This is David Wilson, the head of the Maintenance Department here at Stubbs College. I received your message asking why the tasks you assigned me have not yet been fully completed. You’ll be please to know that I’ve repaired the doors in the Science Department and installed a brand-new window in the administration building. The reason the other jobs are not done yet is that my assistant is out with the flu right now. He should be back at work next Monday, so we’ll get the painting and varnishing done as soon as possible. By the way, the sports hall is much larger than I had guessed, so I had to spend some extra money to get more materials. However, I’m sure the college will approve the extra expenditure.

选项 A、An item is unavailable.
B、A part cannot be replaced.
C、An employee is absent.
D、A device has malfunctioned.

答案C

解析 问题主要在电话留言的中间部分出现,和转折表达方式或说明原因的表达方式一起出现。说话人在留言的中间部分说,“The reason the other jobs are not done yet is that my assistant is out with the flu right now.”其他工作没有完成是因为助手因流感没有上班,由此可知(C)是正确答案。
转载请注明原文地址:https://kaotiyun.com/show/zEOd777K
0

最新回复(0)